Tech Spec Page for Amendments 235 and 212 Revision to Technical Specification Surveillance Requirements 3.8.4.7 and 3.8.4.8
ML061510375
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 05/30/2006
From:
Plant Licensing Branch III-2
To:
References
TAC MC0255, TAC MD0254
Download: ML061510375 (1)


Text

(4) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level PPL Susquehanna, LLC is authorized to operate the facility at reactor core power levels not in excess of 3489 megawatts thermal in accordance with the conditions specified herein and in Attachment 1 to this license. The preoperational tests, startup tests and other items identified in Attachment 1 to this license shall be completed as specified. Attachment 1 is hereby incorporated into this license.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 235, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. PPL Susquehanna, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

For Surveillance Requirements (SRs) that are new in Amendment 178 to Facility Operating License No. NPF-1 4, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 178. For SRs that existed prior to Amendment 178, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 178.

(3) Conduct of Work Activities During Fuel Load and Initial Startup The operating licensee shall review by committee all facility construction, Preoperational Testing, and System Demonstration activities performed concurrently with facility initial fuel loading or with the facility Startup Test Amendment No. 5, +43, +78, +18, +88, 94, 235

PPL Rev. 1 DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)-

SURVEILLANCE FREQUENCY SR 3.8.4.6 Verify each required battery charger supplies its 24 months associated batteries at the following rates for 2 4 hours0.167 days <br />0.0238 weeks <br />0.00548 months <br />:

a. 2 100 amps for the 125V Battery at Ž 127.8V
b. 2 300 amps for the 250V Battery at 2 255.6V
c. > 200 amps for the 125V Diesel Generator E Battery at > 127.8V SR 3.8.4.7 - ------------------- NOTES---------------------------------
1. The modified performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7 once per 60 months.
2. This Surveillance shall not be Performed in Mode 1, 2, or 3 except for the Diesel Generator E DC electrical power subsystem. This Surveillance can be performed on the Diesel Generator E DC electrical power subsystem when the Diesel Generator E is not aligned to the Class 1E distribution system.

Verify battery capacity is adequate to supply, and maintain 24 months in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.

(continued)

SUSQUEHANNA -UNIT 1 TS / 3.8-26 Amendment 118, 235

PPL Rev. 1 DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.4.8 ------------------- NOTE - -------------- ---

This Surveillance shall not be Performed in Mode 1, 2, or 3 except for the Diesel Generator E DC electrical power subsystem. This Surveillance can be performed on the Diesel Generator E DC electrical power subsystem when the Diesel Generator E is not aligned to the Class 1E distribution system.

Verify battery capacity is 2 80% of the manufacturer's 60 months rating when subjected to a performance discharge test or a modified performance discharge test. AND 12 months when battery shows degradation or has reached 85% of expected service life with capacity

< 100% of manufacturer's rating AND 24 months when battery has reached 85% of the expected service life with capacity

> 100% of manufacturers rating SUSQUEHANNA - UNIT 1 TS / 3.8-27 Amendment 1lA, 235

(4) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level PPL Susquehanna, LLC is authorized to operate the facility at reactor core power levels not in excess of 3489 megawatts thermal (100% power) in accordance with the conditions specified herein and in Attachment 1 to this license. The preoperational test, startup tests and other items identified in Attachment 1 to this license shall be completed as specified. Attachment 1 is hereby incorporated into this license.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 212, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. PPL Susquehanna, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

For Surveillance Requirements (SRs) that are new in Amendment 151 to Facility Operating License No. NPF-22, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 151. For SRs that existed prior to Amendment 151, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 151.

2.C.(3) PPL Susquehanna, LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Fire Protection Review Report for the facility and as approved in Fire Protection Program, Section 9.5, SER, SSER#1, SSER#2, SSER#3, SSER#4, SSER#6, Safety Evaluation of Fire Protection Report dated August 9, 1989, Safety Evaluation Amendment No. +, E, e03, 49, 45+, +5, +6, +69, 212

PPL Rev. 1 DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY

+

SR 3.8.4.7 ----- --------- -t--------- - ----------------

1. The modified performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR &8.4.7 once per 60 months.
2. This Surveillance shall not be Performed in MODE 1, 2 or 3 except for the Diesel Generator E DC electrical power subsystem.

This Surveillance can be performed on the Diesel Generator E DC electrical power subsystem when the Diesel Generator E is not aligned to the Class I E distribution system.

Verify battery capacity is adequate to supply, and 24 months maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.

(continued)

SUSQUEHANNA - UNIT 2 TS / 3.8-30 Amendment 15/,

212

PPL Rev. 1 DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY K I.-,TA SR 3.8.4.8 . _

Il. I--

- -------U This Surveillance shall not be Performed in MODE 1, 2, or 3 except for the Diesel Generator E DC electrical power subsystem. This Surveillance can be performed on the Diesel Generator E DC electrical power subsystem when the Diesel Generator E is not aligned to the Class 1E distribution system.

Verify battery capacity is 2 80% of the 60 months manufacturer's rating when subjected to a performance discharge test or a modified performance discharge test.

AND 12 months when battery shows degradation or has reached 85% of expected service life with capacity

< 100% of manufacturer's rating AND 24 months when battery has reached 85% of the expected service life with capacity > 100% of manufacturers rating (continued)

SUSQUEHANNA - UNIT 2 TS / 3.8-31 Amendment 15i, 212