RA-16-001, Special Report for Inoperability of the Turbine Building High Range Radioactive Noble Gas Monitor

From kanterella
(Redirected from RA-16-001)
Jump to navigation Jump to search
Special Report for Inoperability of the Turbine Building High Range Radioactive Noble Gas Monitor
ML16043A356
Person / Time
Site: Oyster Creek
Issue date: 01/15/2016
From: Stathes G
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA-16-001
Download: ML16043A356 (3)


Text

AExe[ Gene~': at on 10 CFR 50.4 Technical Specif*ctin 3.13.14.2 and 6.9.3.n January 15, 2016 RA-18-001 U.S. Nuclear Regulatory Commission Attn: Document Control Desk wasigo, DC 20555.0001 Oyster Creek Nuclear Generating Station (OCNOS)

Renewed Facility Operating License No. DPR-16 NRCG Dqoke No. 50-219 Su~c: Special Report for Iroperabiity of the Turin Buln High Range RdocieNoble Gas Monitor On December 9,*2015, ait 1114 hotn,;Operaton entered=a lne seven-day Technca.Se, lcato (T*s) Liiin odiinof Oprto (LCO) for the Turbine BuligHig RPn. Rdoe cti Noble Gas Moior Systm (RAGeMS) High Rang.

RdotveNoble Gas2f EtuentMon~to being declaed inoperablefor the performance of surveillance 621.3.034 Turbine Buldn RAGEMS S ad Effluent Flow,-

ampl RAGEMS flow meter, FT-66t-I060, could not be calxibrtd to meet the as left acetnec*ei of the 621.3.034 suvilac. Copnstr acin were In'traement in acodac wit the Statio Olffei Dose Caclto Manua.re QONGS Tecnia Spcfcto (TS) 3.13.14, High-Range Raiatv NobleGa Effluent Monitor, acio statement 3.13.H4.2 requires either retrn the inop~erable channl to operable staltus within seven days of the event or prepare and sumi a special report per adrn~srative .TS6,9:3.n wihi 30 days following the event outlining The send .LCD expired on Deeiie 16,2015, itou the Turbine Building RAGEMS bein retoe to operable statu; th*erfoe, thi 30-day spca report is bein submitted per TS 6.9.3.n. The reqie inomto is cotie Inthe attahmn to this

RA- 16-001 P~ge 2 of 2 if any further information or assistance is needed, *please contact Matt Nixon at, 609.971.4005. :,*..

Sincerely',

Vice President. .. *...

Oyster Creek Nuclear Generating Station' Attachment '

cc: USNRC Administrator, U.S. NRC Region I USNRC Senior Project Manager, Oyster Creek SUSNRC Senior Resident Inspector, Oyster Creek

Attachmenit to RA-1O-OO1 Technical Turbine Specification Building High 6.9.3.n Range Special Report Radioactive for lnoperability Noble Gas Monitor Qf

  • Cause of lno Derabilitv The Turbine Building RAGEMS was declared inoperable at 1114 hours0.0129 days <br />0.309 hours <br />0.00184 weeks <br />4.23877e-4 months <br /> on December 9, 2015, in order to perform surveillance testing system per procedure 621.3.034. During performance of procedure 621.3.034, l&C technicians reported that the FT-661 -1060 Flow-Transmitter could not be calibrated to meet the as leftacceptance criteria of the surveillanc procedure. Accordingly, the Turbine Building RAGEMS was declared inoperable and the compensatory measures were established in accordance with the Station Offsite Dose Calculation Mvanual on December 16, 2016 at 1114.

Action Tak~en Troubleshooting conf irmed the degraded flow transmitter and identified that a replacement wifflbe required.

The TB RAGEMS remains inoperable while awaiting the arrival of the replacement transmitter. The work order Instruction has been planned and the Instrument &Controls Department will complete the component replacement using the "RPx It Now" process. It is currently being tracked as an "*Operations Department Concern" to ensure that the issue remains a Station priority. Repairs are expected to be completed by January 19, 2010.

44.

AExe[ Gene~': at on 10 CFR 50.4 Technical Specif*ctin 3.13.14.2 and 6.9.3.n January 15, 2016 RA-18-001 U.S. Nuclear Regulatory Commission Attn: Document Control Desk wasigo, DC 20555.0001 Oyster Creek Nuclear Generating Station (OCNOS)

Renewed Facility Operating License No. DPR-16 NRCG Dqoke No. 50-219 Su~c: Special Report for Iroperabiity of the Turin Buln High Range RdocieNoble Gas Monitor On December 9,*2015, ait 1114 hotn,;Operaton entered=a lne seven-day Technca.Se, lcato (T*s) Liiin odiinof Oprto (LCO) for the Turbine BuligHig RPn. Rdoe cti Noble Gas Moior Systm (RAGeMS) High Rang.

RdotveNoble Gas2f EtuentMon~to being declaed inoperablefor the performance of surveillance 621.3.034 Turbine Buldn RAGEMS S ad Effluent Flow,-

ampl RAGEMS flow meter, FT-66t-I060, could not be calxibrtd to meet the as left acetnec*ei of the 621.3.034 suvilac. Copnstr acin were In'traement in acodac wit the Statio Olffei Dose Caclto Manua.re QONGS Tecnia Spcfcto (TS) 3.13.14, High-Range Raiatv NobleGa Effluent Monitor, acio statement 3.13.H4.2 requires either retrn the inop~erable channl to operable staltus within seven days of the event or prepare and sumi a special report per adrn~srative .TS6,9:3.n wihi 30 days following the event outlining The send .LCD expired on Deeiie 16,2015, itou the Turbine Building RAGEMS bein retoe to operable statu; th*erfoe, thi 30-day spca report is bein submitted per TS 6.9.3.n. The reqie inomto is cotie Inthe attahmn to this

RA- 16-001 P~ge 2 of 2 if any further information or assistance is needed, *please contact Matt Nixon at, 609.971.4005. :,*..

Sincerely',

Vice President. .. *...

Oyster Creek Nuclear Generating Station' Attachment '

cc: USNRC Administrator, U.S. NRC Region I USNRC Senior Project Manager, Oyster Creek SUSNRC Senior Resident Inspector, Oyster Creek

Attachmenit to RA-1O-OO1 Technical Turbine Specification Building High 6.9.3.n Range Special Report Radioactive for lnoperability Noble Gas Monitor Qf

  • Cause of lno Derabilitv The Turbine Building RAGEMS was declared inoperable at 1114 hours0.0129 days <br />0.309 hours <br />0.00184 weeks <br />4.23877e-4 months <br /> on December 9, 2015, in order to perform surveillance testing system per procedure 621.3.034. During performance of procedure 621.3.034, l&C technicians reported that the FT-661 -1060 Flow-Transmitter could not be calibrated to meet the as leftacceptance criteria of the surveillanc procedure. Accordingly, the Turbine Building RAGEMS was declared inoperable and the compensatory measures were established in accordance with the Station Offsite Dose Calculation Mvanual on December 16, 2016 at 1114.

Action Tak~en Troubleshooting conf irmed the degraded flow transmitter and identified that a replacement wifflbe required.

The TB RAGEMS remains inoperable while awaiting the arrival of the replacement transmitter. The work order Instruction has been planned and the Instrument &Controls Department will complete the component replacement using the "RPx It Now" process. It is currently being tracked as an "*Operations Department Concern" to ensure that the issue remains a Station priority. Repairs are expected to be completed by January 19, 2010.