ML020650688

From kanterella
Jump to navigation Jump to search

Technical Specification Pages - Summer Unit 1, Amendment No. 156
ML020650688
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/05/2002
From: Edison G
NRC/NRR/DLPM/LPD2
To: Byrne S
South Carolina Electric & Gas Co
References
TAC MB2777
Download: ML020650688 (4)


Text

TABLE 3.3-3 (Continued)

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION TOTAL NO.

OF FUNCTIONAL UNIT CHANNELS

4. STEAM LINE ISOLATION
a. Manual
i.

One Switch/line ii. One Switch/all lines

b. Automatic Actuation Logic and Actuation Relays
c. Reactor Building Pressure-High-2
d. Steam Flow in Two Steam Lines--High COINCIDENT WITH Tavg-'Low-Low 1/steam line 1

2 3

2/steam line 1 Tavg/Ioop CHANNELS TO TRIP 1/steam line 1

1 2

1/steam line any 2 steam lines 1 Tavg any 2 loops MINIMUM CHANNELS OPERABLE 1/operating steam line 1

2 2

1/steam line 1 Tavg any 2 loops APPLICABLE MODES 1, 2, 3###

1, 2, 3###

1, 2, 3###

1, 2, 3###

1, 2, 3###

1, 2, 3###

CD C

m M

C z CO CA ACTION 23 23 21 24*

24*

24*

(D 3

03.

(D z

0

TABLE 3.3-3 (Continued)

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION FUNCTIONAL UNIT

e. Steam Line Pressure-Low
5. TURBINE TRIP & FEEDWATER ISOLATION
a. Steam Generator Water Level-High-High C')

C:

m z

3/loop CHANNELS TO TRIP 1 pressure any 2 loops 2/loop in any operating loop MINIMUM CHANNELS OPERABLE 1 pressure any 2 loops 2/loop in each oper ating loop APPLICABLE MODES 1, 2, 3##'###

1,2 TOTAL NO.

OF CHANNELS 1 pressure/

loop 4A, CA)

O, ACTION 24*

I 24*

3 (D

I 3

CD z

0

-I M-

TABLE 3.3-3 (Continued)

ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION FUNCTIONAL UNIT

7. LOSS OF POWER
a. 7.2 kv Emergency Bus Undervoltage (Loss of Voltage)
b. 7.2 kv Emergency Bus Undervoltage (Degraded Voltage)
8. AUTOMATIC SWITCHOVER TO CONTAINMENT SUMP
a. RWST level low-low
b. Automatic Actuation Logic and Actuation Relays
9. ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INTERLOCKS
a. Pressurizer Pressure, P-i 1
b. Low-Low Tavg, P-12
c. Reactor Trip, P-4 TOTAL NO.

OF CHANNELS 2-1/bus 2-1/bus 4

2 3

3 2

CHANNELS TO TRIP 1

MINIMUM CHANNELS OPERABLE 2

2 1

2 1

2 2

2 APPLICABLE MODES 1,2,3,4 1,2,3,4 1,2,3 1,2,3 1,2,3 1, 2, 3###

1,2,3 3

2 2

2 2

(l)

Cn m

C Z C,,

C,,

r, ACTION 18 18 16 21 20 20 22 3>

CD C

3 CD Z

0 I

TABLE 3.3-3 (Continued)

TABLE NOTATION

  1. Trip function may be blocked in this MODE below the P-1 1 (Pressurizer Pressure Interlock) setpoint.

Trip function may be blocked in this MODE below the P-12 (Low-Low Tavg Interlock) setpoint.

Except when below P-12 with all MSIVs and bypasses closed and disabled.

The provisions of Specification 3.0.4 are not applicable.

ACTION STATEMENTS ACTION 14 ACTION 15 ACTION 16 ACTION 17 ACTION 18 ACTION 19 -

With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; however, one channel-may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1, provided the other channel is OPERABLE.

DELETED With the number of OPERABLE channels one less than the Total Number of Channels operation may proceed provided the inoperable channel is placed in the bypassed condition and the Minimum Channels OPERABLE requirement is met. One additional channel may be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing per Specification 4.3.2.1.

With less than the Minimum Channels OPERABLE requirement, operation may continue provided the containment purge supply and exhaust valves are maintained closed.

With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

a.

The inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

b.

The Minimum Channels OPERABLE requirements is met; however, the inoperable channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing of other channels per Specification 4.3.2.1.

Amendment No. 4-1,1 56 SUMMER - UNIT 1 I

3/4 3-23