TAC:MB2821, (Approved, Closed) | |
MONTHYEARML0207203752002-03-0808 March 2002
[Table View]Technical Specification Pages for Amendment 157 for Virgil C. Summer, Unit 1 Project stage: Other ML0207108162002-03-0808 March 2002 Issuance of Amendment 157 Source Range Neutron Flux Instrumentation, TAC MB2821 Project stage: Approval 2002-03-08 |
ML020720375 | |
Person / Time | |
---|---|
Site: | Summer |
Issue date: | 03/08/2002 |
From: | Edison G NRC/NRR/DLPM/LPD2 |
To: | Byrne S South Carolina Electric & Gas Co |
References | |
TAC MB2821 | |
Download: ML020720375 (1) | |
Similar Documents at Summer | |
---|---|
Category:Technical Specification
MONTHYEARML23347A0492023-12-12012 December 2023
[Table view]Technical Specification Bases Changes Updated Through November 2023 ML22334A2722022-11-30030 November 2022 (VCSNS) Unit 1 - Technical Specification Bases Changes Updated Through November 2022 ML22115A0602022-04-22022 April 2022 Application for Technical Specification Change TSTF-491, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications Using Consolidated Line Item Improvement Process ML21349B3692021-12-15015 December 2021 Technical Specification Bases Changes Updated Through November 2021 ML21102A1272021-04-0909 April 2021 (Vcsns), Unit 1 - Application for Technical Specification Change Regarding Risk Informed Justification for the Relocation of Specific Surveillance Frquency Requirements to Licensee-Controlled Program ML20351A3312020-12-15015 December 2020 (Vcsns), Unit 1 - Technical Specificatio Bases Revisions Updated Through November 2020 ML19331A4682019-11-27027 November 2019 (Vcsns), Unit 1 - Technical Specification Bases Revisions Updated Through October 2019 ML18313A2392018-11-0909 November 2018 (Vcsns), Unit 1 - Technical Specification Bases Revisions Updated Through October 2018 ML17347A5212017-12-12012 December 2017 Technical Bases Revisions Updated Through November 2017 RC-17-0107, (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change2017-10-0606 October 2017 (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change RC-16-0097, Technical Specification Bases Revision Updated Through September 20162017-01-0404 January 2017 Technical Specification Bases Revision Updated Through September 2016 RC-16-0059, License Amendment Request LAR 12-02439, Technical Specification Change Request for TS 3.5.4 Refueling Water Storage Tank (RWST)2016-04-28028 April 2016 License Amendment Request LAR 12-02439, Technical Specification Change Request for TS 3.5.4 Refueling Water Storage Tank (RWST) RC-16-0043, License Amendment Request Technical Specification 3/4.7.1.2, Emergency Feedwater System.2016-04-0707 April 2016 License Amendment Request Technical Specification 3/4.7.1.2, Emergency Feedwater System. RC-16-0035, (VCSNS) Unit 1 - Exigent License Amendment Request - LAR (16-00848) Technical Specification Change Request for the Emergency Feedwater System Limiting Condition for Operation 3.7.1.2 Action B2016-03-0101 March 2016 (VCSNS) Unit 1 - Exigent License Amendment Request - LAR (16-00848) Technical Specification Change Request for the Emergency Feedwater System Limiting Condition for Operation 3.7.1.2 Action B RC-14-0086, Technical Specification Bases Revision Updated Through May 20142014-06-12012 June 2014 Technical Specification Bases Revision Updated Through May 2014 ML14010A1822014-02-28028 February 2014 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-510 RC-13-0084, Technical Specification Bases Revision Updated Through June 20132013-07-17017 July 2013 Technical Specification Bases Revision Updated Through June 2013 RC-13-0037, Virgil C. Summer Nuclear Station, Unit 1, License Amendment Request - LAR (13-00705) Technical Specification Change to Extend Integrated Leak Rate Test Frequency to 15 Years2013-04-0303 April 2013 Virgil C. Summer Nuclear Station, Unit 1, License Amendment Request - LAR (13-00705) Technical Specification Change to Extend Integrated Leak Rate Test Frequency to 15 Years ML13095A1092013-04-0303 April 2013 License Amendment Request - LAR (13-00705) Technical Specification Change to Extend Integrated Leak Rate Test Frequency to 15 Years ML12195A2372012-07-11011 July 2012 Technical Specification Bases Revision Updated Through June 2012 ML11332A0782011-11-15015 November 2011 License Amendment Request - LAR-06-00055 - License Amendment Request to Adopt NFPA 805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition). Part 2 of 2 RC-11-0094, Technical Specification Bases Revision Updated Through June 20112011-08-31031 August 2011 Technical Specification Bases Revision Updated Through June 2011 ML1016500492010-06-0909 June 2010 Technical Specification Bases Revision Updated Through January 2009 RC-09-0068, License Amendment Request - LAR 09-00562, for Use of Optimized Zirlo Fuel Rod Cladding2009-06-0909 June 2009 License Amendment Request - LAR 09-00562, for Use of Optimized Zirlo Fuel Rod Cladding RC-09-0012, License Amendment Request LAR 08-01332, for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR 262009-03-0202 March 2009 License Amendment Request LAR 08-01332, for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR 26 RC-09-0004, License Amendment Request - LAR 04-02911 License Amendment and Related Technical Specification Changes to Implement Full-scope Alternative Source Term in Accordance with 10 CFR 50.672009-02-17017 February 2009 License Amendment Request - LAR 04-02911 License Amendment and Related Technical Specification Changes to Implement Full-scope Alternative Source Term in Accordance with 10 CFR 50.67 ML0711003012006-05-10010 May 2006 Offsite Dose Calculation Manual ML0604002202006-02-0606 February 2006 Virgil C. Summer Nuclear Station License Amendment Request - LAR 05-0677 On-Line Monitoring of Instrument Channel Performance RC-05-0181, Elimination of Requirements to Provide the Monthly Operating Report and the Occupational Radiation Exposure Report Using the Consolidated Line Item Improvement Process2005-11-29029 November 2005 Elimination of Requirements to Provide the Monthly Operating Report and the Occupational Radiation Exposure Report Using the Consolidated Line Item Improvement Process RC-03-0194, License Amendment Request - LAR 03-1901 Surveillance Requirement 4.2.4.2 and Associated Bases2003-09-19019 September 2003 License Amendment Request - LAR 03-1901 Surveillance Requirement 4.2.4.2 and Associated Bases RC-03-0159, License Amendment Request - LAR 03-1864, Surveillance Requirement 4.0.5 & Associated Bases2003-07-29029 July 2003 License Amendment Request - LAR 03-1864, Surveillance Requirement 4.0.5 & Associated Bases RC-03-0007, License Amendment Request - LAR 02-2767 Steam Generators - One-Time Exclusion of Inspection Frequency2003-01-14014 January 2003 License Amendment Request - LAR 02-2767 Steam Generators - One-Time Exclusion of Inspection Frequency RC-03-0006, License Amendment Request - LAR 02-2820, Emergency Core Cooling Systems - Exclusion of Safety Injection Pumps from Requirement to Vent ECCS Pumps2003-01-14014 January 2003 License Amendment Request - LAR 02-2820, Emergency Core Cooling Systems - Exclusion of Safety Injection Pumps from Requirement to Vent ECCS Pumps ML0234004902002-12-0303 December 2002 Technical Specification Amendment Request - TSP 99-0090 Spent Fuel Pool Storage Expansion - Supplemental Letter Revision to Testing Plan for the Temporary Crane RC-02-0176, Letter Regards TS Amendment Request - TSP 00-0075 Emergency Feedwater System Isolation Valves Project Delay Letter2002-10-14014 October 2002 Letter Regards TS Amendment Request - TSP 00-0075 Emergency Feedwater System Isolation Valves Project Delay Letter RC-02-0147, Technical Specification Amendment Request TSP 01-0235, Revision to Emergency Diesel Generator Start Time Surveillance Requirement2002-09-24024 September 2002 Technical Specification Amendment Request TSP 01-0235, Revision to Emergency Diesel Generator Start Time Surveillance Requirement ML0224701902002-08-30030 August 2002 Virgil C Summer Unit 1, Technical Specification Pages for Amendment 160 Spent Fuel Pool Expansion RC-02-0089, Tech Spec Amendment Request - TSP 99-0090 Spent Fuel Pool Storage Expansion - Supplemental Letter - Response to RAI Dated April 1, 20022002-05-0707 May 2002 Tech Spec Amendment Request - TSP 99-0090 Spent Fuel Pool Storage Expansion - Supplemental Letter - Response to RAI Dated April 1, 2002 ML0210603772002-04-11011 April 2002 Technical Specification Pages to Amendment 159 ML0207803122002-03-12012 March 2002 Technical Specification Pages (Paper) ML0207203752002-03-0808 March 2002 Technical Specification Pages for Amendment 157 for Virgil C. Summer, Unit 1 ML0206506882002-03-0505 March 2002 Technical Specification Pages - Summer Unit 1, Amendment No. 156 RC-93-0310, (VCSNS) - Technical Specification Change - TSP 930011 Accident Monitoring Instrument1993-12-17017 December 1993 (VCSNS) - Technical Specification Change - TSP 930011 Accident Monitoring Instrument 2023-12-12 Category:Amendment MONTHYEARML22115A0602022-04-22022 April 2022
[Table view]Application for Technical Specification Change TSTF-491, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications Using Consolidated Line Item Improvement Process ML21102A1272021-04-0909 April 2021 (Vcsns), Unit 1 - Application for Technical Specification Change Regarding Risk Informed Justification for the Relocation of Specific Surveillance Frquency Requirements to Licensee-Controlled Program RC-17-0107, (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change2017-10-0606 October 2017 (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change ML14010A1822014-02-28028 February 2014 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-510 ML11332A0782011-11-15015 November 2011 License Amendment Request - LAR-06-00055 - License Amendment Request to Adopt NFPA 805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition). Part 2 of 2 RC-09-0068, License Amendment Request - LAR 09-00562, for Use of Optimized Zirlo Fuel Rod Cladding2009-06-0909 June 2009 License Amendment Request - LAR 09-00562, for Use of Optimized Zirlo Fuel Rod Cladding RC-09-0012, License Amendment Request LAR 08-01332, for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR 262009-03-0202 March 2009 License Amendment Request LAR 08-01332, for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR 26 RC-09-0004, License Amendment Request - LAR 04-02911 License Amendment and Related Technical Specification Changes to Implement Full-scope Alternative Source Term in Accordance with 10 CFR 50.672009-02-17017 February 2009 License Amendment Request - LAR 04-02911 License Amendment and Related Technical Specification Changes to Implement Full-scope Alternative Source Term in Accordance with 10 CFR 50.67 ML0711003012006-05-10010 May 2006 Offsite Dose Calculation Manual ML0604002202006-02-0606 February 2006 Virgil C. Summer Nuclear Station License Amendment Request - LAR 05-0677 On-Line Monitoring of Instrument Channel Performance RC-05-0181, Elimination of Requirements to Provide the Monthly Operating Report and the Occupational Radiation Exposure Report Using the Consolidated Line Item Improvement Process2005-11-29029 November 2005 Elimination of Requirements to Provide the Monthly Operating Report and the Occupational Radiation Exposure Report Using the Consolidated Line Item Improvement Process RC-03-0194, License Amendment Request - LAR 03-1901 Surveillance Requirement 4.2.4.2 and Associated Bases2003-09-19019 September 2003 License Amendment Request - LAR 03-1901 Surveillance Requirement 4.2.4.2 and Associated Bases RC-03-0159, License Amendment Request - LAR 03-1864, Surveillance Requirement 4.0.5 & Associated Bases2003-07-29029 July 2003 License Amendment Request - LAR 03-1864, Surveillance Requirement 4.0.5 & Associated Bases RC-03-0007, License Amendment Request - LAR 02-2767 Steam Generators - One-Time Exclusion of Inspection Frequency2003-01-14014 January 2003 License Amendment Request - LAR 02-2767 Steam Generators - One-Time Exclusion of Inspection Frequency RC-03-0006, License Amendment Request - LAR 02-2820, Emergency Core Cooling Systems - Exclusion of Safety Injection Pumps from Requirement to Vent ECCS Pumps2003-01-14014 January 2003 License Amendment Request - LAR 02-2820, Emergency Core Cooling Systems - Exclusion of Safety Injection Pumps from Requirement to Vent ECCS Pumps ML0234004902002-12-0303 December 2002 Technical Specification Amendment Request - TSP 99-0090 Spent Fuel Pool Storage Expansion - Supplemental Letter Revision to Testing Plan for the Temporary Crane RC-02-0176, Letter Regards TS Amendment Request - TSP 00-0075 Emergency Feedwater System Isolation Valves Project Delay Letter2002-10-14014 October 2002 Letter Regards TS Amendment Request - TSP 00-0075 Emergency Feedwater System Isolation Valves Project Delay Letter RC-02-0147, Technical Specification Amendment Request TSP 01-0235, Revision to Emergency Diesel Generator Start Time Surveillance Requirement2002-09-24024 September 2002 Technical Specification Amendment Request TSP 01-0235, Revision to Emergency Diesel Generator Start Time Surveillance Requirement ML0224701902002-08-30030 August 2002 Virgil C Summer Unit 1, Technical Specification Pages for Amendment 160 Spent Fuel Pool Expansion RC-02-0089, Tech Spec Amendment Request - TSP 99-0090 Spent Fuel Pool Storage Expansion - Supplemental Letter - Response to RAI Dated April 1, 20022002-05-0707 May 2002 Tech Spec Amendment Request - TSP 99-0090 Spent Fuel Pool Storage Expansion - Supplemental Letter - Response to RAI Dated April 1, 2002 ML0210603772002-04-11011 April 2002 Technical Specification Pages to Amendment 159 ML0207803122002-03-12012 March 2002 Technical Specification Pages (Paper) ML0207203752002-03-0808 March 2002 Technical Specification Pages for Amendment 157 for Virgil C. Summer, Unit 1 ML0206506882002-03-0505 March 2002 Technical Specification Pages - Summer Unit 1, Amendment No. 156 RC-93-0310, (VCSNS) - Technical Specification Change - TSP 930011 Accident Monitoring Instrument1993-12-17017 December 1993 (VCSNS) - Technical Specification Change - TSP 930011 Accident Monitoring Instrument 2022-04-22 |
Text
CO C
TABLE 3.3-2 m
REACTOR TRIP SYSTEM INSTRUMENTATION RESPONSE TIMES C
Z FUNCTIONAL UNIT RESPONSE TIME
- 1. Manual Reactor Trip Not Applicable 1
- 2. Power Range, Neutron Flux < 0.5 seconds( )
- 3. Power Range, Neutron Flux, Not Applicable High Positive Rate
- 4. Deleted
- 5. Intermediate Range, Neutron Flux Not Applicable Co
- 6. Source Range, Neutron Flux 1
< 0.5 seconds( ) I (b 7. Overtemperature AT < 8.5 seconds(1)(2)
- 8. Overpower AT <8.5 seconds(1)(2)
- 9. Pressurizer Pressure--Low < 2.0 seconds
- 10. Pressurizer Pressure--High < 2.0 seconds
- 11. Pressurizer Water Level--High Not Applicable 3>
(D 3
0 (1) Neutron detectors are exempt from response time testing. Response time of the neutron flux signal portion of the channel shall be measured from detector output or input of first electronic component in channel.
(2) The 8.5 second response time includes a 5.0 second delay for the RTDs mounted in thermowells.