Person / Time | |
---|---|
Site: | McGuire |
Issue date: | 07/28/2016 |
From: | Duke Energy Carolinas |
To: | |
Sreenivas V, NRR/DORL/LPLII-1, 415-2597 | |
References | |
RR-16-MN-003 | |
Download: ML16210A038 (7) | |
Similar Documents at McGuire | |
---|---|
Category:Code Relief or Alternative
MONTHYEARML24207A0862024-07-24024 July 2024
[Table view]Relief Request Acceptance Review Results - McGuire Units 1 and 2 Alternatives Component Cooling Pumps, RHR Pumps ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23230A0652023-08-31031 August 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Relief Request Use of Later Edition of ASME Code ML23159A2712023-06-20020 June 2023 William B. McGuire Nuclear Station, Unit 1 - Relief Request Impractical Reactor System Welds ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI RA-22-0257, Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-02-17017 February 2023 Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22266A0782022-09-26026 September 2022 William B. Mcguire Nuclear Station, Unit 2 Pressurizer Power Operated Relief Valve Relief Request ML22242A1602022-08-30030 August 2022 Hardship Relief Request Pilot-Operated Relief Valve Acceptance Review Results ML21306A1592021-11-16016 November 2021 Request to Use Provisions of Later Edition and Addenda of the ASME Code, Section XI (EPID; L-2021-LLR-0048) ML21029A3352021-02-16016 February 2021 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20230A2052020-08-21021 August 2020 Relief Request RA-20-0031, Delay to Update the Code of Record for Inservice Inspection ML19217A3242019-08-14014 August 2019 Relief Request MC-SRV-NC-03, Alternate Testing for Pressurizer Power Operated Relief Valve Block Valve 2NC-35B RA-19-0026, Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001)2019-02-11011 February 2019 Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001) RA-18-0180, Supplement to Relief Request for an Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 22018-11-12012 November 2018 Supplement to Relief Request for an Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 ML17331A0862017-12-26026 December 2017 Alternative to Inservice Inspection Regarding Reactor Pressure Vessel Threads ML17034A3622017-02-22022 February 2017 Mcguire Nuclear Station, Unit 1 - Request 16-MN-002, Alternative to Defect Removal Prior to Performing Repair Activities on Nuclear Service Water System Piping Relief ML16358A6962017-01-17017 January 2017 Proposed Relief Request MC-SRV-NC-02, Alternate Testing for Pressurizer Power Operated Relief Valve (Porv) Block Valve 2NC-31B ML16266A0262016-10-18018 October 2016 Proposed Relief Request Serial No. 16-MN-003 for Alternate Repair of Nuclear Service Water Piping ML16294A2542016-10-13013 October 2016 Response to Request for Additional Information Regarding Relief Request 16-MN-002, Alternative to Defect Removal Prior to Performing Repair Activities on Nuclear Service Water System Piping ML16225A6542016-08-11011 August 2016 Email - McGuire Unit No. 1: Acceptance REVIEW- Relief Request 16-MN-003 Alternative to Defect Removal Prior to Performing Temporary Repair Activities on Three-Inch-Diameter Nuclear Service Water System Piping. MNS-16-062, Relief Request 16-MN-003 Alternative to Defect Removal Prior to Performing Temporary Repair Activities on Three-Inch-Diameter Nuclear Service Water System Piping2016-08-10010 August 2016 Relief Request 16-MN-003 Alternative to Defect Removal Prior to Performing Temporary Repair Activities on Three-Inch-Diameter Nuclear Service Water System Piping ML16210A0382016-07-28028 July 2016 Draft Relief Request Serial No. 16-MN-003 MNS-16-053, Relief Request 16-MN-002, Alternative to Defect Removal Prior to Performing Repair Activities on Nuclear Service Water System Piping2016-06-23023 June 2016 Relief Request 16-MN-002, Alternative to Defect Removal Prior to Performing Repair Activities on Nuclear Service Water System Piping ML16152A6012016-06-0808 June 2016 Withdrawal of Relief Request ML15232A5432015-08-27027 August 2015 Proposed Relief Request 15-MN-001 ML14188C3482014-07-14014 July 2014 Proposed Relief Request 13-MN-002 ML14013A2422014-01-17017 January 2014 Proposed Relief Request Nos. MC-SRP-KC-01 and MC-SRP-ND-01 (TAC Nos. MF1164, MF1165, MF1166 and MF1167 ML13294A6092013-11-0808 November 2013 Proposed Relief Request 12-MN-004 (TAC Nos. MF0508, MF0514, and MF0515) ML13010A5542013-01-14014 January 2013 Proposed Relief Request 12-MN-002 ML12355A1492012-11-29029 November 2012 Relief Request Serial # 12-MN-004 Limited Weld Examinations ML12264A3382012-09-24024 September 2012 Correction Letter for Approval Letter and Safety Evaluation for Relief Request 11-MN-002 Regarding the Extension of the Inservice Inspection Interval for Reactor Vessel Category B-A and B-D Welds ML12123A1122012-05-0909 May 2012 Request for Relief 12-MN-001, Relief Request for a Alternative Depth Sizing Criteria ML11160A1442011-06-23023 June 2011 Relief 10-MN-002, Extension of Volumetric Inspection of Steam Generator Primary Manway Studs for One Operating Cycle Beyond the Third 10-Year Inservice Inspection Interval End Date ML1015804222010-06-14014 June 2010 Relief 09-MN-005 for Alternative Leakage Testing for Various American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) Class 1 Piping and Components During the Third 10-Year Inservice ML1006200182010-03-0404 March 2010 Relief 09-MN-007 for Reactor Vessel Core Flood Nozzle Weld Examinations During the Third 10-Year Inservice Inspection ML0911400662009-05-13013 May 2009 Request for Relief 08-MN-003 for Reactor Vessel Hot Leg Nozzle to Safe End and Safe-End to Pipe Welds Examinations, TAC MD9614 ML0921706582009-05-0404 May 2009 Submittal of Relief Request Serial No. 09-MN-002 ML0814904712008-05-16016 May 2008 Relief Request 08-MN-001 ML0715604162007-06-0808 June 2007 Withdrawal of Relief Requests Associated with Pump Vibration (MD3253 Through MD3290) ML0712102492007-04-19019 April 2007 Relief Request 07-GO-0001. Proposed Alternative Approach Supports Application of Full Structural Weld Overlays on Various Pressurizer Nozzle-to-Safe End Welds ML0626202612006-09-11011 September 2006 Relief Request 06-GO-001 Request for Additional Information ML0615303872006-08-16016 August 2006 Request for Relief 05-MN-01, for Third 10-Year Interval Inservice Inspection Program Plan ML0634903992006-07-27027 July 2006 Relief Request 06-GO-001 ML0524502572005-09-0606 September 2005 Relief Requests for Third 10-Year Pump & Valve Inservice Testing Program ML0514601792005-05-23023 May 2005 Request for Relief, ISI Request for 04-MN-02, 04-MN-03 and 04-MN-04 ML0506105662005-03-18018 March 2005 Review of RR-03-05, Pressurizer Support Skirt Welds ML0506704672005-02-24024 February 2005 Inservice Testing Program Relief Request MC-SRP-NS-01, Request for Additional Information (RAI) ML0434400722004-12-0202 December 2004 Supplement to Relief Request No. 01-003 2024-07-24 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML16210A038&oldid=1412404"