MONTHYEARML24214A2302024-07-0808 July 2024 News Release-III-24-020: NRC to Discuss 2023 Performance of Point Beach Nuclear Power Plant ML24047A3072023-07-0505 July 2023 News Release-III-23-018: NRC to Conduct Open House to Discuss 2022 Performance of Point Beach Nuclear Plant ML23052A1062023-02-0101 February 2023 News Release-III-23-003: NRC Names New Senior Resident Inspector at Dresden Nuclear Power Plant ML22199A0632022-06-16016 June 2022 News Release-III-22-017: NRC to Conduct Open House to Discuss 2021 Performance of Point Beach Nuclear Power Plant Press Release-21-047, NRC Seeks Public Comment on Draft Environmental Impact Statement for Point Beach Subsequent License Renewal2021-11-0909 November 2021 Press Release-21-047: NRC Seeks Public Comment on Draft Environmental Impact Statement for Point Beach Subsequent License Renewal Press Release-III-21-009, NRC to Hold Virtual Meeting to Discuss 2020 Performance of Point Beach Nuclear Power Plant2021-06-0303 June 2021 Press Release-III-21-009: NRC to Hold Virtual Meeting to Discuss 2020 Performance of Point Beach Nuclear Power Plant ML21209A5102021-06-0101 June 2021 News Release-21-020: NRC Atomic Safety and Licensing Board to Hold Oral Argument on Point Beach Subsequent License Renewal Press Release-III-21-003, NRC Names New Resident Inspector at Point Beach Nuclear Power Plant2021-02-23023 February 2021 Press Release-III-21-003: NRC Names New Resident Inspector at Point Beach Nuclear Power Plant ML21209A4962021-02-0303 February 2021 News Release-21-006: NRC to Seek Comment on Environmental Review Topics for Point Beach Subsequent License Renewal Press Release-20-059, NRC Makes Point Beach Subsequent License Renewal Application Available for Public Inspection2020-12-0808 December 2020 Press Release-20-059: NRC Makes Point Beach Subsequent License Renewal Application Available for Public Inspection Press Release-III-20-010, NRC to Hold Virtual Meeting to Discuss 2019 Performance of Duane Arnold and Point Beach Nuclear Power Plants2020-07-24024 July 2020 Press Release-III-20-010: NRC to Hold Virtual Meeting to Discuss 2019 Performance of Duane Arnold and Point Beach Nuclear Power Plants Press Release-III-19-005, NRC to Hold Open House to Discuss 2018 Performance of Point Beach Nuclear Plant2019-03-26026 March 2019 Press Release-III-19-005: NRC to Hold Open House to Discuss 2018 Performance of Point Beach Nuclear Plant Press Release-III-18-012, NRC to Conduct Open House to Discuss 2017 Performance of Point Beach Nuclear Power Plant2018-04-0303 April 2018 Press Release-III-18-012: NRC to Conduct Open House to Discuss 2017 Performance of Point Beach Nuclear Power Plant Press Release-III-17-018, NRC to Conduct Open House to Discuss 2016 Performance of Point Beach Nuclear Power Plant2017-06-29029 June 2017 Press Release-III-17-018: NRC to Conduct Open House to Discuss 2016 Performance of Point Beach Nuclear Power Plant Press Release-III-17-014, NRC Names New Senior Resident Inspector at Point Beach Nuclear Plant2017-06-26026 June 2017 Press Release-III-17-014: NRC Names New Senior Resident Inspector at Point Beach Nuclear Plant Press Release-III-16-009, NRC to Hold Open House to Discuss Agency'S Assessment of Point Beach Nuclear Plant2016-05-12012 May 2016 Press Release-III-16-009: NRC to Hold Open House to Discuss Agency'S Assessment of Point Beach Nuclear Plant Press Release-III-15-010, NRC Schedules Meeting April 20 to Discuss Point Beach Nuclear Power Plant2015-04-13013 April 2015 Press Release-III-15-010: NRC Schedules Meeting April 20 to Discuss Point Beach Nuclear Power Plant Press Release-III-14-028, NRC Names New Senior Resident Inspector at Point Beach Nuclear Station2014-07-11011 July 2014 Press Release-III-14-028: NRC Names New Senior Resident Inspector at Point Beach Nuclear Station Press Release-III-14-012, NRC Schedules Public Meeting April 8 to Discuss Performance of Point Beach Nuclear Power Plant2014-03-28028 March 2014 Press Release-III-14-012: NRC Schedules Public Meeting April 8 to Discuss Performance of Point Beach Nuclear Power Plant Press Release-14-016, NRC Issues Annual Assessments for Nation'S Nuclear Plants2014-03-0606 March 2014 Press Release-14-016: NRC Issues Annual Assessments for Nation'S Nuclear Plants Press Release-III-13-043, NRC Names New Resident Inspector at Point Beach Nuclear Station2013-11-0808 November 2013 Press Release-III-13-043: NRC Names New Resident Inspector at Point Beach Nuclear Station Press Release-13-073, NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants2013-09-0606 September 2013 Press Release-13-073: NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants Press Release-III-13-034, NRC Increases Oversight of Point Beach for Flooding Protection Violation2013-08-0909 August 2013 Press Release-III-13-034: NRC Increases Oversight of Point Beach for Flooding Protection Violation Press Release-III-13-028, NRC Schedules Regulatory Conference to Discuss Apparent Violation at Point Beach Nuclear Plant2013-07-16016 July 2013 Press Release-III-13-028: NRC Schedules Regulatory Conference to Discuss Apparent Violation at Point Beach Nuclear Plant Press Release-III-13-023, NRC Schedules Open House June 26 to Discuss Performance of Point Beach Nuclear Plant2013-06-19019 June 2013 Press Release-III-13-023: NRC Schedules Open House June 26 to Discuss Performance of Point Beach Nuclear Plant Press Release-III-12-031, NRC Schedules July 26 Open House to Discuss Point Beach Nuclear Power Plant Performance and NRC Oversight2012-07-19019 July 2012 Press Release-III-12-031: NRC Schedules July 26 Open House to Discuss Point Beach Nuclear Power Plant Performance and NRC Oversight Press Release-III-12-017, NRC Responded to Alert at Point Beach Nuclear Power Plant2012-04-25025 April 2012 Press Release-III-12-017: NRC Responded to Alert at Point Beach Nuclear Power Plant Press Release-III-11-026, NRC Names New Resident Inspector at Point Beach Nuclear Plant2011-07-19019 July 2011 Press Release-III-11-026: NRC Names New Resident Inspector at Point Beach Nuclear Plant Press Release-III-11-018, NRC Schedules Public Meeting for May 25 to Discuss Point Beach Nuclear Plant Performance and NRC Oversight2011-05-13013 May 2011 Press Release-III-11-018: NRC Schedules Public Meeting for May 25 to Discuss Point Beach Nuclear Plant Performance and NRC Oversight Press Release-11-075, NRC Approves Increased Power Output for Point Beach Nuclear Power Plant2011-05-0303 May 2011 Press Release-11-075: NRC Approves Increased Power Output for Point Beach Nuclear Power Plant Press Release-11-035, NRC Advisory Committee on Reactor Safeguards to Meet March 10-12 in Rockville, MD2011-03-0303 March 2011 Press Release-11-035: NRC Advisory Committee on Reactor Safeguards to Meet March 10-12 in Rockville, MD Press Release-III-10-011, NRC to Discuss 2009 Performance Assessment for Point Beach Nuclear Power Plant April 222010-04-15015 April 2010 Press Release-III-10-011: NRC to Discuss 2009 Performance Assessment for Point Beach Nuclear Power Plant April 22 Press Release-III-10-002, NRC Names New Resident Inspector at Point Beach Nuclear Power Plant2010-01-20020 January 2010 Press Release-III-10-002: NRC Names New Resident Inspector at Point Beach Nuclear Power Plant Press Release-I-09-042, NRC Names New Resident Inspector at Peach Bottom Atomic Power Station2009-10-15015 October 2009 Press Release-I-09-042: NRC Names New Resident Inspector at Peach Bottom Atomic Power Station Press Release-III-09-011, NRC to Discuss 2008 Performance Assessment for Point Beach Nuclear Power Plant April 292009-04-22022 April 2009 Press Release-III-09-011: NRC to Discuss 2008 Performance Assessment for Point Beach Nuclear Power Plant April 29 Press Release-III-08-028, NRC to Discuss 2007 Performance Assessment for Point Beach Nuclear Plant2008-07-14014 July 2008 Press Release-III-08-028: NRC to Discuss 2007 Performance Assessment for Point Beach Nuclear Plant Press Release-III-08-001, NRC Begins Special Inspection of Electrical Problems at the Point Beach Nuclear Plant2008-01-22022 January 2008 Press Release-III-08-001: NRC Begins Special Inspection of Electrical Problems at the Point Beach Nuclear Plant Press Release-07-095, - NRC Staff Approves Transfer of Point Beach Operating License2007-07-31031 July 2007 Press Release-07-095 - NRC Staff Approves Transfer of Point Beach Operating License Press Release-III-07-021, - NRC Begins Special Inspection of Pump Issue at the Point Beach Plant2007-06-18018 June 2007 Press Release-III-07-021 - NRC Begins Special Inspection of Pump Issue at the Point Beach Plant Press Release-III-07-006, NRC to Discuss 2006 Performance Assessment for Point Beach Nuclear Power Plant2007-03-23023 March 2007 Press Release-III-07-006: NRC to Discuss 2006 Performance Assessment for Point Beach Nuclear Power Plant Press Release-III-07-001, NRC Issues Confirmatory Order in Employment Discrimination Case at Point Beach Nuclear Plant2007-01-0505 January 2007 Press Release-III-07-001: NRC Issues Confirmatory Order in Employment Discrimination Case at Point Beach Nuclear Plant Press Release-III-06-033, NRC Returns Point Beach to Routine Oversight2006-12-0404 December 2006 Press Release-III-06-033: NRC Returns Point Beach to Routine Oversight Press Release-III-06-009, NRC to Discuss 2004 Performance Assessment and Review Safety Culture Survey for Point Beach Nuclear Power Plant2006-03-15015 March 2006 Press Release-III-06-009: NRC to Discuss 2004 Performance Assessment and Review Safety Culture Survey for Point Beach Nuclear Power Plant Press Release-05-167, NRC Renews Point Beach Nuclear Plant Operating Licenses for an Additional 20 Years2005-12-22022 December 2005 Press Release-05-167: NRC Renews Point Beach Nuclear Plant Operating Licenses for an Additional 20 Years Press Release-III-05-046, NRC Proposes $60,000 Fine Against Point Beach Nuclear Plant for Failure to Provide Complete and Accurate Information2005-12-19019 December 2005 Press Release-III-05-046: NRC Proposes $60,000 Fine Against Point Beach Nuclear Plant for Failure to Provide Complete and Accurate Information Press Release-05-110, NRC Finds No Significant Environmental Impacts from Extended Operation of Point Beach Nuclear Plant, Units 1 and 22005-08-16016 August 2005 Press Release-05-110: NRC Finds No Significant Environmental Impacts from Extended Operation of Point Beach Nuclear Plant, Units 1 and 2 Press Release-05-084, NRC Advisory Committee on Reactor Safeguards to Meet June 1-3 in Rockville, Maryland2005-05-25025 May 2005 Press Release-05-084: NRC Advisory Committee on Reactor Safeguards to Meet June 1-3 in Rockville, Maryland Press Release-III-05-004, NRC Announces New Senior Resident Inspector at Point Beach Nuclear Power Station2005-02-0404 February 2005 Press Release-III-05-004: NRC Announces New Senior Resident Inspector at Point Beach Nuclear Power Station Press Release-III-04-026, NRC Issues Letter on Performance Improvement Plans for Point Beach Nuclear Power Station2004-04-23023 April 2004 Press Release-III-04-026: NRC Issues Letter on Performance Improvement Plans for Point Beach Nuclear Power Station Press Release-04-042, NRC Announces Opportunity for Hearing on Application to Renew Operating Licenses for Point Beach Nuclear Plant Units 1 and 22004-04-16016 April 2004 Press Release-04-042: NRC Announces Opportunity for Hearing on Application to Renew Operating Licenses for Point Beach Nuclear Plant Units 1 and 2 2024-07-08
[Table view] |
Text
NRC NEWS U.S. NUCLEAR REGULATORY COMMISSION 801 Warrenville Road Lisle IL 60532 Web Site: http://www.nrc.gov E-mail: opa3@nrc.gov No. III-03-052 July 28, 2003 CONTACT: Jan Strasma (630) 829-9663 Viktoria Mitlyng (630) 829-9662 NRC SPECIAL INSPECTION BEGINS JULY 28 AT POINT BEACH A special Nuclear Regulatory Commission inspection begins Monday, July 28, to review performance at the Point Beach Nuclear Plant and continues through September. The two-reactor facility, operated by the Nuclear Management Company, is near Two Rivers, Wisconsin.
The special inspection results from the NRCs determination that the possible failure of an auxiliary cooling water system was of high safety significance. Normal plant operations were not affected by the problem, which was initially discovered by plant personnel in 2001 and subsequently corrected. Another aspect of the inspection stems from problems with the utilitys emergency preparedness program to deal with possible emergencies at the plant.
The inspection team will be headed by Anton Vegel, the NRC branch chief responsible for overseeing the inspection program for Point Beach. Because of the performance problems at Point Beach, the NRCs Region III Office has established a separate branch to monitor the plant.
The special inspection will have three focuses, each involving two weeks of onsite inspection:
(1) the corrective action program - how the utility finds and corrects problems; (2) the emergency preparedness program - how the utility would respond to an emergency at the plant; and (3) a broad review of the plants engineering, operations, and maintenance programs.
The corrective action inspection begins Monday, July 28; the emergency preparedness inspection will start August 4; and the engineering, operations, and maintenance inspection will be conducted during the weeks of September 8 and September 22.
The inspection team will discuss the progress of the inspection at a public meeting in late August in Manitowoc, Wisconsin. A second public meeting after the conclusion of the inspection is planned for mid-October. Dates, locations and other details of the meetings will be announced later.
The report of the teams findings will be publicly available from the Region III Office of Public Affairs and on the NRCs web site: http://www.nrc.gov/reading-rm/adams/web-based.html - use Docket Number 05000266 to locate the document. The report is expected to be issued in November.
Assistance in using the web reading room is available by calling the NRC Public Document Room at 800-397-4209.
Even though the utility discovered the problem with the auxiliary cooling water system, which led to the inspection, and took prompt action to address the problem, the special inspection is intended to look more broadly at principal aspects of plant operations to see if there are other performance problems. The NRC Reactor Oversight Process calls for such an inspection when there are problems of high safety significance.
The auxiliary cooling water system is used to maintain the reactor in a safe condition if problems occur during plant operations and to continue removing heat from the reactor after a shutdown.
NRC inspection findings are evaluated using a four-level scale of safety significance, ranging from "green" for a finding of very low significance, through "white" and "yellow" to "red," for a finding of high safety significance. The 2001 auxiliary cooling water system problem was determined to be a red finding.