MONTHYEARML24018A0702023-11-30030 November 2023 Form 2.1-1 Examination Preparation Checklist ML22263A2902022-05-0101 May 2022 Alert and Notification System Evaluation Report ANS Evaluation - Redacted Pages 66-130 ML22034A3952022-02-16016 February 2022 Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion ML22034A3972022-02-16016 February 2022 Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection Completion ML22034A3992022-02-16016 February 2022 Enclosure 1 - IP 71130.03 Cy 2021 - IR 8 Baseline Inspection Completion ML21342A1412021-12-0909 December 2021 Enclosure - List of Attendees for the Public Meeting in Tarrytown, Ny, Re Indian Point Units 1, 2, and 3 PSDAR ML21288A4302021-10-18018 October 2021 Enclosure - Crystal River Unit 3 Nuclear Generating Plant - Correction to Safety Evaluation Related to the Issuance of Amendment No. 259 Approving the Independent Spent Fuel Storage Installation Only Emergency Plan ML21239A0682021-09-0202 September 2021 August 27, 2021, Summary: Discussion Between NRC and Dominion Regarding the NAPS Subsequent License Renewal - an Inconsistency in Documentation Regarding RCP Code Case N-481 (EPID No. L-2020-SLR-0000) - List of Attendee ML21221A0322021-08-27027 August 2021 Meeting Summary Regarding Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application ML21221A1412021-08-10010 August 2021 Meeting Summary: Discussion of Dominion'S Response to Select Staff Requests for Additional Information on Subsequent License Renewal Application (EPID No. L-2020-SLR-0000) - Attendees ML20246G7002020-08-24024 August 2020 Enclosure 3: North Anna Power Station Subsequent License Renewal Application (CD-ROM Titled: Naps_Slra) ML21130A0532019-09-30030 September 2019 Appendix C: Criticality Analysis Checklist ML19105B0552019-04-15015 April 2019 Superseded Pages Per Revision No. 01 to Environmental Sampling Program ML19095A6002019-04-0202 April 2019 Enclosure 1 - Topics That Require a SLRA Supplement ML19011A1712019-01-0404 January 2019 Enclosures 1 to 3 - EAL Scheme Revisions Enclosure Summary, Discussion of Change and Mps EAL Scheme Revisions-Supporting Documents ML17076A4322017-03-23023 March 2017 TSTF-542 Deviations Descriptions for Hatch Nuclear Plant ML17038A2702016-12-14014 December 2016 Non-Proprietary Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Circulating and Service Water Class 3 Buried Piping in Accordance with 10 CFR 50.55a(z)(1) ML16285A3282016-10-12012 October 2016 ROP PI Frequently Asked Questions (Faqs): 14-05 ML16277A1882016-10-0303 October 2016 2016301 Final SRO Written Examination ML15253A4052016-03-11011 March 2016 Enclosure 1 Seven Screening Criteria ML15324A3022015-11-19019 November 2015 Implementation of TB 15-1 R1 and Unlikely Loss of Both RWSTs at NAPS ML15236A1202015-08-25025 August 2015 Order EA-13-109 (HCVS) Phase 1 and 2 OIP Rev 0H3A - August 25, 2015 ML15233A0742015-08-10010 August 2015 SPRA Relief - Information to Support Reconsideration of Hatch U1 for Inclusion in SPRA Relief Due to Seismic Robustness and Similarities to Hatch U2 ML15231A3642015-05-27027 May 2015 FOIA/PA-2014-0204 - Resp 1 - Final, Group a ML15097A1172015-04-0707 April 2015 Soarca Surry 2004 Meteorological File ML15065A2382015-02-0606 February 2015 Acord Certificate of Liability Insurance ML14314A5122014-11-13013 November 2014 Enclosure 2 - Frequently Asked Questions (Faqs) Discussed During the October 22 2014 Reactor Oversight Process Public Meeting ML14162A5772014-06-25025 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushim Dai-ichi Nuclear Power Plant Accident ML13329A5462013-11-27027 November 2013 Restart Action Plan (Public) ML13302B8912013-10-0202 October 2013 Listing of North Anna, Units 1 and 2 TS Basis Changes ML13143A3312013-06-0606 June 2013 Operating Boiling-Water Reactor Licensees with Mark 1 and Mark 2 Containments Addresses List - Enclosure 2 ML13318A1062013-03-11011 March 2013 Flooding Hazard Re-Evaluation Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.1: Flooding ML13318A1072013-03-11011 March 2013 Near-Term Task Force 2.1: Flooding Hazard Re-Evaluation Initial Assessment of Flooding Hazard Re-Evaluation Results and Interim Actions Plan ML12131A5042012-05-0909 May 2012 Sign in Sheets for the North Anna Annual Assessment Public Meeting ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML11292A1902012-01-18018 January 2012 Supporting Document and Examples for Information Notice Sblc and RWST Issues ML11305A0392011-11-0101 November 2011 Restart Public Meeting, Feedback Form ML11313A1472011-09-30030 September 2011 CR New Summary - Southern Company ML11308A6682011-09-28028 September 2011 Georgia Power Company - Reactor Plant Event Notification Worksheet ML12054A0812011-09-16016 September 2011 Earthquake AIT Brief RA-11-025, Enclosure 1, Attachment 2 - Duke Energy Corporation and Progress Energy, Inc. Organization Charts Post Merger2011-09-0202 September 2011 Enclosure 1, Attachment 2 - Duke Energy Corporation and Progress Energy, Inc. Organization Charts Post Merger ML1116400572011-06-0707 June 2011 Public Meeting - Crystal River Nuclear Plant - Attendees 3F0311-07, Attachment B, Response to Request for Additional Information Required for the Development of the Confirmatory LOCA and Non-LOCA Models2011-03-15015 March 2011 Attachment B, Response to Request for Additional Information Required for the Development of the Confirmatory LOCA and Non-LOCA Models ML1027201382010-10-29029 October 2010 Williams Q&A - Request #3 Info-Pugh-PART 6 ML1027201152010-10-29029 October 2010 Williams Q&A- Request #3 Info-Pugh-PART 5 ML1029205062010-09-20020 September 2010 Adverse Condition Investigation Form, CAP-NGGC-0200-3-18 ML1029200682010-09-20020 September 2010 Ncr Number 358724, Assignment Number 23, Crystal River, Unit 3 Containment ML1029200642010-09-20020 September 2010 Petrographic Studies of Concrete for Construction Engineering Consultants ML1023504542010-08-18018 August 2010 P11 Company Background ML1020303412010-07-28028 July 2010 Nuclear Generating Plant - Preliminary Review of Progress Energy'S 10 CFR 50.59 Evaluation 2023-11-30
[Table view] |
Text
Summary of EBI Findings (7-9/03)
North Anna: Green NCV issued for a main control room exhaust duct with an indeterminate fire rating.
Hatch: Green NCV for the licensee's use of manual actions instead of providing the required physical separation for fire protection. The licensee's denial of this NCV is currently under review.
Hatch: Green NCV for several examples of inadequate lighting associated with post-fire safe shutdown equipment.
Hatch: Green NCV for a manual action following a fire which the inspectors concluded was too difficult and physically unsafe. The licensee's denial of this NCV is currently under review.
Crystal River: Green NCV for failure to protect certain electrical cables associated with safe shutdown equipment from fire damage in three fire areas. (This was a closeout of a CY02 inspection open item.)
Surry: Green NCV for an inadequate EDG output breaker control circuit design. (This was a closeout of a CY 03 open item.)