Text
FIGURE P1
- EMERGENCY PLAN IMPLEMENTING PROCEDURES P.
Responsibility for the Planning Effort: Development, Periodic Review and Distribution of the Emergency Plans To assure that responsibilities for plan development, review and distribution of emergency plans are established and that planners are properly trained:
P.1 Training for Emergency Preparedness Personnel P.2 & P.3 P.4 & P.5 Training for emergency preparedness personnel shall be provided in the fonn of workshop/seminar sessions on an annual basis. Courses developed by the Duke Training Center are also available in technically related subjects that will enhance the working knowledge of these people.
Overall Authority The Site Vice-President has the overall authority and responsibility for all hazards emergency response planning. The planning effort is delegated to the Manager, Emergency Preparedness.
The Manager of Emergency Preparedness at the Oconee Nuclear Site shall have the responsibility for the development, review and coordination of the site emergency plans with other response organizations and shall be responsible for conducting the biennial exercise, drills and training sessions to test the Oconee Nuclear Site Emergency Plan. This person is employed in the Organizational Effectiveness Group.
Review and Update of Emergency Plan The ONS Emergency Plan shall be reviewed and updated annually. An in-depth review of the Emergency Plan will be made to determine if any/all changes have been made as a result of drills, exercises, commitments, audits, new regulatory requirements, and any other identified mechanism used to detennine the appropriateness of the Emergency Plan. The Manager of Emergency Preparedness or designee is responsible for conducting the review and updating/revising the Emergency Plan and/or Implementing Procedures, as required. Once the review has been completed and changes made as detennined, the Emergency Plan shall be certified as current.
Approved revisions of the Emergency Plan and Implementing Procedures shall be distributed according to Appendix 6, (Distribution of Emergency Plan and Implementing Procedures). Appendix 6 carries an itemized list of all organizations and individuals receiving copies of the Emergency Plan and Implementing Procedures. Revised pages of the Emergency Plan shall be dated and marked to show where changes have been made.
P-1 Rev. 2017-003 September 2017
~------------
FIGURE P1 EMERGENCY PLAN IMPLEMENTING PROCEDURES P.6 Supporting: Plans Figure P-2 lists plans in support of the ONS Emergency Plan.
P. 7 Implementing Procedures Written procedures will be established, implemented and maintained covering the activities associated with emergency plan implementation. Each procedure and changes thereto, shall be approved by the responsible manager prior to implementation.
Implementing procedures are indexed and cross referenced to the section applicable in NUREG 0654. (Figure P-1)
P.8 Table of Contents The Oconee Nuclear Site Emergency Plan and Implementing Procedures contain a table of contents and an index tab system.
P.9 Independent Audit The NOS Audit Manager will arrange for an independent review of Oconee Nuclear Station's Emergency Preparedness Program as necessary, based on an assessment against performance indicators, and as soon as reasonably practicable after a change occurs in personnel, procedures, equipment, or facilities that potentially could adversely affect emergency preparedness, but no longer than 12 months after the change. In any case, all elements of the emergency preparedness program will be reviewed at least once every 24 months. Guidance for performing the assessment against the performance indicators is provided in Administrative Procedure AD-NO-ALL-1001. The independent review will be conducted by the Independent Nuclear Oversight Division, which will include the following plans, procedures, training programs, drills/exercises, equipment, and State/local government interfaces:
- 1.
Oconee Nuclear Station Emergency Plan
- 2.
Oconee Nuclear Station Emergency Plan Implementing Procedures
- 3.
State/Local Support Agency Training Program
- 4.
Site Emergency Response Training Program
- 5.
Public & Media Training/ Awareness
- 6.
Equipment: Communications, Monitoring, Meteorological, Public Alerting
- 7.
State/Local Plan Interface The review findings will be submitted to the appropriate corporate and nuclear site management. The part of the review involving the evaluation of the adequacy of P-2 Rev. 2017-003 September 2017
FIGURE P1 EMERGENCY PLAN IMPLEMENTING PROCEDURES interface with State and local governments will be reported to the appropriate State and local governments. Corporate or nuclear site management, as appropriate, will evaluate the findings affecting their area of responsibility and ensure effective corrective actions are taken. The results of the review, along with recommendations for improvements, will be documented, and retained for a period of five (5) years.
P.10 Phone Number Update The Emergency Telephone Directory is updated quarterly.
P-3 Rev. 2017-003 September 2017
Emergency Plan Section(s}
Implemented A1a A1b A1c A1d A1e A2a A2b A3 A4 81 82 83 83 FIGURE P1 EMERGENCY PLAN IMPLEMENTING PROCEDURES Cross Reference Procedure Procedure Title Assignment of Responsibility ONS E Plan ONS Emergency Plan, Appendix 5 Agreement Letters RP/O/A/1000/002 Control Room Emergency Coordinator Procedure RP/O/A/1000/019 Technical Support Center Emergency Coordinator Procedure RP/O/A/1000/025 Operational Support Center Manager Procedure AD-EP-ALL-0107 Standard Procedure for EOF Services SR/O/A/2000/003 Activation of the Emergency Operations Facility ONS E Plan ONS Emergency Plan, Fig A 1 RP/O/A/1000/002 Control Room Emergency Coordinator Procedure SR/O/A/2000/003 Activation of the Emergency Operations Facility RP/O/A/1000/002 Control Room Emergency Coordinator Procedure NA State/County Responsibility NA State/County Responsibility ONS E Plan ONS Emergency Plan, Appendix 5.
RP/O/A/1000/002 Control Room Emergency Coordinator Procedure RP/O/A/1000/019 Technical Support Center Emergency Coordinator Procedure RP/O/A/1000/025 Operational Support Center Manager Procedure SR/O/A/2000/003 Activation of the EmerQency Operations Facility On-Site Emergency Organization ONS E Plan NSD-117 RP/O/A/1000/002 RP/O/A/1000/019 RP/O/A/1000/022 RP/O/A/1000/029 AD-EP-ALL-"0107 RP/O/A/1000/002 RP/O/A/1000/019 SR/O/A/2000/003 RP/O/A/1000/002 RP/O/A/1000/019 SR/O/A/2000/003 NSD-117 ONS Emergency Plan Emergency Response Organization Staffing, Training, and Responsibilities Control Room Emergency Coordinator Procedure Technical SL,1pport Center Emergency Coordinator Procedure Procedure For Major Site Damage Assessment And Repair Fire Brigade Response Standard Procedure for EOF Services Control Room Emergency Coordinator Procedure Technical Support Center Emergency Coordinator Procedure Activation of the Emergency Operations Facility Control Room Emergency Coordinator Procedure Technical Support Center Emergency Coordinator.
Procedure Activation of the Emergency Operations Facility Emergency Response Organization Staffing, Training, P-4 Rev. 2017-003 September 2017
Emergency Plan Section(s)
Implemented 84 85 86 87a-d 88 89 C1a, b, c C2a C2b C3 C4 FIGURE P1 EMERGENCY PLAN IMPLEMENTING PROCEDURES Cross Reference Procedure Procedure Title and Responsibilities RP/O/A/1000/002 Control Room Emergency Coordinator Procedure RP/O/A/1000/019 Technical Support Center Emergency Coordinator Procedure SR/O/A/2000/003 Activation of the Emergency Operations Facility NSD-117 Emergency Response Organization Staffing, Training, and Responsibilities OMP 2-16 Shift Turnover NSD-117 Emergency Response Organization Staffing, Training, and Responsibilities RP/O/A/1000/019 Technical Support Center Emergency Coordinator Procedure RP/O/A/1000/025 Operational Support Center Manager Procedure SR/O/A/2000/003 Activation of the Emergencv Operations Facilitv ONS E Plan ONS Emergency Plan NSD-117 Emergency Response Organization Staffing, Training, and Responsibilities SR/O/A/2000/003 Activation of the Emergency Operations Facility AD-EP-ALL-0107 Standard Procedure for EOF Services NSD-117 Emergency Response Organization Staffing, Training, and Responsibilities SR/O/A/2000/003 Activation of the EmerQencv Operations Facility AD-E P-ALL-0107 Standard Procedure for EOF Services RP/O/A/1000/027 Re-Entry Recovery Procedure RP/O/A/1000/031 Joint Information Center Emergency Response Plan ONS E Plan ONS Emergency Plan, Appendix 5 ONS E Plan ONS EmerQency Plan, Appendix 5 Emergency Response Support and Resources ONS E Plan ONS EmerQency Plan, Appendix 5 SR/O/A/2000/003 Activation of the Emergency Operations Facility RP/O/A/1000/031 Joint Information Center Emergency Response Plan RP/O/A/1000/037 Incident Command Post (ICP) Operations and Radiation Protection Liaison Guidelines NA State/County Responsibility EP FAM 3.11
- State/County EOC Liaison Reference Manual RP/O/A/1000/037 Incident Command Post (ICP) Operations and Radiation Protection Liaison Guidelines HP/0/8/1009/026 Environmental Monitoring For Emergency Conditions ONS E Plan ONS EmerQencv Plan, Aooendix 5 SR/O/A/2000/003 Activation of the Emergency Operations Facility Emergency Classification System P-5 Rev. 2017-003 September 2017
Emergency Plan Section(s)
Implemented 01a, b, c 02 03 04 E1 E2 E3 E4a-n ES E6 E7 EB F1a F1a FIGURE P1 EMERGENCY PLAN IMPLEMENTING PROCEDURES Cross Reference Procedure Procedure Title ONS E Plan ONS Emergency Plan RP/O/A/1000/001 Emergency Classification RP/O/A/1000/001 Emergency Classification NA State/County Responsibility NA State/County Responsibility Notification Methods and Procedures RP/O/A/1000/002 Control Room Emergency Coordinator Procedure RP/O/A/1000/01 SA Offsite Communications From The Control Room RP/O/A/1000/0158 Offsite Communications From The Technical Support Center RP/O/A/1000/019 Technical Support Center Emergency Coordinator Procedure RP/O/A/1000/024 Protective Action Recommendations SR/O/A/2000/003 Activation of the Emergency Operations Facility RP/O/A/1000/002 Control Room Emergency Coordinator Procedure RP/O/A/1000/002 Control Room Emen::iencv Coordinator Procedure RP/O/A/1000/01 SA Offsite Communications From The Control Room RP/O/A/1000/0158 Offsite Communications From The Technical Support Center RP/O/A/1000/019 Technical Support Center Emergency Coordinator Procedure RP/O/A/1000/024 Protective Action Recommendations SR/O/A/2000/003 Activation of the Emergency Operations Facility SR/O/A/2000/004 Notification to States and Counties Facility for Catawba, McGuire, and Oconee RP/O/A/1000/002 Control Room Emergency Coordinator Procedure RP/O/A/1000/01 SA Offsite Communications From The Control Room RP/O/A/1000/0158 Offsite Communications From The Technical Support Center RP/O/A/1000/019 Technical Support Center Emergency Coordinator Procedure RP/O/A/1000/024 Protective Action Recommendations SR/O/A/2000/003 Activation of the Emeroencv Operations Facility NA State/County Responsibility EP FAM 3.3 Alert and Notification System (Siren Program)
RP/O/A/1000/024 Protective Action Recommendations SR/O/A/2000/003 Activation of the Emergency Operations Facility RP/O/A/1000/017 Spill Response Emergency Communications RP/O/A/1000/002 RP/O/A/1000/01 SA RP/O/A/1000/0158 Control Room Emergency Coordinator Procedure Offsite Communications From The Control Room Offsite Communications From The Technical Support Center P-6 Rev. 2017-003 September 2017
Emergency Plan Section(s)
Implemented F1b F1c F1d F1e F1f F2 F3 G1a,b,c G2 G3a, b FIGURE P1 EMERGENCY PLAN IMPLEMENTING PROCEDURES Cross Reference Procedure Procedure Title RPIOIA/10001019 Technical Support Center Emergency Coordinator Procedure SRIOIAl20001003 Activation of the Emergency Operations Facility PTIOIA/20001002 Periodic Test of Emergency Response Communications Equipment RPIOIAl10001002 Control Room Emergency Coordinator Procedure RPIOIAl10001015A Offsite Communications From The Control Room RPIOIAl100010158 Offsite Communications From The Technical Support Center RPIOIA/10001019 Technical Support Center Emergency Coordinator Procedure RPIOIAl10001003A EROS Operation PTIOIAl20001009 Emergency Response Data System Quarterly Test SRIOIA/20001003 Activation of the Emergency Operations Facility PTIOIA/20001002 Periodic Test of Emergency Response Communications Equipment STIOIAl46001086 Standard Procedure For Periodic Verification of EOF Communication Equipment Operation and Equipment/
Supply Inventory-STIOIA/46001094 Standard Procedure For Periodic Test Of The EOF Selective Signaling, ENS and ETS RPIOIA/10001002 Control Room Emergency Coordinator Procedure PTIOIAl20001002 Periodic Test of Emergency Response Communications Equipment RPIOIA/10001003 A EROS Operation PTIOIAl20001009 Emergency Response Data System Quarterly Test PTIOIA/20001002 Periodic Test of Emergency Response Communications Equipment RPIOIAl10001016 MERT Activation Procedure For Medical, Confined Space, and Hiqh Angle Rescue Emergencies RPIOIA/10001025 Operational Support Center Manager Procedure PT IOI A/20001002 Periodic Test of Emergency Response Communications Equipment PTIOIA/20001009 Emerqency Response Data System Quarterly Test Public Education and Information EP FAM 3.6 NPM Chapter 15 EP FAM 3.6 NPM Chapter 15 RPIOIAl10001028 Alert and Notification System - Oconee Specific Supplement Corporate Communications Departmental Interface Agreement Alert and Notification System - Oconee Specific Supplement Corporate Communications Departmental Interface Agreement Nuclear Communications Emergency Response P-7 Rev. 2017-003 September 2017
Emergency Plan Section(s)
Implemented G4a, b, c G5 H1a, b, c H2 H3 H4 H4 FIGURE P1 EMERGENCY PLAN IMPLEMENTING PROCEDURES Cross Reference Procedure Procedure Title Plan RPIOIA/10001031 Joint Information Center Emergency Response Plan SRIOIA/2000/001 Standard Procedure For Corporate Communications Response To The Emergency Operations Facility RPIOIAl10001028 Nuclear Communications Emergency Response Plan RPIOIA/10001031 Joint Information Center Emergency Response Plan SRIOIA/20001001 Standard Procedure For Corporate Communications Response To The Emergency Operations Facility NPM Chapter 15 Corporate Communications Departmental Interface Agreement Emergency Facilities and Equipment RPIOIA/10001019 RPIOIA/10001025 HPIOIBl10091001 PTIOIAl20001002 PT IOI A/20001008 PTIOIAl20001010 SRIOIA/20001003 ST IOI A/46001086 ST IOI A/46001094 NA NSD-117 RPIOIA/10001002 RPIOIA/10001019 RPIOIA/10001025 RPIOIA/1000/031 SRIOIA/20001003 SRIOIA/20001001 Technical Support Center Emergency Coordinator Procedure Operational Support Center Manager Procedure Emergency Equipment Inventory and Instrument Check Periodic Test of Emergency Response Communications Equipment Procedure to Verify the Availability of Supplies and Equipment in the Emergency Response Facilities Review of Emergency Plan and Implementing Procedures Activation of the Emergency Operations Facility Standard Procedure For Periodic Verification of EOF Communication Equipment Operation and
- Equipment/Supply Inventory Standard Procedure For Periodic Test Of The EOF Selective Signaling, ENS and ETS State/County Responsibility Emergency Response Organization Staffing, Training, and Responsibilities Control Room Emerqency Coordinator Procedure Technical Support Center Emergency Coordinator Procedure Operational Support Center Manager Procedure Joint Information Center Emergency Response Plan Activation of the Emergency Operations Facility Standard Procedure For Corporate Communications P-8 Rev. 2017-003 September 2017
Emergency Plan Section(s)
Implemented HS HSa, b, c, d H6a, b,c H7 H8 H9 H9 FIGURE P1 EMERGENCY PLAN IMPLEMENTING PROCEDURES Procedure AD-EP-ALL-0107 RP/O/A/1000/001 ONS E Plan IP/O/B/1601/003 ONS E Plan IP/O/B/1601/003 ONS ODCM HP/O/B/1009/001 HP/O/B/1009/023 PT/O/A/2000/008 ST/O/A/4600/086 PT /O/B/0250/030 PT /O/B/0250/032 PT /O/B/0250/045 CP/O/B/2001/008 RP/O/A/1000/017 HP/O/B/1009/001 HP/O/B/1009/023 ONS E Plan IP/O/B/1601/003 AD-EP-ALL-0202 RP/O/A/1000/024 ONS E Plan IP/O/B/1601/003 ONS ODCM HP/O/B/1009/001 PT/O/A/2000/008 ST IOI A/4600/086 PT /O/B/0250/030 PT /O/B/0250/032 Cross Reference Procedure Title Response To The Emergency Operations Facility Standard Procedure for EOF Services Emergency Classification ONS Emergency Plan Meteorological Equipment Checks ONS Emen::iency Plan Meteorological Equipment Checks ONS Offsite Dose Calculation Manual Emergency Equipment Inventory and Instrument Check Radiation Protection Emergency Response Procedure to Verify the Availability of Supplies and Equipment in the Emergency Response Facilities Standard Procedure For Periodic Verification of EOF Communication Equipment Operation and Equipment/Supply Inventory Quarterly Fire Brigade Equipment Inspection Quarterly Inspection Of Emergency Medical Equipment Quarterly Inspection Of Hazardous Materials Response Team Equipment Chemistry Safety Equipment And Spill Control
Response
Spill Response Emergency Equipment Inventory and Instrument Check Radiation Protection Emergency Response ONS Emergency Plan Meteorological Equipment Checks Emergency Response Offsite Dose Assessment Protective Action Recommendations ONS Emergency Plan Meteorological Equipment Checks ONS Offsite Dose Calculation Manual Emergency Equipment Inventory and Instrument Check Procedure to Verify the Availability of Supplies and Equipment in the Emergency Response Facilities
'Standard Procedure For Periodic Verification of EOF Communication Equipment Operation and Equipment/Supply Inventory Quarterly Fire Brigade Equipment Inspection Quarterly Inspection Of Emergency Medical P-9 Rev. 2017-003 September 201 7
Emergency Plan Section(s}
Implemented H10 H11 H12 11 12 12 FIGURE P1 EMERGENCY PLAN IMPLEMENTING PROCEDURES Cross Reference Procedure Procedure Title Equipment PTIOIBI02501045 Quarterly Inspection Of Hazardous Materials Response Team Equipment CPIOIBl20011008 Chemistry Safety Equipment And Spill Control Response RPIOIN10001025 Operational Support Center Manager Procedure ONS E Plan ONS Emergency Plan IPIOIBl16011003 Meteorological Equipment Checks ONS ODCM ONS Offsite Dose Calculation Manual HPIOIBl10091001 Emergency Equipment Inventory and Instrument Check PTIOIN20001008 Procedure to Verify the Availability of Supplies and Equipment in the Emergency Response Facilities ST IOI Al46001086 Standard Procedure For Periodic Verification of EOF Communication Equipment Operation and Equipment/Supply Inventory PT 1018102501030 Quarterly Fire Brigade Equipment Inspection PT 1018102501032 Quarterly Inspection Of Emergency Medical Equipment PT 1018102501045 Quarterly Inspection Of Hazardous Materials Response Team Equipment CPIOIBl20011008 Chemistry Safety Equipment And Spill Control
Response
ONS E Plan ONS Emergency Plan, Section H.11 HPIOIBl10091023 Radiation Protection Emergency Response AD-EP-ALL-0203 Protocol for the Field Monitoring Coordinator During Emergency Conditions SRIOIN20001003 Activation of the Emergency Operations Facility Accident Assessment ONS E Plan RPIOIN10001001 ONS E Plan RPIOIN10001018 CSM 5.1 CSM 5.2 CPl1 IN20021002 CPl21N20021002 CPl31N20021002 HPIOIBl10091009 ONS Emergency Plan, Section D Emergency Classification ONS Emergency Plan Core Damage Assessment Emergency Response Guidelines Procedure Use Guidelines During Emergency
Response
Rheodyne Sample Via Post Accident Liquid Samplino System (PALSS)
Rheodyne Sample Via Post Accident Liquid Sampling System (PALSS)
Rheodyne Sample Via Post Accident Liquid Samplino System (PALSS)
Procedure For Determining The lnplant P-10 Rev. 2017-003 September 2017
Emergency Plan Section(s)
Implemented 13a, b 14 15 16 17 17 18 19 FIGURE P1 EMERGENCY PLAN IMPLEMENTING PROCEDURES Procedure HP/0/8/1009/015 HP/0/8/1009/026 AD-EP-ALL-0202 AD-EP-ALL-0203 RP/O/A/1000/001 RP/O/A/1000/024 HP/0/8/1009/022 ONS ODCM AD-EP-ALL -,0202 HP/0/8/1009/018 HP/0/8/1009/022 AD-EP-ALL-0202 RP/O/A/1000/002 RP/O/A/1000/003 A RP/O/A/1000/015 A RP/O/A/1000/015 8 RP/O/A/1000/019 SR/O/A/2000/003 SR/O/A/2000/004 AD-EP-ALL-0202 SR/O/A/2000/003 AD-EP-ALL-0203 HP/0/8/1009/026 SR/O/A/2000/003 AD-EP-ALL-0203 HP/0/8/1009/026 HP/0/8/1009/026 Cross Reference Procedure Title Radioiodine Concentration During Accident Conditions Procedure For Sampling And Quantifying High Level Gaseous, Radioiodine And Particulate Radioactivity Environmental Monitoring For Emergency Conditions Emergency Response Offsite Dose Assessment Protocol for the Field Monitoring Coordinator During Emergency Conditions Emergency Classification Protective Action Recommendations On-Shift Off-Site Dose Projections ONS Offsite Dose Calculation Manual Emergency Response Offsite Dose Assessment Off-Site Dose Projections On-Shift Off-Site Dose Projections Emergency Response Offsite Dose Assessment Control Room Emergency Coordinator Procedure EROS Operation Offsite Communications From The Control Room Offsite Communications From The Technical Support Center Technical Support Center Emergency Coordinator Procedure Activation of the Emergency Operations Facility Notification to States and Counties from the Emergency Operations Facility for Catawba, McGuire, and Oconee Emergency Response Offsite Dose Assessment Activation of the Emergency Operations Facility Protocol for the Field Monitoring Coordinator During Emergency Conditions Environmental Monitoring For Emergency Conditions Activation of the Emergency Operations Facility Protocol for the Field Monitoring Coordinator During Emergency Conditions Environmental Monitoring For Emergency Conditions Environmental Monitoring For Emergency Conditions P-11 Rev. 2017-003 September 2017
Emergency Plan Section(s)
Implemented 110 111 J1 J2 J3 J4 J4 J5/J6 J7 FIGURE P1 EMERGENCY PLAN IMPLEMENTING PROCEDURES Procedure AD-EP-ALL-0203 AD-EP-ALL-0202 HP/0/8/1009/020 HP/0/8/1009/026 NA AP/O/A/1700/045 RP/O/A/1000/009 RP/O/A/1000/010 NSD-114 HP/0/8/1009/016 RP/O/A/1000/010 AD-EP-ALL-0202 NSD-114 AP/O/A/1700/045 HP/0/8/1009/018 RP/O/A/1000/009 RP/O/A/1000/010 AD-EP-ALL-0202 HP/0/8/1009/016 AD-EP-ALL-0202 RP/O/A/1000/009 RP/O/A/1000/010 NSD-114 AP/O/A/1700/045 HP/0/8/1009/009 RP/O/A/1000/009 AD-EP-ALL-0204 RPM RP/O/A/1000/024 SR/O/A/2000/003 Cross Reference Procedure Title Protocol for the Field Monitoring Coordinator During Emergency Conditions Emergency Response Offsite Dose Assessment Estimating Food Chain Doses Under Post-Accident Conditions Environmental Monitoring For Emergency Conditions State/County Responsibility Protective Response Site Security Threats Procedure For Site Assembly Procedure For Emergency Evacuation/Relocation Of Site Personnel Site Assembly/Site Evacuation Procedure For Emergency Decontamination Of Personnel And Vehicles On-Site And From Off-Site Remote Assembly Areas Procedure For Emergency Evacuation/Relocation Of Site Personnel Emergency Response Offsite Dose Assessment Site Assembly/Site Evacuation Site Security Threats Off-Site Dose Projections Procedure For Site Assembly Procedure For Emergency Evacuation/Relocation Of Site Personnel Emergency Response Offsite Dose Assessment Procedure For Emergency Decontamination Of Personnel And Vehicles On-Site And From Off-Site Remote Assembly Areas Emergency Response Offsite Dose Assessment Procedure For Site Assembly Procedure For Emergency Evacuation/Relocation Of Site Personnel Site Assembly/Site Evacuation Site Security Threats Procedure For Determining The lnplant Airborne Radioiodine Concentration During Accident Conditions Procedure For Site Assembly Distribution of Potassium Iodide Tablets in the Event of a Radioiodine Release Radiation Protection Manual Protective Action Recommendations Activation of the Emen::iencv Operations Facility P-12 Rev. 2017-003 September 2017
Emergency Plan Section(s)
Implemented JB J9 J10a, b, c J10d - I J10m J11 J12 K1a - g K2 K3a K3a K3b K4 K5a, b, K5a, b, K6a, b, c K7 L1 FIGURE P1 EMERGENCY PLAN IMPLEMENTING PROCEDURES Cross Reference Procedure Procedure Title ONS-ETE-ONS Evacuation Time Estimates (ETE) Dated 12142012 12/14/2012 NA State/County Responsibility AP/O/A/1700/045 Site Security Threats RP/O/A/1000/009 Procedure For Site Assembly RP/O/A/1000/010 Procedure For Emergency Evacuation/Relocation Of Site Personnel ONS E Plan ONS Emergency Plan RPM Radiation Protection Manual NA State/County Responsibility RP/O/A/1000/024 Protective Action Recommendations SR/O/A/2000/003 Activation of the Emergency Operations Facility NA State/County Responsibility NA State/County Responsibility Radiological Exposure Control RP/0/8/1000/011 Planned Emergency Exposure AD-EP-ALL-0204 Distribution of Potassium Iodide Tablets in the Event of a Radioiodine Release RP/0/8/1000/011 Planned Emergency Exposure RPM Radiation Protection Manual HP/0/8/1009/001 Emergency Equipment Inventory and Instrument Check HP/0/8/1009/023 Radiation Protection Emergency Response RPM Radiation Protection Manual HP/0/8/1009/023 Radiation Protection Emergency Response NA State/County Responsibility RPM Radiation Protection Manual HP/0/8/1009/016 Procedure For Emergency Decontamination Of Personnel And Vehicles On-Site And From Off-Site Remote Assembly Areas HP/0/8/1009/024 Radiation Protection Response To A Medical Emergency RPM Radiation Protection Manual HP/0/8/1009/016 Procedure For Emergency Decontamination Of Personnel And Vehicles On-Site And From Off-Site Remote Assembly Areas HP/0/8/1009/001 Emergency Equipment Inventory and Instrument Check HP/0/8/1009/016 Procedure For Emergency Decontamination Of Personnel And Vehicles On-Site And From Off-Site Remote Assembly Areas Medical and Public Health Support ONS E Plan ONS Emergency Plan, Appendix 5 P-13 Rev. 2017-003 September 2017
Emergency Plan Section(s)
Implemented L2 L3 L4 M1 M2 M3 M4 N1a, b N2, c, d, e, f, g, h, i FIGURE P1 EMERGENCY PLAN IMPLEMENTING PROCEDURES Cross Reference Procedure Procedure Title HP/0/8/1009/001 Emergency Equipment Inventory and Instrument Check RP/O/A/1000/016 MERT Activation Procedure For Medical, Confined Space, and High Angle Rescue Emergencies HP/0/8/1009/001 Emergency Equipment Inventory and Instrument Check HP/0/8/1009/024 Radiation Protection Response To A Medical Emergency PT /0/8/0250/032 Quarterly Inspection Of Emergency Medical Equipment NA State/County Responsibility ONS E Plan.
ONS Emergency Plan, Appendix 5 RP/O/A/1000/016 MERT Activation Procedure For Medical, Confined Space, and High Angle Rescue Emergencies HP/0/8/1009/001 Emergency Equipment Inventory and Instrument Check HP/0/8/1009/024 Radiation Protection Response To A Medical Emergency Recovery and Reentry Planning and Post Accident Operations RP/O/A/1000/024 RP/O/A/1000/027 RP/O/A/1000/028 ONS E Plan RP/O/A/1000/027 RP/O/A/1000/028 RP/O/A/1000/019 RP/O/A/1000/025 RP/O/A/1000/027 SR/O/A/2000/003 AD-EP-ALL-0108 AD-EN-ALL-0200 RP/O/A/1000/027 AD-EP-ALL-0801 AD-EP-ALL-0802 AD-EP-ALL-0803 AD-E P-ALL-0801 AD-EP-ALL-0802 AD-EP-ALL-0803 Protective Action Recommendations Re-Entry Recovery Procedure Nuclear Communications Emergency Response Plan ONS Emergency Plan, Section M Re-Entry Recovery Procedure Nuclear Communications Emergency Response Plan Technical Support Center Emergency Coordinator Procedure Operational Support Center Manaoer Procedure Re-Entry Recovery Procedure Activation of the Emergency Operations Facility Activation and Operation of the Near-Site Joint Information Center Spill Response.
Re-Entry Recovery Procedure Exercises and Drills Design and Development of Drills and Exercises ConductinQ Drills and Exercises Evaluation and Critique of Drills and Exercises Design and Development of Drills and Exercises Conducting Drills and Exercises Evaluation and Critique of Drills and Exercises P-14 Rev. 2017-003 September 2017
Emergency Plan Section(s)
- Implemented N2a N2b N3 N4a, b NS 01 02 02 03 04.1,.2 04.3 04.4 04.5,.7 FIGURE P1 EMERGENCY PLAN IMPLEMENTING PROCEDURES Cross Reference Procedure Procedure Title PTIOIAl20001002 Periodic Test of Emergency Response Communications Equipment ST IOI A/46001086 Standard Procedure For Periodic Verification of EOF Communication Equipment Operation and Equipment/Supply Inventory ST IOI A/46001094 Standard Procedure For Periodic Test Of The EOF Selective Signaling, ENS and ETS PTIOIBl20001050 Fire Drill - Performance and Evaluation AD-E P-ALL-0801 Design and Development of Drills and Exercises AD-EP-ALL-0802 Conducting Drills and Exercises AD-EP-ALL-0803 Evaluation and Critique of Drills and Exercises AD-EP-ALL-0801 Design and Development of Drills and Exercises AD-EP-ALL-0802 Conducting Drills and Exercises AD-EP-ALL-0803 Evaluation and Critique of Drills and Exercises AD-EP-ALL-1000 Conduct Of Emergency Preparedness AD-E P-ALL-0801 Design and Development of Drills and Exercises AD-EP-ALL-0802 Conducting Drills and Exercises AD-EP-ALL-0803 Evaluation and Critique of Drills and Exercises Radiological Emergency Response Training NSD-117 ERTG-001 ETQS 7111.0 NSD-117 ERTG-001 ETQS 7111.0 NSD-119 ERTG-001 NSD-117 ERTG-001 ETQS 7111.0 ETQS 3104.0 ETQS 7104.0 ETQS 7111.0 NSD-119 Emergency Response Organization Staffing, Training, and Responsibilities Emergency Response Organization and Emergency Services Training Program Emergency Response Training Emergency Response Organization Staffing, Training, and Responsibilities Emergency Response Organization and Emergency Services Training Program Emergency Response Training Medical Emergency Response Team (MERT) Program Organization, Training, and Responsibilities Emergency Response Organization and Emergency Services Training Program Emergency Response Organization Staffing, Training, and Responsibilities Emergency Response Organization and Emergency Services Training Program Emergency Response Training Radiation Protection Training and Qualifications Radiation Protection Staff Professional Development Program Emergency Response Training Medical Emergency Response Team (MERT) Program Organization, Training, and Responsibilities P-15 Rev. 2017-003 September 2017
FIGURE P1 EMERGENCY PLAN IMPLEMENTING PROCEDURES Cross Reference Emergency Procedure Procedure Title Plan Section(s)
Implemented 04.6 ETQS7111.0 Emergency Response Training 04.8 ETQS 7111.0 Emergency Response Training 04.9 ETQS 7111.0 Emergency Response Training 04.10 OC6792-N Maint SPOC Team Emergency Response Training TTC 471-N Annual ERO Refresher /Update 04.11 ERTG-001 Emergency Response Organization and Emergency Services Training Program 05 ERTG-001 Emergency Response Organization and Emergency Services Traininq Proqram Responsibility for the Planning Effort:
Development, Periodic Review and Distribution of Emergency Plans P1 AD-E P-ALL-0501 P2 & P3 ONS E Plan P4 & PS PT/O/A/2000/010 AD-EP-ALL-1000 P6 ONS E Plan P7 ONS E Plan P8 ONS E Plan pg AD-NO-ALL-1001 Emergency Planner Staff Training and Qualification ONS Emergency Plan Review of Emergency Plan and Implementing Procedures Conduct Of Emergency Preparedness ONS Emergency Plan ONS Emergency Plan ONS Emergency Plan Conduct of Audit P-16 Rev. 2017-003 September 2017
Appendix 1 Appendix 2 Appendix 3 Appendix4 Appendix 5 Appendix 6 Appendix 7 Appendix 8 Appendix 9 Appendix 10 FIGURE P1 EMERGENCY PLAN IMPLEMENTING PROCEDURES Cross Reference Appendices Definitions Meteorology and Offsite Dose Assessment Program Alert and Notification System Description Evacuation Time Estimates Letters of Agreement Distribution List Emergency Data Transmittal System Spill Prevention Control and Countermeasure Plan ONS Pollution Prevention Plan Rev 11 Site DrawinQ ONS Chemical Treatment Ponds 1,2 and 3 Groundwater Monitoring Sampling and Analysis Plan Hazardous Materials Response Plan P-17 Rev. 2017-003 September 2017
FIGURE P1 EMERGENCY PLAN IMPLEMENTING PROCEDURES FIGUREP-2 DUKE ENERGY OCONEE NUCLEAR SITE SUPPORTING PLANS State of South Carolina Oconee County Pickens County DOE-IRAP Plan INPO-Fixed Facility Agreement NRC Region II P-18 Rev. 2017-003 September 2017