NL-14-0441, Edwin I Hatch, Joseph M. Farley and Vogtle, Units 1 & 2 - Nuclear Property Insurance Coverage as of April 1, 2014

From kanterella
Jump to navigation Jump to search
Edwin I Hatch, Joseph M. Farley and Vogtle, Units 1 & 2 - Nuclear Property Insurance Coverage as of April 1, 2014
ML14084A210
Person / Time
Site: Hatch, Vogtle, Farley  Southern Nuclear icon.png
Issue date: 03/24/2014
From: Pierce C
Southern Co, Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-14-0441
Download: ML14084A210 (2)


Text

Charles R. Pierce Southern Nuclear Regulatory Affairs Director Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7872 Fax 205.992.7601 SOUTHERN<<\

March 24, 2014 COMPANY Docket Nos.: 50-321 50-348 50-424 NL-14-0441 50-366 50-364 50-425 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I Hatch Nuclear Plant - Units 1 and 2 Joseph M. Farley Nuclear Plant- Units 1 and 2 Vogtle Electric Generating Plant - Units 1 and 2 Nuclear Property Insurance Coverage as of Apri11. 2014 Ladies and Gentlemen:

In accordance with the nuclear property insurance reporting requirement specified in 10 CFR 50.54(w)(3), the current levels and sources of insurance on Edwin I. Hatch Nuclear Plant, Joseph M. Farley Nuclear Plant, and Vogtle Electric Generating Plant are hereby submitted.

The policies held by Alabama Power Company and Georgia Power Company (including the co-owner licensees as the insured), respectively, are:

Primary Coverage Insurance Nuclear Electric Insurance $1,500,000,000 Ltd. - NEIL Primary Property Policy No.: Farley: P14-001, Hatch: P14-023, Vogtle: P14-024 Excess Coverage Insurance Nuclear Electric Insurance $1,250,000,000 excess Ltd. - NEIL Excess Property of $1,500,000,000 (Note 1)

Policy No.: Farley: X14-001, Hatch: X14-018, Vogtle: X14-074 Note 1: The excess property insurance limits shown are for property damage following a nuclear incident.

The policies listed above provide a total nuclear property coverage limit of

$2,750,000,000 ($1 ,500,000,000 for a non-nuclear event) for each site. In either case, this exceeds $1,060,000,000, which is the minimum amount of property insurance required by 10 CFR 50.54.

U. S. Nuclear Regulatory Commission NL-14-0441 Page2 This letter contains no NRC commitments. If you have any questions, please contact Ken McElroy at (205) 992-7369.

Respectfully submitted, C.tl~

C. A. Pierce Regulatory Affairs Director CRP/RMJ/Iac cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bost, Executive Vice President & Chief Nuclear Officer Ms. C. A. Gayheart, Vice President- Farley Mr. D. A. Vineyard, Vice President- Hatch Mr. T. E. Tynan, Vice President- Vogtle 1 & 2 Mr. D. A. Madison, Vice President- Fleet Operations Mr. B. L. lvey, Vice President- Regulatory Affairs Mr. B. J. Adams, Vice President - Engineering RType: Farley=CFA04.054; Hatch=CHA02.004; Vogtle=CVC7000 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. S. A. Williams, NRR Project Manager- Farley Mr. E. D. Morris, Senior Resident Inspector- Hatch Mr. L. M. Cain, Senior Resident Inspector- Vogtle 1 & 2 Mr. P. K. Niebaum, Senior Resident Inspector- Farley Mr. J. A. Sowa, Resident Inspector- Farley Mr. A. E. Martin, NRR Project Manager- Hatch, Vogtle 1 & 2