RA-19-0105, Emergency Plan Revision 2019-001
| ML19050A179 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 02/07/2019 |
| From: | Duke Energy Carolinas |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19050A236 | List: |
| References | |
| RA-19-0105 | |
| Download: ML19050A179 (3) | |
Text
Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, -270, and -287 OCONEE NUCLEAR STATION EMERGENCY PLAN REVISION 2019-001 10 CFR 50.54 (q)
SUMMARY
OF CHANGES ATIACHMENT 1 Page 1 of3
Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, -270, and -287 The following changes were made to the Oconee Nuclear Station Emergency Plan:
PaAe /Section.
Current Proposed ChanAe
- 1.
Cover Revision No. 006 Revision No. 007
- 2.
App 1,2,7 NIA deleted Introduction Sections A,B,E,F,G,H blank cover
- 3.
App 1 Semi-Annual Semi-Annual p.5 For periodic emergency planning requirements....
For periodic emergency planning requirements....
- 4.
App 1 Site Boundary Site Boundary p.5 That area, including the protected That area, including the protected area, area, in which DPC has the in which Duke Energy has the authority...
authority...
- 5.
App 2, p.3.3 of RP/O/A/1000/001 FAD - ON - EP-EAL-EALMATRIX, ONS 8(1) provides the Operations Shift NEI 99-01 REV 6 WALLCHART Manager in the Control Room....
provides the Shift Manager in the Control Room...
- 6.
App 7 p.1
... it provides for communication a
... it provides for communication of a 2nd par, 2nd limited set of parameters from ONS limited set of parameters from ONS to sentence to the NRC during an emergency the NRC during an emergency
- 7.
App 7 p.1 EROS does not perform a Risk EROS does not perform a Risk 3rd par, last Significant Planning Standard Significant Planning Standard (RSPS) sentence (RSPS) and therefore excluded and therefore is excluded from NEI04-from NEI04-04 04
- 8.
Introduction
... and Groundwater Monitoring
... and Groundwater Monitoring p.1 Sampling and Analysis Plan, CTP Sampling and Analysis Plan, CTP 1, 2, 1, 2,3.
- 3.
- 9.
Introduction
- 4. 10-mile area (Aa-2 thru F-2)
- 4. 10-mile area (A-2 thru F-2)
P.5
- 10.
Introduction
- 6. Site evacuation resassembly
- 6. Site evacuation reassembly p.5 locations locations
- 11.
List of Figures
... Operational Support Center...
... Operations Support Center...
H-2 H-17
- 12.
Section A In the event Security is not
. In the event Security is not available
- p. A-3 available to perform the activities to perform the activities such as during such as during a security threat a security threat the SM or designee will the OSM or designee will activate - activate the ERO.
the ERO.
- 13.
Fig A-2A OSM SM Fig A-28 OPERATONS OPERATIONS SAFETY ASSURANCE ORGANIZATIONAL EFFECTIVENESS NUCLEAR SUPPLY CHAIN GENERATION SUPPLY CHAIN
- 14.
Table B-1a Ops Shift Manager Shift Manager row2 Page 2 of 3
Page /Section
- 15.
Section E E.1&E.2 2nd par
- 16.
F.1.e p.F-4 step 1
- p. F-5 step 3 F.2 last par.
Fig F-1
- 17.
F.1.e p.F-4 step 3
- p. F-5 step 2
- 18.
G1&G2 2nd par
- 19.
Fiqure G-1
- 20.
Section H blank cover
- 21.
- 22.
Figure H-1 Fiqure H-2
- 23.
Figure H-2 Title
- 24.
P.2&P.3 P.4&P.5
- 25.
P.2&P.3 Current Operations Shift Manager/Emergency Coordinator Operational Support Center Superintendent of Operations Emergency Planning Manager/designee Calendar NIA Nuclear Supply Chain NIA TYPICAL OPERATIONS SUPPORT CENTER (OSC)
PRIMARY LOCATION UNIT 3 OPERATONS CENTER Manager of Emergency Preparedness Manager, Emergency Preparedness Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, -270, and -287 Proposed Change Shift Manager/Emergency Coordinator Operations Support Center Nuclear Operations Manager Support Services Manager/designee Information Booklet delete Generation Supply Chain removed highlighting from title TYPICAL OPERATIONS SUPPORT CENTER (OSC)
PRIMARY LOCATION UNIT 3 OPERATIONS CENTER Support Services Manager Support Services Manager Page 3 of 3