Charles R. Pierce Southern Nuclear Regulatory Affairs Director Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, AL 35201 Tel 205.992.7872 SOUTHERN << \

Fax 205.992.7601 NUCLEAR A SOUTHERN COMPANY March 28, 2016 Docket Nos.: 50-321 50-348 50-424 NL-16-0457 50-366 50-364 50-425 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I Hatch Nuclear Plant- Units 1 and 2 Joseph M. Farley Nuclear Plant- Units 1 and 2 Vogtle Electric Generating Plant- Units 1 and 2 Nuclear Property Insurance Coverage as of April1. 2016 Ladies and Gentlemen:

In accordance with the nuclear property insurance reporting requirement specified in 10 CFR 50.54(w)(3), the current levels and sources of insurance on Edwin I.

Hatch Nuclear Plant, Joseph M. Farley Nuclear Plant, and Vogtle Electric Generating Plant are hereby submitted.

The policies held by Alabama Power Company and Georgia Power Company (including the co-owner licensees as the insured), respectively, are:

Primary Coverage Insurance Nuclear Electric Insurance $1,500,000,000 Ltd. - NEIL Primary Property Policy No.: Farley: P16-001, Hatch: P16-023, Vogtle: P16-024 Excess Coverage Insurance Nuclear Electric Insurance $1 ,250,000,000 excess Ltd.- NEIL Excess Property of $1 ,500,000,000 (Note 1)

Policy No.: Farley: X16-001, Hatch: X16-018, Vogtle: X16-074 Note 1: The excess property insurance limits shown are for property damage following a nuclear incident.

Excess Non-Nuclear Property Insurance Nuclear Electric Insurance $750,000,000 excess Ltd.- NEIL Excess Property of $1,500,000,000 (Note 2}

Policy No.: Farley: NSIC16-001, Hatch: NSIC16-023, Vogtle: NSIC16-024 (Note 3)

U.S. Nuclear Regulatory Commission NL-16-0457 Page2 Note 2: The excess non-nuclear property insurance limits shown are for property damage following a non-nuclear incident.

Note 3: Please note that the SNC Nuclear Property Insurance Coverage letter for 2015, SNC letter NL-15-0604, dated March 26, 2015 (ADAMS Accession No. ML15152A214) incorrectly listed the Hatch Policy No. as NSIC15-018 and the Vogtle Policy No. as NSIC15-074. These should have stated NSIC15-023 and NSIC15-024, respectively.

The policies listed above provide a total nuclear property coverage limit of

$2,750,000,000 ($2,250,000,000 for a non-nuclear event) for each site. In either case, this exceeds $1 ,060,000,000, which is the minimum amount of property insurance required by 10 CFR 50.54.

This letter contains no NRC commitments. If you have any questions, please contact Ken McElroy at (205) 992-7369.

Respectfully submitted, C. fl.~

C. R. Pierce Regulatory Affairs Director CRP/RMJ cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bost, Executive Vice President & Chief Nuclear Officer Ms. C. A. Gayheart, Vice President - Farley Mr. D. R. Vineyard, Vice President- Hatch Mr. D. R. Madison, Vice President- Fleet Operations Mr. B. K. Taber, Vice President- Vogtle 1 & 2 Mr. M.D. Meier, Vice President- Regulatory Affairs Mr. B. J. Adams, Vice President- Engineering Ms. B. L. Taylor, Regulatory Affairs Manager- Farley Mr. G. L. Johnson, Regulatory Affairs Manager- Hatch Mr. G. W. Gunn, Regulatory Affairs Manager- Vogtle 1 & 2 RType: Farley=CFA04.054; Hatch=CHA02.004; Vogtle=CVC7000 U.S. Nuclear Regulatory Commission Ms. C. Haney, Regional Administrator Mr. S. A. Williams, NRR Project Manager- Farley Mr. D. H. Hardage, Senior Resident Inspector- Hatch Mr. W. D. Deschaine, Senior Resident Inspector- Vogtle 1 & 2 Mr. A. M. Alen, Resident Inspector- Vogtle 1 & 2 Mr. P. K. Niebaum, Senior Resident Inspector- Farley Mr. R. E. Martin, NRR Project Manager- Vogtle 1 & 2

Charles R. Pierce Southern Nuclear Regulatory Affairs Director Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, AL 35201 Tel 205.992.7872 SOUTHERN << \

Fax 205.992.7601 NUCLEAR A SOUTHERN COMPANY March 28, 2016 Docket Nos.: 50-321 50-348 50-424 NL-16-0457 50-366 50-364 50-425 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I Hatch Nuclear Plant- Units 1 and 2 Joseph M. Farley Nuclear Plant- Units 1 and 2 Vogtle Electric Generating Plant- Units 1 and 2 Nuclear Property Insurance Coverage as of April1. 2016 Ladies and Gentlemen:

In accordance with the nuclear property insurance reporting requirement specified in 10 CFR 50.54(w)(3), the current levels and sources of insurance on Edwin I.

Hatch Nuclear Plant, Joseph M. Farley Nuclear Plant, and Vogtle Electric Generating Plant are hereby submitted.

The policies held by Alabama Power Company and Georgia Power Company (including the co-owner licensees as the insured), respectively, are:

Primary Coverage Insurance Nuclear Electric Insurance $1,500,000,000 Ltd. - NEIL Primary Property Policy No.: Farley: P16-001, Hatch: P16-023, Vogtle: P16-024 Excess Coverage Insurance Nuclear Electric Insurance $1 ,250,000,000 excess Ltd.- NEIL Excess Property of $1 ,500,000,000 (Note 1)

Policy No.: Farley: X16-001, Hatch: X16-018, Vogtle: X16-074 Note 1: The excess property insurance limits shown are for property damage following a nuclear incident.

Excess Non-Nuclear Property Insurance Nuclear Electric Insurance $750,000,000 excess Ltd.- NEIL Excess Property of $1,500,000,000 (Note 2}

Policy No.: Farley: NSIC16-001, Hatch: NSIC16-023, Vogtle: NSIC16-024 (Note 3)

U.S. Nuclear Regulatory Commission NL-16-0457 Page2 Note 2: The excess non-nuclear property insurance limits shown are for property damage following a non-nuclear incident.

Note 3: Please note that the SNC Nuclear Property Insurance Coverage letter for 2015, SNC letter NL-15-0604, dated March 26, 2015 (ADAMS Accession No. ML15152A214) incorrectly listed the Hatch Policy No. as NSIC15-018 and the Vogtle Policy No. as NSIC15-074. These should have stated NSIC15-023 and NSIC15-024, respectively.

The policies listed above provide a total nuclear property coverage limit of

$2,750,000,000 ($2,250,000,000 for a non-nuclear event) for each site. In either case, this exceeds $1 ,060,000,000, which is the minimum amount of property insurance required by 10 CFR 50.54.

This letter contains no NRC commitments. If you have any questions, please contact Ken McElroy at (205) 992-7369.

Respectfully submitted, C. fl.~

C. R. Pierce Regulatory Affairs Director CRP/RMJ cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bost, Executive Vice President & Chief Nuclear Officer Ms. C. A. Gayheart, Vice President - Farley Mr. D. R. Vineyard, Vice President- Hatch Mr. D. R. Madison, Vice President- Fleet Operations Mr. B. K. Taber, Vice President- Vogtle 1 & 2 Mr. M.D. Meier, Vice President- Regulatory Affairs Mr. B. J. Adams, Vice President- Engineering Ms. B. L. Taylor, Regulatory Affairs Manager- Farley Mr. G. L. Johnson, Regulatory Affairs Manager- Hatch Mr. G. W. Gunn, Regulatory Affairs Manager- Vogtle 1 & 2 RType: Farley=CFA04.054; Hatch=CHA02.004; Vogtle=CVC7000 U.S. Nuclear Regulatory Commission Ms. C. Haney, Regional Administrator Mr. S. A. Williams, NRR Project Manager- Farley Mr. D. H. Hardage, Senior Resident Inspector- Hatch Mr. W. D. Deschaine, Senior Resident Inspector- Vogtle 1 & 2 Mr. A. M. Alen, Resident Inspector- Vogtle 1 & 2 Mr. P. K. Niebaum, Senior Resident Inspector- Farley Mr. R. E. Martin, NRR Project Manager- Vogtle 1 & 2