Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22263A290 | 1 May 2022 | Alert and Notification System Evaluation Report ANS Evaluation - Redacted Pages 66-130 | Fuel cladding |
ML22034A395 | 16 February 2022 | Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion | |
ML22034A397 | 16 February 2022 | Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection Completion | |
ML22034A399 | 16 February 2022 | Enclosure 1 - IP 71130.03 Cy 2021 - IR 8 Baseline Inspection Completion | |
ML21239A068 | 2 September 2021 | August 27, 2021, Summary: Discussion Between NRC and Dominion Regarding the NAPS Subsequent License Renewal - an Inconsistency in Documentation Regarding RCP Code Case N-481 (EPID No. L-2020-SLR-0000) - List of Attendee | |
ML21221A032 | 27 August 2021 | Meeting Summary Regarding Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application | |
ML21221A141 | 10 August 2021 | Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Attendees | |
ML20246G700 | 24 August 2020 | Enclosure 3: North Anna Power Station Subsequent License Renewal Application (CD-ROM Titled: Naps_Slra) | |
ML19011A171 | 4 January 2019 | Enclosures 1 to 3 - EAL Scheme Revisions Enclosure Summary, Discussion of Change and Mps EAL Scheme Revisions-Supporting Documents | Boric Acid High winds Shutdown Margin Reactor Vessel Water Level Reserve Station Service Transformer Operating Basis Earthquake FLEX Earthquake Fuel cladding |
ML15253A405 | 11 March 2016 | Enclosure 1 Seven Screening Criteria | Ultimate heat sink Probabilistic Risk Assessment Fukushima Dai-Ichi Generic Issues Program Recently irradiated fuel Backfit |
ML15324A302 | 19 November 2015 | Implementation of TB 15-1 R1 and Unlikely Loss of Both RWSTs at NAPS | High winds FLEX Tornado Generated Missile |
ML15231A364 | 27 May 2015 | FOIA/PA-2014-0204 - Resp 1 - Final, Group a | |
ML15065A238 | 6 February 2015 | Acord Certificate of Liability Insurance | |
ML13329A546 | 27 November 2013 | Restart Action Plan (Public) | Operating Basis Earthquake Functionality Assessment Design basis earthquake Earthquake |
ML13302B891 | 2 October 2013 | Listing of North Anna, Units 1 and 2 TS Basis Changes | |
ML13318A106 | 11 March 2013 | Flooding Hazard Re-Evaluation Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.1: Flooding | Internal Flooding Hydrostatic Fukushima Dai-Ichi Earthquake |
ML13318A107 | 11 March 2013 | Near-Term Task Force 2.1: Flooding Hazard Re-Evaluation Initial Assessment of Flooding Hazard Re-Evaluation Results and Interim Actions Plan | FLEX |
ML12131A504 | 9 May 2012 | Sign in Sheets for the North Anna Annual Assessment Public Meeting | |
ML12056A052 | 12 March 2012 | Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status | |
ML11292A190 | 18 January 2012 | Supporting Document and Examples for Information Notice Sblc and RWST Issues | Unanalyzed Condition |
ML11305A039 | 1 November 2011 | Restart Public Meeting, Feedback Form | |
ML12054A081 | 16 September 2011 | Earthquake AIT Brief | Reserve Station Service Transformer Earthquake |
ML103050207 | 16 July 2010 | Initial Exam 2010-301 Final Simulator Scenarios | |
ML101930312 | 9 June 2010 | Onsite Ground/Surface Water Monitoring Questionnaire for North Anna | |
ML101260035 | 3 May 2010 | Public Mtg. Attendees | |
ML090920956 | 31 March 2009 | Closed Generic Communication TACs (PA No. 101122CA/B) Summary Report (as of 03/31/2009) | |
ML073240024 | 25 October 2007 | Examples of Max Thermal Power License Conditions | |
ML073040030 | 1 October 2007 | Sign-In Roster for Public Meeting with Dominion Nuclear | |
ML071160003 | 24 April 2007 | Annual Assessment Meeting Cy 2006, List of Attendees | |
ML063470599 | 14 December 2006 | Plant Service List | |
ML051300539 | 5 May 2005 | Attachment 1, Response to Requests for Additional Information on Nuclear Facility Quality Assurance Program Description | |
ML051300544 | 5 May 2005 | Attachment 2, Response to Requests for Additional Information Re Proposed Technical Specifications Changes Associated with Nuclear Facility Quality Assurance Program Description | |
ML051300556 | 5 May 2005 | Enclosure 4, Response to Requests for Additional Information Marked Up Discussion of Changes | Commercial Grade Dedication Coatings Nondestructive Examination Grace period |
ML051300559 | 5 May 2005 | Enclosure 5, Response to Requests for Additional Information Replacement Discussion of Changes | Commercial Grade Dedication Coatings Nondestructive Examination Grace period |
ML051150244 | 16 February 2005 | Proposal for Information Collection - North Anna Power Station Submittal for Agency Review and Comments on 316(b) Cooling Water Intake Structures | License Renewal |
ML042380310 | 10 August 2004 | Background on RCP Seal Cooling for North Anna | Hot Short Safe Shutdown |
ML052350733 | 6 August 2004 | mei-Primary | |
ML041070236 | 6 April 2004 | Attachment 1, List of Attendees for North Anna Annual Assessment Meeting of 04/06/04 | |
ML040410492 | 20 February 2004 | Order EA-03-009 Service List | |
ML050540469 | 10 February 2004 | Dynamic Web Page Printout Dated 02/10/2004, ROP PIM Report - All Sites - Event Dates: 01/01/2003 - 02/10/2004 | Safe Shutdown Fire Barrier Condition Adverse to Quality Significance Determination Process Fire Protection Program |
ML050540464 | 9 February 2004 | Dynamic Web Page Printout Dated 02/09/2004 Regarding Applied Violations for Nuclear Power Plants | |
ML050540264 | 22 October 2003 | Summary of EB1 Findings (07-09/03) | Safe Shutdown |
ML040350691 | 27 August 2003 | DRS Open Items Status | Safe Shutdown Boric Acid Fire Barrier Hemyc Pressure Boundary Leakage |
ML040350212 | 13 August 2003 | DRS Open Items Status | Safe Shutdown Boric Acid Fire Barrier Hemyc Pressure Boundary Leakage |
ML022400332 | 27 August 2002 | Outline for Phone Calls with Licensees for: Davis-Besse, H.B. Robinson, North Anna Unit 2 and Surry Unit 2 | |
ML021330486 | 29 April 2002 | Dominion'S SBO Supplemental Response, Final Draft Dated 04/29/2002 | |
ML020520693 | 4 March 2002 | Enclosure to North Anna, Unit 1 ASME ISI Program Relief Request Request NOE-Partial-2 | |
ML020100388 | 24 January 2002 | Enclosufigures Depicting the Locations of the Surry and North Anna Power Stations and Their Associated Transmission Lines |