Units 1 & 2, McGuire, Units 1 & 2, Oconee, Units 1, 2 & 3, H. B. Robinson, Unit 2 - Transmittal of Emergency Plan Implementing Procedure AD-EP-ALL-1000, Revision 2
ML17166A136
Person / Time
Site: Oconee, Mcguire, Catawba, Brunswick, Robinson, McGuire  Duke Energy icon.png
Issue date: 06/15/2017
From: Nolan M C
Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML17174A925 List:
References
RA-17-0031
Download: ML17166A136 (4)


Text

ENERGY GD Serial: RA-17-0031 June 15, 2017 U.S. Nuclear Regulatory Attn: Document Control Desk Washington, DC 20555-0001 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 M. Ch n stopher Nolan 526 South Church Street 28202 Mailing Address: Mai/Code EC2ZFIP.O. Box 1006 Charlotte , NC 28201-1006 . 704.382.7426 10 CFR 50.4(b)(5)(ii) 10 CFR 50.54(q)(5)

DOCKET NOS. 50-325 AND 50-324 / RENEWED LICENSE NOS. DPR-71 AND DPR-62 CATAWBA NUCLEAR STATION, UNITS 1AND2 DOCKET NOS. 50-413 AND 50-414 /RENEWED LICENSE NOS. NPF-35 AND NPF-52 MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 DOCKET NOS. 50-369 AND 50-370 I RENEWED LICENSE NOS. NPF-9 AND NPF-17 OCONEE NUCLEAR STATION, UNITS 1, 2 AND 3 DOCKET NOS. 50-269, 50-270, 50-287 RENEWED LICENSE NOS. DPR-38, DPR-47 AND DPR-55 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 I RENEWED LICENSE NO. DPR-23

Subject:

TRANSMITTAL OF EMERGENCY PLAN IMPLEMENTING PROCEDURE:

AD-EP-ALL-1000, REVISION 2 In accordance with 10 CFR 50.4(b)(5)(iii) and 10 CFR 50.54(q)(5), Duke Energy is submitting Fleet Emergency Plan Implementing Procedure, AD-EP-ALL-1000, Conduct of Emergency Preparedness.

The effective date of AD-EP-ALL-1000, Revision 2 was May 18, 2017. Duke Energy has evaluated this procedure revision in accordance with 10 CFR 50.54(q), and determined that the revision does not constitute a reduction in the effectiveness of the www.duke-energy.com U.S. Nuclear Regulatory Commission Page 2of4 Emergency Plan for the Duke Energy Fleet and that the Emergency Plan, as changed, continue to meet the standards of 10 CFR 50.47(b).

Enclosure 1 provides a 10 CFR 50.54(q)(5) summary for procedure, AD-EP-ALL-1000, Revision 2. Enclosure 2 contains a copy of procedure, AD-EP-ALL-1000, Revision 2. This document contains no regulatory commitments.

Please refer any questions regarding this submittal to Art Zaremba at 980-373-2062.

Sincerely';t.

.4-M. Christopher Nolan Director -Nuclear Regulatory Affairs

Enclosures:

1. 10 CFR 50.54(q)(5)

Summary 2. Copy of Fleet Emergency Preparedness Procedure U.S. Nuclear Regulatory Commission Page 3of4 xc (w/ Enclosures):

C. Haney, Regional Administrator U. S. Nuclear Regulatory Commission

-Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 A.L. Hon, Project Manager (BSEP) U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 D.J. Galvin, Project Manager (HBRSEP, Unit 2) U. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 Michael Mahoney, Project Manager (Catawba and McGuire) U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 A. L. Klett, Senior Project Manager (ONS) U. S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8 G9A 11555 Rockville Pike Rockville, MD 20852-2738 M.P. Catts, NRC Senior Resident Inspector Brunswick Steam Electric Plant, Unit Nos. 1 and 2 G.R. Eatmon (Acting) NRC Senior Resident Inspector H.B. Robinson Steam Electric Plant, Unit No. 2 J.D. Austin NRC Senior Resident Inspector Catawba Nuclear Station G.A. Hutto NRC Senior Resident Inspector McGuire Nuclear Station U.S. Nuclear Regulatory Commission Page 4 of 5 xc (continued):

E.L. Crowe NRC Senior Resident Inspector Oconee Nuclear Station