ML20143A2333 June 2020Relief Request for Deferral of ASME Boiler and Pressure Vessel Code, Section XI, Required Summary Report Submittal (EPID L-2020-LLR-0074 (COVID-19))Incorporated by reference
Coronavirus
ML20034E89411 February 2020Relief Request Gen-ISI-ALT-2019-01 for Proposed Alternative to Use of ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1Incorporated by reference
ML19361A0569 January 2020Proposed Alternative HNP-ISI-ALT-05-10 for the Implementation of BWRVIP 38 and -76 in Lieu of B-N-2 Examinations for Core Support StructuresIncorporated by reference
Aging Management
EVT-1
NL-19-1336, Implementation of BWRVIP-38 and -76 in Lieu of B-N-2 Examinations for Core Support Structures4 November 2019Implementation of BWRVIP-38 and -76 in Lieu of B-N-2 Examinations for Core Support StructuresEVT-1
ML19192A1712 August 2019Relief from Inservice Impractical ASME Code Requirements (FNP-ISI-RR-03)Boric Acid
Non-Destructive Examination
Liquid penetrant
ML18334A22810 December 2018Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-03Earthquake
Dissimilar Metal Weld
ML18320A05730 November 2018Plant, Units 1 and 2 - Proposed Inservice Inspection Alternative GEN-ISI-ALT-2017-03, Code Case N-513-4 for Moderate PressureIncorporated by reference
Through-Wall Leak
NL-18-0713, Request for Alternative HNP-ISI-ALT-05-08 to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping for Hatch Unit 1 Plant Service Water17 May 2018Request for Alternative HNP-ISI-ALT-05-08 to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping for Hatch Unit 1 Plant Service WaterThrough-Wall Leak
Through Wall Leak
NL-18-0408, Proposed Alternative RR-V-12 Regarding Main Steam Safety Relief Valve Testing9 April 2018Proposed Alternative RR-V-12 Regarding Main Steam Safety Relief Valve TestingGrace period
NL-18-0428, Withdrawal of Proposed Alternative GEN-ISI-ALT-2017-001 Implementation of Code Case N-786-19 April 2018Withdrawal of Proposed Alternative GEN-ISI-ALT-2017-001 Implementation of Code Case N-786-1
ML17354A91628 December 2017Inservice Inspection Alternative FNP-ISI-ALT-05-01, Version 1, to Use ASME Code N-854 (CAC Nos. MG0107 and MF0108; EPID L-2017-LLR-0086)Incorporated by reference
ML17298A4161 November 2017Relief Request FNP-ISI-ALT-22, Inservice Inspection Alternative for Code Case N-786-1
ML17279A04526 October 2017Relief Requests ISI-RR-13, -14, -18, -19, -23, and -24 for Relief from Inservice Inspection RequirementsWeld Overlay
VT-2
ML17268A04420 October 2017Relief Requests ISI RR 16, ISI-RR-17, ISI-44-21, and ISI-RR-22 for Relief from Inservice Inspection RequirementsVT-2
ML17205A34510 August 2017Relief Request HNP-ISI-RR- 05-01 Regarding Reactor Pressure Vessel Head Stud Inservice Inspection RequirementsVT-2
Finite Element Analysis
ML17121A05918 May 2017Inservice Inspection Alternative (FNP-ISI-ALT-20)Boric Acid
High Radiation Area
VT-2
Incorporated by reference
Through-Wall Leak
Through Wall Leak
ML17062A83229 March 2017Relief Request ISI RR-15 Regarding Control Rod Drive Housing Welds Inservice Inspection RequirementsVT-2
Incorporated by reference
ML17006A10926 January 2017Alternative to Inservice Inspection Regarding Reactor Pressure Vessel Threads Inflange InspectionIncorporated by reference
ML16323A3026 December 2016Alternative to Inservice Inspection Regarding Spent Fuel Pool Cooling System Drain Line WeldNondestructive Examination
VT-2
Through-Wall Leak
ML16314A13223 November 2016Request for Alternative HNP-ISI-ALT-05-03, Version 1.0, Regarding Reactor Pressure Vessel Flange Leak-Off PipingVT-2
Incorporated by reference
ML16264A32114 October 2016Alternatives for Pumps and Valves Inservice Testing Program
ML15310A40630 December 2015Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year IntervalStroke time
Incorporated by reference
Surveillance Frequency Control Program
Scram Discharge Volume
Power-Operated Valves
Scaffolding
Grace period
ML15352A29428 December 2015Relief from the Requirements of the ASME CodeWeld Overlay
Nondestructive Examination
Incorporated by reference
ML15349A97318 December 2015Relief from the Requirements of the ASME CodeWeld Overlay
Nondestructive Examination
Liquid penetrant
Through-Wall Leak
Dissimilar Metal Weld
NL-15-0942, Proposed Lnservice Inspection Alternative FNP-ISI-ALT-18, Version 1.017 July 2015Proposed Lnservice Inspection Alternative FNP-ISI-ALT-18, Version 1.0Probabilistic Risk Assessment
Pressure and Temperature Limits Report
NL-15-1265, E.I Hatch, Units 1 and 2 - 10CFR 50.55a Request No. HNP-ISI-ALT-5-01, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Maintaining Isi/Cii Related Activities on the 2001 E/2003A ASME Section XI Code16 July 2015E.I Hatch, Units 1 and 2 - 10CFR 50.55a Request No. HNP-ISI-ALT-5-01, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Maintaining Isi/Cii Related Activities on the 2001 E/2003A ASME Section XI CodeWeld Overlay
Nondestructive Examination
Incorporated by reference
NL-15-1221, Withdrawal of RR-V-2 and Response to Request for Additional Information on RR-V-116 July 2015Withdrawal of RR-V-2 and Response to Request for Additional Information on RR-V-1Stroke time
NL-15-1096, Provides Follow-up Letter Regarding Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval18 June 2015Provides Follow-up Letter Regarding Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval
ML15104A1925 May 2015Alternative to Inservice Inspection Regarding Reactor Closure Head Closure Head Nozzle and Partial Penetration WeldsDM weld
ML14262A3175 December 2014(FNP-ISI-ALT-15, Version 1) Alternative to Inservice Inspection Regarding Reactor Pressure Vessel Cold Leg Nozzle Dissimilar Metal Welds (TAC Nos. MF3687 and MF3688)Dissimilar Metal Weld
DM weld
ML14252A07623 September 2014Alternative to Inservice Inspection for Reactor Vessel Flange Leak-off LinesBoric Acid
Hydrostatic
VT-2
Incorporated by reference
Foreign Material Exclusion
ML14169A19511 July 2014Alternative Request Regarding Containment Building Tendon Examination ScheduleGrace period
NL-11-1543, Response to NRC Request for Additional Information Proposed Relief Request FNP-ISI-RR-0111 August 2011Response to NRC Request for Additional Information Proposed Relief Request FNP-ISI-RR-01Dissimilar Metal Weld
NL-11-0162, Submittal of Revision to Relief Request RR-V-4 Fourth 10-Year Interval Inservice Testing Program26 January 2011Submittal of Revision to Relief Request RR-V-4 Fourth 10-Year Interval Inservice Testing ProgramStroke time
ML11005049414 January 2011Safety Evaluation of Relief Request HNP-ISI-ALT-10, Version 1, for the Fourth 10-Year Inservice Inspection Interval Temporary Non-Code Repair of Service Water Piping, TAC ME4253Nondestructive Examination
VT-2
Functionality Assessment
Liquid penetrant
Through-Wall Leak
ML10203044422 July 2010E-mail from Robert Martin, Regarding Verbal Authorixation of Relief - Note to File
ML10203045221 July 2010Verbal Authorization for Relief Request HNP-ISI-ALT-10 Temporary Non-code Repair of Service Water PipingVT-2
ML10175040212 July 2010Relief Request for Extension of the Reactor Vessel Inservice Inspection (ISI) Date to the Year 2020 (Plus or Minus One Outage) (Tac No. ME3010)Incorporated by reference
ML1009802148 April 2010Safety Evaluation of Relief Request HNP-ISI-ALT-09, Version 2.0, for the Fourth 10-year Inservice Inspection IntervalHydrostatic
VT-2
Incorporated by reference
ML1005603342 March 2010Safety Evaluation of Relief Request FNP-ISI-ALT-08 Version 1.0 for Reactor Vessel Nozzle to Safe-end Dissimilar Metal Weld and Adjacent Austenitic Safe-end Weld ExaminationsIncorporated by reference
Dissimilar Metal Weld
NL-09-1379, Evaluation Results Associated with Relief Request RR-P-38 September 2009Evaluation Results Associated with Relief Request RR-P-3
ML09173007529 June 2009(Fnp), Units 1 and 2, Evaluation of Third 10-Year Interval Inservice Inspection Program Plan Requests for ReliefNondestructive Examination
VT-2
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld
ML0820500026 August 2008Safety Evaluation on Relief Request RR-P-2, RR-P-3 from ASME OM Code RequirementsBoric Acid
Incorporated by reference
ML0731301886 December 2007Safety Evaluation for Alternative ISI-ALT-08
NL-07-1718, Relief Request RR-60 (Version 2.0) Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(ii)12 September 2007Relief Request RR-60 (Version 2.0) Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(ii)High Radiation Area
VT-2
ML0713602975 June 2007Relief, Evaluation of Third 10-Year Interval Inservice Inspection Program Plan Request to Relief Nos. RR-42 Through RR-45, RR- 51, RR-58, RR-59, RR-60, & RR-62VT-2
Incorporated by reference
ML07059030830 March 2007Safety Evaluation of Revised Relief Request RR-12 for the Third-Year Interval and Examination Program for SnubbersIncorporated by reference
ML06277035929 September 2006Evaluation of Relief Request ISI-GEN-ALT-06-02Incorporated by reference
Dissimilar Metal Weld
NL-06-1713, Proposed Alternative for Application of Pressurizer Nozzle Full-Structural Weld Overlays10 August 2006Proposed Alternative for Application of Pressurizer Nozzle Full-Structural Weld OverlaysWeld Overlay
Hydrostatic
Nondestructive Examination
Liquid penetrant
Dissimilar Metal Weld
ML06083022128 March 2006Request for Relief No. RR-57 and RR-58 Regarding Containment Tendon Inspections