MONTHYEARPLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums PLA-8048, Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence2023-01-14014 January 2023 Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence PLA-8039, Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information2022-12-22022 December 2022 Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information PLA-8038, Notification of Petition for Bankruptcy (PLA-8038)2022-12-14014 December 2022 Notification of Petition for Bankruptcy (PLA-8038) PLA-8036, Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-80362022-11-30030 November 2022 Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-8036 PLA-8035, Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-80352022-11-0808 November 2022 Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-8035 PLA-8031, Emergency Plan Revision 66 (PLA-8031)2022-11-0707 November 2022 Emergency Plan Revision 66 (PLA-8031) PLA-8032, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments - Supplemental Information (PLA-8032)2022-10-28028 October 2022 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments - Supplemental Information (PLA-8032) PLA-8026, Biennial 10 Crf 50.59 and 72.48 Summary Report and Changes to Regulatory Commitment (PLA-8026)2022-10-19019 October 2022 Biennial 10 Crf 50.59 and 72.48 Summary Report and Changes to Regulatory Commitment (PLA-8026) PLA-8015, Application for Order Approving Indirect Transfer of Control of Licenses2022-09-29029 September 2022 Application for Order Approving Indirect Transfer of Control of Licenses PLA-8030, Evacuation Time Estimate Report PLA-80302022-09-15015 September 2022 Evacuation Time Estimate Report PLA-8030 PLA-8025, Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value2022-08-10010 August 2022 Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value PLA-8019, Nd Refueling Outage Owner'S Activity Report, PLA-80192022-07-13013 July 2022 Nd Refueling Outage Owner'S Activity Report, PLA-8019 PLA-8013, Response to Request for Additional Information Regarding License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-80132022-06-27027 June 2022 Response to Request for Additional Information Regarding License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-8013 PLA-8012, 10 CFR 50.46 Annual Report2022-06-10010 June 2022 10 CFR 50.46 Annual Report PLA-8005, Response to Request for Additional Information Regarding License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-8005)2022-05-23023 May 2022 Response to Request for Additional Information Regarding License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-8005) PLA-8001, Radiation Exposure Information and Reporting System - PLA-80012022-04-28028 April 2022 Radiation Exposure Information and Reporting System - PLA-8001 PLA-7987, Radioactive Effluent Release Report and Offsite Dose Calculation Manual - (PLA-7987)2022-04-26026 April 2022 Radioactive Effluent Release Report and Offsite Dose Calculation Manual - (PLA-7987) PLA-7986, 2021 Annual Environmental Operating Report (Nonradiological) Docket No. 50-387, PLA-79862022-04-26026 April 2022 2021 Annual Environmental Operating Report (Nonradiological) Docket No. 50-387, PLA-7986 PLA-7985, Annual Radiological Environmental Operating Report2022-04-22022 April 2022 Annual Radiological Environmental Operating Report PLA-7883, Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883)2022-03-31031 March 2022 Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883) PLA-7995, Property Insurance Program (PLA-7995)2022-03-30030 March 2022 Property Insurance Program (PLA-7995) PLA-7998, Submittal of Unit 1 Cycle 23 Core Operating Limits Report and Reload Safety Analysis Report2022-03-29029 March 2022 Submittal of Unit 1 Cycle 23 Core Operating Limits Report and Reload Safety Analysis Report PLA-7991, Proof of Financial Protection and Guarantee of Payment of Deferred Premium2022-03-24024 March 2022 Proof of Financial Protection and Guarantee of Payment of Deferred Premium PLA-7984, Supplement to License Amendment Requesting Adoption of TSTF-505, Revision 22022-03-0808 March 2022 Supplement to License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-7962, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-79622022-01-0505 January 2022 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-7962 2024-01-04
[Table view] Category:Technical Specifications
MONTHYEARPLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23195A1852023-07-27027 July 2023 Correction to Technical Specifications Page 3.3-73 in Amendment No. 265 ML23132A3212023-05-17017 May 2023 Associated Independent Spent Fuel Storage Installation - Issuance of Amendment Nos. 285 and 269 Related to Order Approving Transfer of Licenses ML23010A1082023-01-15015 January 2023 Issuance of Amendment No. 268 Change to Control Rod Technical Specifications PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence ML22294A1502022-11-17017 November 2022 Issuance of Amendment Nos. 284 and 267 Relocating Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program ML22146A2072022-07-15015 July 2022 Issuance of Amendment Nos. 281 and 264 Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR - NON-PROPRIETARY - ML22101A0282022-03-30030 March 2022 Revised Technical Specification Bases Unit 1 Manual ML20342A2372021-02-18018 February 2021 Issuance of Amendment Nos. 279 and 261 Revise Technical Specifications to Adopt TSTF-582, RPV WIC Enhancements ML20297A5642020-12-22022 December 2020 Issuance of Amendment Nos. 277 and 259 Revise Technical Specifications to Adopt TSTF-529, Revision 4, Clarify Use and Application Rules PLA-7866, Electric Station Proposed Amendment Licenses NPF-14 and - NPF-22: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules PLA-78662020-06-25025 June 2020 Electric Station Proposed Amendment Licenses NPF-14 and - NPF-22: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules PLA-7866 ML19248A8442020-01-17017 January 2020 Issuance of Amendment Nos. 275 and 257 Temporary Changes to Allow Replacement of Emergency Service Water System Piping ML19232A0692019-08-0808 August 2019 Technical Specification Bases Unit 2 Manual ML19232A0682019-08-0808 August 2019 Technical Specification Bases Manual ML19155A2642019-07-16016 July 2019 Issuance of Amendment Nos. 273 and 255 Adoption of TSTF-439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML19154A0602019-06-24024 June 2019 Issuance of Amendment Nos. 272 and 254 Technical Specifications to Adopt TSTF-501, Revision 1, Relocated Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML19052A0082019-03-0505 March 2019 Correction to Technical Specifications Page 3.3-45 (Unit 1) and Page 3.6-11 (Unit 2) for Administrative Errors Introduced During the Issuance of Amendment Nos. 271 and 253 ML18222A2032018-09-26026 September 2018 Issuance of Amendment Nos. 271 and 253 Revising Technical Specifications to Adopt TSTF-542, Revision 2 (CAC Nos. MG0269 and MG0270; EPID L-2017-LLA-0306) PLA-7733, Correction of Technical Specification Typographical Error for TS 3.6.4.1 (PLA-7733)2018-09-11011 September 2018 Correction of Technical Specification Typographical Error for TS 3.6.4.1 (PLA-7733) ML18017A2272017-12-15015 December 2017 Technical Specification Bases Manual ML18017A2282017-12-15015 December 2017 Technical Specifications Bases Manual ML17221A2892017-08-0909 August 2017 Draft TSTF-542-Variations ML17187A2972017-07-28028 July 2017 Susquehanna Steam Electric Station, Units 1 and 2 - Issuance of Amendments Revising Technical Specifications to Adopt TSTF-522, Revision 0 (CAC Nos. MF9154 and MF9155) PLA-7605, Change to Submittal Regarding License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-522-A2017-05-17017 May 2017 Change to Submittal Regarding License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-522-A ML17067A4442017-03-27027 March 2017 Issuance of Amendments Secondary Containment Access Openings ML16005A2342016-05-20020 May 2016 Issuance of Amendments Adoption of TSTF-425 ML16062A2162016-03-28028 March 2016 Issuance of Amendments Emergency Action Level Scheme Change PLA-7441, Supplemental Information on Technical Specification Changes to Adopt Traveler TSTF-4252016-01-29029 January 2016 Supplemental Information on Technical Specification Changes to Adopt Traveler TSTF-425 PLA-7406, Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-4252015-11-11011 November 2015 Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-425 ML15267A3812015-11-0202 November 2015 Issuance of Amendments Approval of Cyber Security Plan Milestone 8 ML15243A1402015-09-30030 September 2015 Issuance of Amendments Revisions to Technical Specification 3.4.10, Reactor Coolant System Pressure and Temperature (P/T) Limits PLA-7334, Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-4252015-07-0202 July 2015 Response to Request for Additional Information on Technical Specification Changes to Adopt Traveler TSTF-425 PLA-7299, Response to Request for Additional Information on Technical Specification Changes to RCS Pressure and Temperature (P/T) Limits2015-04-0606 April 2015 Response to Request for Additional Information on Technical Specification Changes to RCS Pressure and Temperature (P/T) Limits PLA-7119, PPL Susquehanna, LLC, Unit 1 & Unit 2 Proposed Technical Specification Amendment for Adoption of Task Force Traveler TSTF-425, Rev. 3, Relocate Surveillance Frequencies to Licensee Control Risk Informed Technical Specification Task Force...2014-10-27027 October 2014 PPL Susquehanna, LLC, Unit 1 & Unit 2 Proposed Technical Specification Amendment for Adoption of Task Force Traveler TSTF-425, Rev. 3, Relocate Surveillance Frequencies to Licensee Control Risk Informed Technical Specification Task Force... ML14316A6062014-10-27027 October 2014 PPL Susquehanna, LLC, Unit 1 & Unit 2 Proposed Technical Specification Amendment for Adoption of Task Force Traveler TSTF-425, Rev. 3, Relocate Surveillance Frequencies to Licensee Control Risk Informed Technical Specification Task Force... ML14111A0522014-05-14014 May 2014 Issuance of Amendments Regarding Change to Technical Specification Surveillance Requirement 3.5.1.12 ML14036A2572014-02-26026 February 2014 Issuance of Amendment Change to Allow Only One Manual Trip System to Be Operable for the Residual Heat Removal Shutdown Cooling System in Modes 4 and 5 ML14042A1152014-01-29029 January 2014 License Amendment Request - Increase of the Allowable Gas Treatment System Maximum Flow Rates from Secondary Containment ML13361A0872013-12-11011 December 2013 Revision 112 to Technical Specification Bases Manual PLA-6825, Proposed Amendment No. 310 to License NPF-14 and Proposed Amendment No. 282 to License NPF-22: Change to Tech Spec SR 3.8.1.9, 3.8.1.11, 3.8.1.12, and 3.8.1.19 to Increase Diesel Generator Minimum Steady State Voltage2012-09-18018 September 2012 Proposed Amendment No. 310 to License NPF-14 and Proposed Amendment No. 282 to License NPF-22: Change to Tech Spec SR 3.8.1.9, 3.8.1.11, 3.8.1.12, and 3.8.1.19 to Increase Diesel Generator Minimum Steady State Voltage ML11221A2712011-09-0808 September 2011 License Amendment, Issuance of Amendment Adoption of TSTF-514, Revision 3 ML11251A1532011-08-24024 August 2011 Technical Requirements Manual, Rev. 69 and Table of Contents, Rev. 20 ML11251A1522011-08-24024 August 2011 Revision 68 to Technical Requirements Manual PLA-6642, Proposed Amendment Nos. 307 & 278, Change to Technical Specification Surveillance Requirement (SR) 3.4.3.1 to Revise the Lower Surveillance Tolerances2010-11-10010 November 2010 Proposed Amendment Nos. 307 & 278, Change to Technical Specification Surveillance Requirement (SR) 3.4.3.1 to Revise the Lower Surveillance Tolerances ML1020103852010-07-12012 July 2010 Revision 100 to Technical Specifications Bases Unit 2 Manual ML1020104112010-07-12012 July 2010 Revisions to Technical Specification Bases Manual ML1012605332010-04-28028 April 2010 Technical Specification Bases Manual ML1011003942010-04-0606 April 2010 Technical Specifications Bases Unit 2 Manual, Rev. 98 ML0932901772009-11-24024 November 2009 Technical Specifications for Susquehanna Steam Electric Station, Unit 2 ML0929501102009-11-0909 November 2009 License Amendment, Changed Technical Specification Table 3.3.5.1-1 for ECCS Instrumentation for CST and Editorial Changes to TS 3.10.8.f 2023-07-27
[Table view] |
Text
Britt T. McKlnney PPL Susquehanna, LLC Sr. Vice President & Chief Nuclear Officer 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3149 Fax 570.542.1504 btmckinney@pplweb.com PP TM APR 0 7 2006 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop OP1-17 Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED AMENDMENT NO. 286 TO LICENSE NPF-14 &
PROPOSED AMENDMENT NO. 254 TO LICENSE NPF-22:
REVISION TO TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENTS 3.8.4.7 & SR 3.8.4.8 Docket Nos. 50-387 PLA-6 046 and 388 Referen ce: PLA-6014, G. T. Jones (PPL) to Document ControlDesk (USNRC),
"ProposedAmendment No. 286 to License NPF-14and ProposedAmendment No. 254 To License NPF-22:
Revision to Techinical Specification Surveillance Requirements 3.8.4.7 & SR 3.8.4.8," dated Febnrary28, 2006.
The purpose of this letter is to revise the amendment request proposed in Reference 1.
The amendment request proposed clarifications to the Technical Specification Surveillance Requirements 3.8.4.7 and 3.8.4.8. This revision is based on the teleconference held on April 5, 2006 between NRC and PPL Susquehanna, LLC.
The revision makes a change to the proposed Surveillance Requirement (SR) wording, as such; new TS markups are provided in Attachment 1. The revised wording has no impact on implementation of the Technical Specification requirements as originally proposed.
Corresponding Technical Specification Bases wording is provided in Attachment 2 for your information.
PPL has reviewed the "No Significant Hazards Consideration" and the "Environmental Consideration" submitted with Reference 1 relative to this supplemental information.
We have determined that there are no changes required to either of these documents.
74 OD (
Document Control De~k PLA-6046 Any questions regarding this request should be directed to Mr. Michael H. Crowthers at (610) 774-7766.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on: -
Britt T. McKinney Attachment 1: Revised Proposed Technical Specification Markups Attachment 2: Revised Technical Specification Bases Changes (Markups provided for information) cc: NRC Region I Mr. A. J. Blarney, NRC Sr. Resident Inspector Mr. R. V. Guzman, NRC Project Manager Mr. R. Janati, DEP/BRP
E Attachment 1 to PLA-6046 Revised Proposed Technical Specification Changes (Markups)
E
PPL. Rev.}F DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.8.4.6 Verify each required battery charger supplies its 24 months associated batteries at the following rates for 2 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />s:
- a. 2 100 amps for the 125V Battery at 2 127.8V
- b. Ž 300 amps for the 250V Battery at 2 255.6V
- c. Ž 200 amps for the 125V Diesel Generator E Battery at 2 127.8V SR 3.8.4.7 --------------------------------- NOTES---------------------------------
- 1. The modified performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7 once per 60 months.
- 2. This Surveillance shall not be Performed in Mode 1, 2, or
-- 7-------------------------------------------__
Verify battery capacity is adequate to supply, and maintain 24 months in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.
(continued) 5e.-
SU'SQUEHANNA - UNIT 1 -1'/3.8-26 Amendme~nt J5
PPL. Rev./,
DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued) T SURVEILLANCE FREQUENCY SR 3.8.4.8 I---------__________________
This Surveillance shall not be Performed in Mode 1, 2, or,.
Verify battery capacity is 2 80% of the manufacturer's 60 months rating when subjected to a performance discharge test or a modified performance discharge test. AND 12 months when battery shows degradation or has reached 85%vo of expected service life with capacity
< 100% of manufacturer's rating AND 24 months when battery has reached 85% of the expected service life with capacity 2 100% of manufacturer's rating SUSQUEHANNA - UNIT 1 75/3.8-27 AmendME~nt J,;
PPL. Rev. ,
81 DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY KIAtCrr-r SR 3.8.4.7 J lvi)---------------------
I t------------------______-
- 1. The modified performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7 once per 60 months.
- 2. This Surveillance shall not be Performed in MODE 1, 2or
(/ Verify battery capacity is adequate to supply, and maintain in OPERABLE status, the required 24 months emergency loads for the design duty cycle when subjected to a battery service test.
(continued)
SU'SQUEHANNA - UNIT 2 5 / 3.8-30 AmendmentX)8
PPI Rev.,W WW DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.8.4.8 ---------------------------- NOTE----------------------------
This Surveillance shall not be Performed in MODE 1, 2, or 3.
Verify battery capacity is 2 80% of the 60 months manufacturer's rating when subjected to a performance discharge test or a modified performance discharge test.
AND SC I 12 months when battery shows degradation or has reached 85% of expected service life with capacity
< 100% of manufacturer's rating AND 24 months when battery has reached 85% of the expected service life with capacity 2 100% of manufacturer's rating (continued)
SU',QUEHANNA - UNIT 2 rS / 3.8-31 Amendment .iW
Insert except for the Diesel Generator E DC electrical power subsystem. This Surveillance can be performed on the Diesel Generator E DC electrical power subsystem when the Diesel Generator E is not aligned to the Class IE distribution system.
ft E
Attachment 2 to PLA-6046 Revised Technical Specification Bases Changes (Markups provided for information)
E
TS Bases insert Since the Diesel Generator E DC electrical power subsystem does not support loads other than the Diesel Generator E required loads, the mode restriction note need not be applied to the Diesel Generator E subsystem unless it is aligned to the class lE distribution subsystem. The note does have applicability to the Diesel Generator E subsystem when the Diesel Generator E is substituted for one of the other Diesel Generators. When the Diesel Generator E is aligned to the class lE distribution subsystem, the Diesel Generator E subsystem is required to support operability of the Diesel Generator E. Thus when in this configuration, the note does need to be applicable since performing the Surveillance would remove a required DC electrical power subsystem from service.