Emergency Plan Revision 2019-001
ML19050A179
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 02/07/2019
From:
Duke Energy Carolinas
To:
Office of Nuclear Reactor Regulation
Shared Package
ML19050A236 List:
References
RA-19-0105
Download: ML19050A179 (3)


Text

Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, -270, and -287 OCONEE NUCLEAR STATION EMERGENCY PLAN REVISION 2019-001 10 CFR 50.54 (q)

SUMMARY

OF CHANGES ATIACHMENT 1 Page 1 of3

Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, -270, and -287 The following changes were made to the Oconee Nuclear Station Emergency Plan:

  1. PaAe /Section . Current Proposed ChanAe
1. Cover Revision No. 006 Revision No. 007
2. App 1,2,7 NIA deleted Introduction Sections A,B,E,F,G,H blank cover
3. App 1 Semi-Annual Semi-Annual p.5 For periodic emergency planning requirements .... For periodic emergency planning requirements ....
4. App 1 Site Boundary Site Boundary p.5 That area, including the protected That area, including the protected area, area, in which DPC has the in which Duke Energy has the authority ... authority ...
5. App 2, p.3 Enclosure 4.3 of RP/O/A/1000/001 FAD - ON - EP-EAL-EALMATRIX, ONS 8(1) provides the Operations Shift NEI 99-01 REV 6 WALLCHAR T provides the Shift Manager in the Manager in the Control Room ....

Control Room ...

6. App 7 p.1 ... it provides for communication a ... it provides for communication of a 2nd par, 2nd limited set of parameters from ONS limited set of parameters from ONS to sentence the NRC during an emergency to the NRC during an emergency
7. App 7 p.1 EROS does not perform a Risk EROS does not perform a Risk 3rd par, last Significant Planning Standard Significant Planning Standard (RSPS) sentence and therefore is excluded from NEI04-(RSPS) and therefore excluded 04 from NEI04-04
8. Introduction ... and Groundwater Monitoring ... and Groundwater Monitoring p.1 Sampling and Analysis Plan, CTP Sampling and Analysis Plan, CTP 1, 2, 3.

1, 2,3.

9. Introduction 4. 10-mile area (Aa-2 thru F-2) 4. 10-mile area (A-2 thru F-2)

P.5

10. Introduction 6. Site evacuation resassembly 6. Site evacuation reassembly p.5 locations locations
11. List of Figures ... Operational Support Center. .. ... Operations Support Center. ..

H-2 H-17

12. Section A In the event Security is not . In the event Security is not available
p. A-3 available to perform the activities to perform the activities such as during a security threat the SM or designee will such as during a security threat activate the ERO.

the OSM or designee will activate -

the ERO.

13. Fig A-2A OSM SM Fig A-28 OPERATON S OPERATIONS SAFETY ASSURANCE ORGANIZATIONAL EFFECTIVENESS NUCLEAR SUPPLY CHAIN GENERATION SUPPLY CHAIN
14. Table B-1a Ops Shift Manager Shift Manager row2 Page 2 of 3

Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, -270, and -287

  1. Page /Section Current Proposed Change
15. Section E Operations Shift Shift Manager/Emergenc y Coordinator E.1&E.2 Manager/Emergenc y Coordinator 2nd par
16. F.1.e Operational Support Center Operations Support Center p.F-4 step 1
p. F-5 step 3 F.2 last par.

Fig F-1

17. F.1.e Superintendent of Operations Nuclear Operations Manager p.F-4 step 3
p. F-5 step 2
18. G1&G2 Emergency Planning Support Services Manager/designee 2nd par Manager/designee
19. Fiqure G-1 Calendar Information Booklet
20. Section H NIA delete blank cover
21. H.1.b Nuclear Supply Chain Generation Supply Chain
22. Figure H-1 NIA removed highlighting from title Fiqure H-2
23. Figure H-2 TYPICAL OPERATIONS TYPICAL OPERATIONS SUPPORT Title SUPPORT CENTER CENTER (OSC)

(OSC) PRIMARY LOCATION PRIMARY LOCATION UNIT 3 OPERATIONS CENTER UNIT 3 OPERATONS CENTER

24. P.2&P.3 Manager of Emergency Support Services Manager P.4&P.5 Preparedness
25. P.2&P.3 Manager, Emergency Support Services Manager Preparedness Page 3 of 3