 Issue dateTitleTopic
ML22115A06022 April 2022Application for Technical Specification Change TSTF-491, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications Using Consolidated Line Item Improvement ProcessUltimate heat sink
Incorporated by reference
ML21102A1279 April 2021(Vcsns), Unit 1 - Application for Technical Specification Change Regarding Risk Informed Justification for the Relocation of Specific Surveillance Frquency Requirements to Licensee-Controlled ProgramBoric Acid
High winds
Shutdown Margin
Ultimate heat sink
Mission time
Grab sample
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Incorporated by reference
FLEX
Surveillance Frequency Control Program
Large early release frequency
Earthquake
Pressure Boundary Leakage
Fire Protection Program
Fire Watch
Power change
RC-17-0107, (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change6 October 2017(Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change
ML14010A18228 February 2014Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-510Nondestructive Examination
ML11332A07815 November 2011License Amendment Request - LAR-06-00055 - License Amendment Request to Adopt NFPA 805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition). Part 2 of 2Hot Short
Safe Shutdown
Mission time
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Internal Flooding
Probabilistic Risk Assessment
Operator Manual Action
Multiple Spurious Operation
Emergency Lighting
B.5.b
Thermoset
Process Control Program
Maintenance Rule Program
Fire Protection Program
RC-09-0068, License Amendment Request - LAR 09-00562, for Use of Optimized Zirlo Fuel Rod Cladding9 June 2009License Amendment Request - LAR 09-00562, for Use of Optimized Zirlo Fuel Rod CladdingShutdown Margin
Exemption Request
Fuel cladding
RC-09-0012, License Amendment Request LAR 08-01332, for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR 262 March 2009License Amendment Request LAR 08-01332, for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR 26Safe Shutdown
RC-09-0004, License Amendment Request - LAR 04-02911 License Amendment and Related Technical Specification Changes to Implement Full-scope Alternative Source Term in Accordance with 10 CFR 50.6717 February 2009License Amendment Request - LAR 04-02911 License Amendment and Related Technical Specification Changes to Implement Full-scope Alternative Source Term in Accordance with 10 CFR 50.67Shutdown Margin
Ultimate heat sink
Safe Shutdown Earthquake
Met Tower
Large early release frequency
Operability Determination
Deep Dose Equivalent
Fuel cladding
Pressure Boundary Leakage
Backfit
ML07110030110 May 2006Offsite Dose Calculation ManualGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
ML0604002206 February 2006Virgil C. Summer Nuclear Station License Amendment Request - LAR 05-0677 On-Line Monitoring of Instrument Channel Performance
RC-05-0181, Elimination of Requirements to Provide the Monthly Operating Report and the Occupational Radiation Exposure Report Using the Consolidated Line Item Improvement Process29 November 2005Elimination of Requirements to Provide the Monthly Operating Report and the Occupational Radiation Exposure Report Using the Consolidated Line Item Improvement ProcessHigh Radiation Area
Incorporated by reference
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
RC-03-0194, License Amendment Request - LAR 03-1901 Surveillance Requirement 4.2.4.2 and Associated Bases19 September 2003License Amendment Request - LAR 03-1901 Surveillance Requirement 4.2.4.2 and Associated Bases
RC-03-0159, License Amendment Request - LAR 03-1864, Surveillance Requirement 4.0.5 & Associated Bases29 July 2003License Amendment Request - LAR 03-1864, Surveillance Requirement 4.0.5 & Associated BasesTime of Discovery
Incorporated by reference
Pressure Boundary Leakage
Grace period
RC-03-0007, License Amendment Request - LAR 02-2767 Steam Generators - One-Time Exclusion of Inspection Frequency14 January 2003License Amendment Request - LAR 02-2767 Steam Generators - One-Time Exclusion of Inspection FrequencyOperating Basis Earthquake
Foreign Material Exclusion
RC-03-0006, License Amendment Request - LAR 02-2820, Emergency Core Cooling Systems - Exclusion of Safety Injection Pumps from Requirement to Vent ECCS Pumps14 January 2003License Amendment Request - LAR 02-2820, Emergency Core Cooling Systems - Exclusion of Safety Injection Pumps from Requirement to Vent ECCS PumpsShutdown Margin
ML0234004903 December 2002Technical Specification Amendment Request - TSP 99-0090 Spent Fuel Pool Storage Expansion - Supplemental Letter Revision to Testing Plan for the Temporary Crane
RC-02-0176, Letter Regards TS Amendment Request - TSP 00-0075 Emergency Feedwater System Isolation Valves Project Delay Letter14 October 2002Letter Regards TS Amendment Request - TSP 00-0075 Emergency Feedwater System Isolation Valves Project Delay Letter
RC-02-0147, Technical Specification Amendment Request TSP 01-0235, Revision to Emergency Diesel Generator Start Time Surveillance Requirement24 September 2002Technical Specification Amendment Request TSP 01-0235, Revision to Emergency Diesel Generator Start Time Surveillance RequirementSafe Shutdown
Offsite Circuit
ML02247019030 August 2002Virgil C Summer Unit 1, Technical Specification Pages for Amendment 160 Spent Fuel Pool ExpansionShutdown Margin
Ultimate heat sink
RC-02-0089, Tech Spec Amendment Request - TSP 99-0090 Spent Fuel Pool Storage Expansion - Supplemental Letter - Response to RAI Dated April 1, 20027 May 2002Tech Spec Amendment Request - TSP 99-0090 Spent Fuel Pool Storage Expansion - Supplemental Letter - Response to RAI Dated April 1, 2002
ML02106037711 April 2002Technical Specification Pages to Amendment 159
ML02078031212 March 2002Technical Specification Pages (Paper)Stroke time
ML0207203758 March 2002Technical Specification Pages for Amendment 157 for Virgil C. Summer, Unit 1
ML0206506885 March 2002Technical Specification Pages - Summer Unit 1, Amendment No. 156
RC-93-0310, (VCSNS) - Technical Specification Change - TSP 930011 Accident Monitoring Instrument17 December 1993(VCSNS) - Technical Specification Change - TSP 930011 Accident Monitoring InstrumentSafe Shutdown
Boric Acid
Reactor Vessel Water Level
Operator Manual Action