RA-19-0105, Emergency Plan Revision 2019-001
(Redirected from RA-19-0105)
Jump to navigation
Jump to search
ML19050A179 | |
Person / Time | |
---|---|
Site: | Oconee |
Issue date: | 02/07/2019 |
From: | Duke Energy Carolinas |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML19050A236 | List: |
References | |
RA-19-0105 | |
Download: ML19050A179 (3) | |
Text
Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, -270, and -287 OCONEE NUCLEAR STATION EMERGENCY PLAN REVISION 2019-001 10 CFR 50.54 (q)
SUMMARY
OF CHANGES ATIACHMENT 1 Page 1 of3
Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, -270, and -287 The following changes were made to the Oconee Nuclear Station Emergency Plan:
- PaAe /Section . Current Proposed ChanAe
- 1. Cover Revision No. 006 Revision No. 007
- 2. App 1,2,7 NIA deleted Introduction Sections A,B,E,F,G,H blank cover
- 3. App 1 Semi-Annual Semi-Annual p.5 For periodic emergency planning requirements .... For periodic emergency planning requirements ....
- 4. App 1 Site Boundary Site Boundary p.5 That area, including the protected That area, including the protected area, area, in which DPC has the in which Duke Energy has the authority ... authority ...
- 5. App 2, p.3 Enclosure 4.3 of RP/O/A/1000/001 FAD - ON - EP-EAL-EALMATRIX, ONS 8(1) provides the Operations Shift NEI 99-01 REV 6 WALLCHAR T provides the Shift Manager in the Manager in the Control Room ....
Control Room ...
- 6. App 7 p.1 ... it provides for communication a ... it provides for communication of a 2nd par, 2nd limited set of parameters from ONS limited set of parameters from ONS to sentence the NRC during an emergency to the NRC during an emergency
- 7. App 7 p.1 EROS does not perform a Risk EROS does not perform a Risk 3rd par, last Significant Planning Standard Significant Planning Standard (RSPS) sentence and therefore is excluded from NEI04-(RSPS) and therefore excluded 04 from NEI04-04
- 8. Introduction ... and Groundwater Monitoring ... and Groundwater Monitoring p.1 Sampling and Analysis Plan, CTP Sampling and Analysis Plan, CTP 1, 2, 3.
1, 2,3.
- 9. Introduction 4. 10-mile area (Aa-2 thru F-2) 4. 10-mile area (A-2 thru F-2)
P.5
- 10. Introduction 6. Site evacuation resassembly 6. Site evacuation reassembly p.5 locations locations
- 11. List of Figures ... Operational Support Center. .. ... Operations Support Center. ..
H-2 H-17
- 12. Section A In the event Security is not . In the event Security is not available
- p. A-3 available to perform the activities to perform the activities such as during a security threat the SM or designee will such as during a security threat activate the ERO.
the OSM or designee will activate -
the ERO.
- 13. Fig A-2A OSM SM Fig A-28 OPERATON S OPERATIONS SAFETY ASSURANCE ORGANIZATIONAL EFFECTIVENESS NUCLEAR SUPPLY CHAIN GENERATION SUPPLY CHAIN
- 14. Table B-1a Ops Shift Manager Shift Manager row2 Page 2 of 3
Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, -270, and -287
- Page /Section Current Proposed Change
- 15. Section E Operations Shift Shift Manager/Emergenc y Coordinator E.1&E.2 Manager/Emergenc y Coordinator 2nd par
- 16. F.1.e Operational Support Center Operations Support Center p.F-4 step 1
- p. F-5 step 3 F.2 last par.
Fig F-1
- 17. F.1.e Superintendent of Operations Nuclear Operations Manager p.F-4 step 3
- p. F-5 step 2
- 18. G1&G2 Emergency Planning Support Services Manager/designee 2nd par Manager/designee
- 19. Fiqure G-1 Calendar Information Booklet
- 20. Section H NIA delete blank cover
- 21. H.1.b Nuclear Supply Chain Generation Supply Chain
- 22. Figure H-1 NIA removed highlighting from title Fiqure H-2
- 23. Figure H-2 TYPICAL OPERATIONS TYPICAL OPERATIONS SUPPORT Title SUPPORT CENTER CENTER (OSC)
(OSC) PRIMARY LOCATION PRIMARY LOCATION UNIT 3 OPERATIONS CENTER UNIT 3 OPERATONS CENTER
- 24. P.2&P.3 Manager of Emergency Support Services Manager P.4&P.5 Preparedness
- 25. P.2&P.3 Manager, Emergency Support Services Manager Preparedness Page 3 of 3