|
---|
Category:Letter type:RS
MONTHYEARRS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-090, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2023-09-0707 September 2023 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-081, Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2023-08-21021 August 2023 Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation RS-23-085, Supplemental Information Related to Request for Partial Site Release2023-08-0303 August 2023 Supplemental Information Related to Request for Partial Site Release RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-073, Request for Partial Site Release2023-06-0707 June 2023 Request for Partial Site Release RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-039, Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air2023-03-0101 March 2023 Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-23-002, Application to Adopt TSTF-332, ECCS Response Time Testing2023-01-13013 January 2023 Application to Adopt TSTF-332, ECCS Response Time Testing RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-121, Notice of Intent to Pursue Subsequent License Renewal Applications2022-11-0909 November 2022 Notice of Intent to Pursue Subsequent License Renewal Applications RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-107, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2022-09-29029 September 2022 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-089, Additional Information Supporting Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock2022-07-25025 July 2022 Additional Information Supporting Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock RS-22-060, Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2022-05-24024 May 2022 Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling RS-22-061, Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves2022-05-24024 May 2022 Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves RS-22-068, Constellation Radiological Emergency Plan Addendum Revision2022-05-19019 May 2022 Constellation Radiological Emergency Plan Addendum Revision RS-22-062, Supplemental Information to Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System2022-04-26026 April 2022 Supplemental Information to Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System RS-22-055, Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan2022-04-18018 April 2022 Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-020, Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock2022-04-0707 April 2022 Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-044, Unit 1 - Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System2022-03-31031 March 2022 Unit 1 - Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations RS-22-042, Report on Status of Decommissioning Funding for Shutdown Reactors2022-03-23023 March 2022 Report on Status of Decommissioning Funding for Shutdown Reactors RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P RS-22-019, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-02-16016 February 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC2022-02-0101 February 2022 Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-121, Proposed Changes to Decommissioning Trust Agreements and Master Terms2021-12-15015 December 2021 Proposed Changes to Decommissioning Trust Agreements and Master Terms RS-21-102, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors2021-09-29029 September 2021 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-21-091, Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes2021-09-13013 September 2021 Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes RS-21-087, Additional Information Supporting Request for License Amendment to Revise Degraded Voltage Relay Allowable Values2021-08-31031 August 2021 Additional Information Supporting Request for License Amendment to Revise Degraded Voltage Relay Allowable Values RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel RS-21-076, Application to Adopt TSTF-273, Safety Function Determination Program Clarifications2021-07-30030 July 2021 Application to Adopt TSTF-273, Safety Function Determination Program Clarifications RS-21-063, Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2021-06-30030 June 2021 Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-070, Proposed Alternative to Utilize Code Case N-8932021-06-30030 June 2021 Proposed Alternative to Utilize Code Case N-893 RS-21-069, Third Inservice Inspection Interval Relief Request I3R-182021-06-28028 June 2021 Third Inservice Inspection Interval Relief Request I3R-18 RS-21-054, Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations2021-04-29029 April 2021 Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments RS-21-037, Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Revision 22021-03-23023 March 2021 Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Revision 2 RS-21-028, Fitness for Duty Performance Data Reports - Annual 20202021-02-26026 February 2021 Fitness for Duty Performance Data Reports - Annual 2020 RS-21-032, Amended Decommissioning Trust Agreements2021-02-25025 February 2021 Amended Decommissioning Trust Agreements RS-21-030, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2021-02-24024 February 2021 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations 2023-09-07
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARRS-23-081, Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2023-08-21021 August 2023 Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23090A2162023-03-30030 March 2023 Supplement to License Amendment Request - Proposed Changes to TMI-2 Possession Only License and Technical Specifications RS-23-039, Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air2023-03-0101 March 2023 Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air ML23058A0642023-02-22022 February 2023 License Amendment Request - Three Mile Island, Unit 2, Historic and Cultural Resources Review RS-23-002, Application to Adopt TSTF-332, ECCS Response Time Testing2023-01-13013 January 2023 Application to Adopt TSTF-332, ECCS Response Time Testing ML22313A0502022-11-0707 November 2022 License Amendment Request - Three Mile Island, Unit 2, Decommissioning Technical Specifications, Response to Request for Information Regarding Radiation Protection Program Ventilation Controls RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-060, Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2022-05-24024 May 2022 Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling RS-22-061, Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves2022-05-24024 May 2022 Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves ML22138A2852022-05-16016 May 2022 (TMl-2) - License Amendment Request - Three Mile Island, Unit 2, Decommissioning Technical Specifications, Response to Questions RS-22-020, Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock2022-04-0707 April 2022 Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock ML22013A1772022-01-0707 January 2022 License Amendment Request - Three Mile Island, Unit 2, Decommissioning Technical Specifications, Supplemental Information ML22010A0682022-01-0505 January 2022 Supplemental Information to License Amendment Request, Revision to TMl2-EN-RPT-0002 MCNP Version 6.2 Bias Determination for Low Enrichment Uranium Using the ENDF/B-VIII.0 Cross Section Library ML22010A0672022-01-0505 January 2022 Supplemental Information to License Amendment Request, Revision to TMl2-EN-RPT-0001 Determination of the Safe Fuel Mass Limit for Decommissioning TMl-2 RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21277A1932021-11-16016 November 2021 Enclosure 2, Draft Conforming License Amendments JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21188A0202021-08-11011 August 2021 Issuance of Amendment No. 239 One-Time Extension of Containment Type a Integrated Leakage Rate Test Frequency RS-21-076, Application to Adopt TSTF-273, Safety Function Determination Program Clarifications2021-07-30030 July 2021 Application to Adopt TSTF-273, Safety Function Determination Program Clarifications TMI-21-018, License Amendment Request - Revised Three Mile Island Nuclear Station License in Support of Independent Spent Fuel Storage Installation (ISFSI) Only Security Plan2021-04-29029 April 2021 License Amendment Request - Revised Three Mile Island Nuclear Station License in Support of Independent Spent Fuel Storage Installation (ISFSI) Only Security Plan RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments ML21075A3372021-03-16016 March 2021 License Amendment Request to Revise Oyster Creek Nuclear Generating Station Permanently Defueled Technical Specificat Ions to Reflect Perm Anent Removal of Spent Fuel from Spent Fuel Pool TMI-21-009, License Amendment Request - Proposed Changes to the Three Mile Island Emergency Plan for Independent Spent Fuel Storage Installation Only Emergency Plan and Emergency Action Level Scheme2021-03-0404 March 2021 License Amendment Request - Proposed Changes to the Three Mile Island Emergency Plan for Independent Spent Fuel Storage Installation Only Emergency Plan and Emergency Action Level Scheme ML21057A2732021-02-25025 February 2021 Application for Order Approving License Transfers and Proposed Conforming License Amendments RS-21-014, License Amendment Request for One-Time Extension of the Containment Type a Integrated Leakage Rate Test Frequency2021-02-24024 February 2021 License Amendment Request for One-Time Extension of the Containment Type a Integrated Leakage Rate Test Frequency ML21054A3212021-02-23023 February 2021 License Amendment Request to Approve Independent Spent Fuel Storage Installation Only Emergency Plan ML21057A0462021-02-19019 February 2021 License Amendment Request Decommissioning Technical Specifications ML20351A4512020-12-16016 December 2020 License Amendment Request, Proposed Revision to License Conditions and Permanently Defueled Technical Specifications for Permanent Removal of Irradiated Fuel from the Spent Fuel Pool (ISFSI-Only Tech Specs) RS-20-115, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-11-18018 November 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20311A6572020-11-0404 November 2020 Supplemental Information Regarding License Amendment Request - Proposed Changes to the Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition RS-20-053, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2020-04-30030 April 2020 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors TMI-20-012, Island Nuclear Station, Unit 1 - Submittal of Changes to Technical Specifications Bases2020-04-13013 April 2020 Island Nuclear Station, Unit 1 - Submittal of Changes to Technical Specifications Bases TMI-19-112, Application for Order Approving License Transfer and Conforming License Amendments2019-11-12012 November 2019 Application for Order Approving License Transfer and Conforming License Amendments ML19316C6592019-11-12012 November 2019 License Amendment Request - Deletion of Pots 3/4.1.4, Handling of Irradiated Fuel with the Fuel Handling Building Crane; and Two Minor Administrative Changes RS-19-044, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions2019-08-28028 August 2019 License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions RS-19-069, License Amendment Request Supporting Emergency Plan Emergency Action Level Change (EAL RAL3)2019-08-23023 August 2019 License Amendment Request Supporting Emergency Plan Emergency Action Level Change (EAL RAL3) JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-06-25025 June 2019 Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program RS-19-054, Application to Revise Technical Specifications Following Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control2019-06-18018 June 2019 Application to Revise Technical Specifications Following Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control ML19036A5862019-03-21021 March 2019 Issuance of Amendments to Revise the Emergency Response Organization Staffing Requirements RS-19-003, Application to Adopt TSTF-564, Safety Limit Mcpr.2019-02-0101 February 2019 Application to Adopt TSTF-564, Safety Limit Mcpr. RA-18-080, License Amendment Request: License Condition Revision for Removal of Cyber Security Plan Requirements2018-11-12012 November 2018 License Amendment Request: License Condition Revision for Removal of Cyber Security Plan Requirements RA-18-098, License Amendment Request Supplement - Proposed Change of Effective and Implementation Dates of License Amendment No. 294, Oyster Creek Emergency Plan for Permanently Defueled Emergency Plan and Emergency Action Level Scheme2018-11-0606 November 2018 License Amendment Request Supplement - Proposed Change of Effective and Implementation Dates of License Amendment No. 294, Oyster Creek Emergency Plan for Permanently Defueled Emergency Plan and Emergency Action Level Scheme RS-18-130, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2018-11-0101 November 2018 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO TMI-18-100, Supplement 2 to License Amendment Request - Proposed Changes to Technical Specifications Sections 1.0, Definitions, and 6.0, Administrative Controls for Permanently Defueled Condition2018-10-29029 October 2018 Supplement 2 to License Amendment Request - Proposed Changes to Technical Specifications Sections 1.0, Definitions, and 6.0, Administrative Controls for Permanently Defueled Condition RA-18-092, License Amendment Request - Proposed Change of Effective and Implementation Dates of License Amendment No. 294, Oyster Creek Emergency Plan for Permanently Defueled Emergency Plan and Emergency Action Level Scheme2018-10-22022 October 2018 License Amendment Request - Proposed Change of Effective and Implementation Dates of License Amendment No. 294, Oyster Creek Emergency Plan for Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML18283A1382018-10-10010 October 2018 Supplement to License Amendment Request - Proposed Changes to Technical Specifications Sections 1.0, Definitions, and 6.0, Administrative Controls for Permanently Defueled Condition RS-18-116, Application to Revise Technical Specifications to Adopt TSTF-476, Improved BPWS Control Rod Insertion Process (NEDO-33091), Revision 12018-09-28028 September 2018 Application to Revise Technical Specifications to Adopt TSTF-476, Improved BPWS Control Rod Insertion Process (NEDO-33091), Revision 1 RS-18-105, License Amendment Request to Recapture Low-Power Testing Time2018-09-17017 September 2018 License Amendment Request to Recapture Low-Power Testing Time 2023-08-21
[Table view] |
Text
RS-05-024 10 CFR 50 .80 March 3, 2005 U .S. Nuclear Regulatory Commission Attn : Document Control Desk Washington, DC 20555-0001 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No . 50-461 Oyster Creek Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No . 50-289
Subject:
Application for Approval of Indirect License Transfers In accordance with 10 CFR 50.80, "Transfer of licenses," AmerGen Energy Company, LLC (AmerGen) is requesting NRC consent, to the extent necessary, of indirect transfers of Facility Operating License Nos . NFP-62, DPR-16, and DPR-50 for Clinton Power Station, Unit 1 (Clinton), Oyster Creek Generating Station (Oyster Creek) and Three Mile Island Nuclear Station, Unit 1 (TMI-1 I respectively . There are no license amendments needed in connection with the proposed indirect license transfers .
The proposed indirect license transfers are associated with the pending merger of Exelon Corporation (the ultimate parent company of AmerGen and referred to as Exelon) and Public Service Enterprise Group (PSEG) and the subsequent restructuring of the merged companies.
Under the merger agreement, the two companies will combine to create Exelon Electric & Gas Corporation (EEG), the nation's largest utility. The merger will be accomplished by converting PSEG shares into Exelon shares and is expected to result in PSEG shareholders holding about 32% of EEG . PSEG will merge into Exelon and upon completion of the merger, Exelon will change its name to Exelon Electric & Gas Corporation . EEG will then restructure its organization . The combined company will have assets of approximately $79 billion and will serve three major metropolitan areas, more than seven million retail electric customers in Illinois, New Jersey, and Pennsylvania, and more than two million gas customers in Pennsylvania and New Jersey .
AmerGen is the licensed owner and operator of Clinton, Oyster Creek and TMI-1 . AmerGen is a wholly-owned subsidiary of Exelon Generation Company, LLC (Exelon Generation). Exelon Generation is a wholly-owned subsidiary of Exelon Ventures Company, LLC (Exelon Ventures),
which in turn is a wholly-owned subsidiary of Exelon . As a result of the merger, AmerGen will
U .S. Nuclear Regulatory Commission March 3, 2005 Page 2 remain a wholly-owned subsidiary of Exelon Generation ; Exelon Generation will remain a wholly-owned subsidiary of Exelon Ventures ; Exelon Ventures will become a wholly-owned subsidiary of EEG . AmerGen will continue to be the owner of the stations and the NRC operating licensee . AmerGen is requesting the approval of indirect license transfers for these stations, to the extent necessary, solely due to the merger creating EEG .
The attached application contains the information required by 10 CFR 50.80 to demonstrate that :
(1) AmerGen will continue to possess the technical and financial qualifications to own and operate these facilities ;
(2) AmerGen will not, as a result of the merger, become owned, controlled, or dominated by a foreign corporation or government ;
(3) The proposed transfers do not raise any other significant safety or NRC regulatory issues .
The merger is conditioned upon, among other things, the approval by shareholders of both companies and a number of regulatory approvals or reviews by federal and state energy authorities. These include, in addition to the NRC, the New Jersey Board of Public Utilities, the Pennsylvania Public Utility Commission, the Illinois Commerce Commission (notice filing only),
the Federal Energy Regulatory Commission, the Securities and Exchange Commission, and either the Department of Justice or the Federal Trade Commission, depending upon which agency reviews the anti-trust aspects of the merger . The companies intend to request shareholder approval in the second quarter of 2005 and anticipate that the regulatory approvals can be obtained within 12 tol 5 months of its December 2004 announcement date.
To facilitate implementation of the merger and subsequent restructuring, AmerGen is requesting NRC approval of the proposed indirect transfers within six months, to be effective immediately upon issuance . Consistent with past practice, we request the approval to permit subsequent execution of the merger and restructuring within a succeeding 12-month period .
If there are any questions regarding these license transfer requests, please contact Kenneth A.
Ainger at (856) 339-2136 .
I declare under penalty of perjury that the foregoing is true and correct .
Executed on enjami"ce President censrng and Regulatory Affairs AmerGen Energy Company, LLC Attachment : Application for Consent to Indirect License Transfers
APPLICATION FOR CONSENT TO INDIRECT LICENSE TRANSFERS INTRODUCTION Exelon Corporation (Exelon) is the parent company of AmerGen Energy Company, LLC (AmerGen). AmerGen is currently the licensed owner and operator of Clinton Power Station, Unit 1 (Clinton), Oyster Creek Nuclear Generating Station (Oyster Creek), and Three Mile Island Nuclear Station, Unit 1 (TMI-1).
In December 2004, Exelon and Public Service Enterprise Group of New Jersey (PSEG) announced that they entered into a merger agreement to combine their companies and create Exelon Electric & Gas Corporation (EEG), the nation's largest utility. The merger will be accomplished by converting PSEG shares into Exelon shams and 4 expected to result in PSEG shareholders holding about 32% of EEG . PSEG will merge into Exelon and upon completion of the merger, Exelon will change its name to Exelon Electric & Gas Corporation. EEG will then restructure its organization . The merger will create a combined company with total assets of approximately $79 billion serving three major metropolitan areas, more than seven million retail electric customers in Illinois, New Jersey and Pennsylvania, and more than two million gas customers in Pennsylvania and New Jersey .
As a result of the merger, AmerGen is requesting, to the extent necessary, NRC approval of indirect license transfers in accordance with 10 CFR 50.80, "Transfer of licenses," for Clinton, Oyster Creek, and TMI-1 . This application provides the necessary information to support the proposed transfers, and to demonstrate that the transfers are justified and will not lead to any undue risk to public health and safety .
II . GENERAL INFORMATION The merger of Exelon and PSEG will further the business objectives of the two companies, creating substantial synergies in both financial and operational terms. The combined company
- Exelon Electric & Gas Corporation - will encompass a wealth of executive experience in a new and larger organization, with increased service territory. The combined company, through its subsidiaries Exelon Generation Company, LLC (Exelon Generation) and AmerGen, will continue to be a leader in the nuclear generation business .
When the merger is effective, John Rowe - the current Chairman, President and Chief Executive Officer of Exelon - will become the President and Chief Executive Officer of EEG .
James Ferland - the current Chairman, President and Chief Executive Officer of PSEG - will become non-executive chairman of the Board of [Directors of EEG . The new Board of Directors will be comprised of directors to be nominated at a ratio of two-thirds by Exelon and one-third by PSEG .
The merger will be accomplished by a series of transactions . As relevant to this application, the current PSEG Power LLC (PSEG Power) - the parent of PSEG Nuclear, LLC (PSEG Nuclear)'
- will merge into and be survived by Exelon Generation . The PSEG Power subsidiaries -_
luding PSEG Nuclear -will be dissolved, liquidated, or merged into and survived by Exelon Generation. The PSEG Power business functions will be rolled into their corresponding Exelon Generation business units. (if ultimately deemed more prudent, a direct or indirect PSEG Power subsidiary may be maintained and will be a direct subsidiary of Exelon Generation .)
AmerGen will continue to be the owner and operator of the referenced nuclear stations .
AmerGen will remain a wholly-owned subsidiary of Exelon Generation . Exelon Generation is currently a wholly-owned subsidiary of Exelon Ventures Company, LLC, (Exelon Ventures) which in turn is a wholly-owned subsidiary of the present Exelon . As a result of the merger and restructuring, Exelon Generation will remain a wholly-owned subsidiary of Exelon Ventures.
Exelon Ventures will become a wholly-owned subsidiary of EEG . AmerGen is requesting the approval of indirect license transfers for the referenced stations, to the extent necessary, solely due to the merger creating EEG.
An organization chart for the post-merger company is contained in Enclosure 1 of this application.
Ill . REGULATORY ISSUES FOR LICENSE TRANSFERS A. Identification and Ownership of the Licensee AmerGen will continue to be the NRC licensee for all of the stations addressed in this application . As a result of the transaction, AmerGen will become a wholly-owned subsidiary of EEG, which will be headquartered in Chicago, Illinois . The combined holding company will be a public company with shares traded on the New York Stock Exchange. The shares are expected to be widely held - initially by the current shareholders of Exelon and PSEG .
AmerGen will continue to maintain its headquarters at:
200 Exelon Way Kennett Square, Pennsylvania 19348 The AmerGen nuclear organization will continue to be integrated with the Exelon Generation nuclear organization, which will be headquartered at the same address .
The Chief Executive Officer, who is the Chief Nuclear Officer, and other senior executives of AmerGen responsible for the facilities addressed in this application will not change as a result of the merger.
As a result of the merger AmerGen will not become owned, controlled or dominated by foreign interests . AmerGen will remain a U .S. limited liability company that will be a wholly-owned subsidiary of Exelon Generation, a U.S. limited liability company . Exelon Generation will remain PSEG Nuclear is a licensee for the Salem Generating Station, Hope Creek Generating Station, and Peach Bottom Atomic Power Station . Those facilities are the subjects of separate license transfer applications .
a wholly-owned subsidiary of Exelon Ventures, a U .S. limited liability company. Exelon Ventures will be a subsidiary of EEG, a U.S . corporation .
The management committee of AmerGen will not change as a result of the license transfers.
officers of The majority (if not all) the directors and EEG All be U.S . citizens . The directors and officers of Exelon Ventures will not change as a result of the merger and will continue to be U.S .
citizens . The directors and officers of Exelon Generation will continue to be U .S. citizens .
B. Technical Qualifications of AmerGen The technical qualifications of AmerGen will not be affected by the merger creating EEG. The AmerGen organizations and personnel presently responsible for all of the referenced nuclear stations will continue to operate and support the stations with no change. Likewise, AmerGen's programs, procedures, and conduct of operations will not be altered for these facilities as a result of the merger.
C. Financial Qualifications of AmerGen
- 1. Operating Financial Qualifications The proposed merger and proposed transfers will not affect the financial qualifications of AmerGen as the licensed owner and operator.
AmerGen will continue to own, operate, and market power from the referenced stations .
AmerGen will continue to sell electricity to electric utility affiliates and will market electricity pursuant to rate tariffs approved by the Federal Energy Regulatory Commission . AmerGen presently meets, and will continue to meet, the financial qualifications requirement of 10 CFR 50 .33, "Contents of applications ; general information," paragraph (f)(2), by obtaining revenue from the sale of electricity from the nuclear plants sufficient to cover nuclear operating costs .
The proposed transfer does not affect the existing contingency funding arrangement for AmerGen provided by Exelon Generation . Exelon Generation's substantial generating assets, encompassing a diverse portfolio of nuclear, fossil, and hydroelectric generating units, will continue to provide revenue streams and added assurance of AmerGen's ability to cover fixed operating costs associated with a six-month shutdown of one or more of the nuclear units .
Furthermore, based upon the financial stature of the company, Exelon Generation expects to have an investment grade bond rating, which will enable the company to raise additional funds as necessary.
The financial projections for AmerGen standing alone do not change as a result of the proposed license transfers . In the license transfer application submitted by Exelon Generation and PSEG Nuclear addressing the direct transfer of the licenses for ownership/operation of the Salem and Hope Creek units (Docket Nos. 50-272, 50-311, and 50-354), Exelon Generation and PSEG Nuclear have submitted five-year post-merger financial projections for Exelon Generation, incorporating the combined generation capacity (nuclear and non-nuclear) to be operated by Exelon Generation, including AmerGen. The five year projections cover the first five years after the merger (beginning in 2006) and include: total revenue, total operating expenses, income before taxes, taxes, and net income. The financial information includes assumptions regarding the total generation supply and the price of electricity, as well as a projected balance sheet for Exelon Generation demonstrating the substantial assets of the combined generation business .
To the extent even required for the present application, that information is incorporated herein by reference .2
- 2. Decommissioning Funding Assurance The proposed indirect license transfers do not affect the present decommissioning funding assurance provided by AmerGen . The sources of decommissioning funding and the status of the decommissioning funds for the stations are unchanged as a result of the merger at the holding company level.
Financial assurance for decommissioning for all three stations continues to be provided by the prepayment method, coupled with an external trust fund, in accordance with 10 CFR 50.75, "Reporting and recordkeeping for decommissioning planning," paragraph (e)(1)(i) . The status of decommissioning funding for the three stations was shown in the most recent AmerGen decommissioning funding report 3 and will be updated in a status report, as required by 10 CFR 501511 to be submitted by March 31, 2005 .
- 3. Nuclear Insurance AmerGen will continue to maintain the financial protection required by 10 CFR 140, "Financial Protection Requirements and Indemnity Agreements," and the property insurance required by of 10 CFR 50.54, "Conditions licenses : paragraph (w), for all the referenced stations. These arrangements are not impacted by the proposed license transfers.
D. Restricted Data and Classified Nuclear Security Information This application does not contain any Restricted Data or other classified defense information, and it is not expected that any such information will become involved in the operation of the affected plants . As provided in 10 CFR 50.37, "Agreement limiting access to Classified
'Information," AmerGen will not permit any individual to have access to Restricted Data or National Security Information until the individual has been approved for such access under the provisions of 10 CFR 25, "Access Authorization for Licensee Personnel ."
E. Environmental Considerations This application does no more than request approvals of indirect license transfers. The proposed license transfers do not involve any amendment to the plant licenses or any other change that would directly affect the actual operation of the facilities involved in any substantive way. The proposed transfers do not involve an increase in the amounts, or a change in the types, of any radiological effluents that may be allowed to be released off-site, and do not involve any increase in the amounts or change in the types of any non-radiological effluents that may be released off-site . Further, no increase in the individual or cumulative occupational radiation exposure is involved .
The five year financial projections are proprietary. Exelon Generation and PSEG Nuclear have requested that the proprietary information be withheld from public disclosure pursuant to 10 CFR version was also provided to the NRC on the docket .
2.390 . A non-proprietary AmerGen letter to NRC, "Report on Status of Decommissioning Funding for Reactors," dated March 31, 2003 .
IV. OTHER REGULATORY APPROVALS AND SCHEDULE The merger of Exelon Corporation and Public Service Enterprise Group is conditioned upon, among other things, the approval by shareholders of both companies and a number of regulatory approvals or reviews by federal and state energy authorities. These include, in addition to the NRC, the New Jersey Board of Public Utilities, the Pennsylvania Public Utility Commission, the Illinois Commerce Commission (notice filing only), the Federal Energy Regulatory Commission the Securities and Exchange Commission, and either the Department of Justice or the Federal Trade Commission, depending upon which agency reviews the anti-trust aspects of the merger. The companies intend to seek shareholder approval in the second quarter of 2005 and anticipate that the regulatory approvals can be obtained within 12 to15 months of its December 2004 announcement date .
To facilitate implementation of the merger, AmerGen is requesting NRC approval of the effective proposed transfers within six months, to be immediately upon issuance and permit subsequent execution of the merger and restructuring within a succeeding 12-month period .
AmerGen will inform the NRC of any significant changes in the schedule.
V. CONCLUSIONS For the reasons discussed above, the proposed indirect license transfers will not: (1) have any adverse-impact on the operation of the referenced nuclear stations; (2) adversely affect the managerial or technical qualifications of AmerGen, the operator of the nuclear stations ; (3) impair AmerGen's financial qualifications as the owner and operator of the nuclear stations; or (4) result in any foreign ownership, control or domination of AmerGen. Accordingly, the proposed transfers will not result in any undue risk to public health and safety, will not be inimical to the common defense and security, and will be consistent with the Atomic Energy Act and NRC regulations.
Enclosure 1 Proposed Corporate Structure of Exelon Electric and Gas and Principal Subsidiaries
Exelon Electric & Gas - Post Merger*
Commonwealth PSE&G PECO Energy Exelon Enterprises Exelon*** Edison Company Company Generation Comoanv. LLC
- Entity names may change at the time of restructuring, but such name changes will not alter the structure as depicted above.
- Other direct subsidiaries of Exelon and PSEG are not shown as we anticipate the merger will not affect their relative placement in the corporate structure.
- Entity that owns the nuclear generating assets of Exelon and will own the nuclear generating assets of PSEG Nuclear .