Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2013
ML14344A056
Person / Time
Site: Vogtle, Farley  Southern Nuclear icon.png
Issue date: 12/08/2014
From: Pierce C
Southern Co, Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-14-1899
Download: ML14344A056 (14)


Text

Charles R. Pierce Southern Nuclear Regulatory Affairs Director Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, AL 35242 Tel 205.992.7872 Fax 205.992.7601 SOUT ERN A .

COMPANY DFC o 8 2014 Docket Nos.: 50-348 50-424 NL-14-1899 50-364 50-425 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Units 1 and 2 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2013 Ladies and Gentlemen:

Southern Nuclear Operating Company (SNC) is the licensed operator for the Joseph M. Farley Nuclear Plant (Farley) Units 1 and 2, and the Vogtle Electric Generating Plant (Vogtle), Units 1 and 2. The requirements of 10 CFR 50.46(a)(3)(ii) include an annual report by licensees of changes to or errors in acceptable emergency core cooling system (ECCS) models that affect the temperature calculation and the estimated effect of changes or errors on the limiting ECCS analysis. Accordingly, the reports required by 10 CFR 50.46(a)(3)(ii) for Farley and Vogtle are provided in Enclosures 1 and 2, respectively. The resulting peak cladding temperature (PCT) for Farley and Vogtle continue to meet the criterion of 10 CFR 50.46(b)(1) (i.e., ::; 2200°F).

Please note that the 2013 annual report for the Edwin I. Hatch Nuclear Plant, Units 1 and 2, was previously sent by letter dated June 20, 2014.

This letter contains no NRC commitments. If you have any questions, please contact Ken McElroy at (205) 992-7369.

Respectfully submitted, C11~

C. R. Pierce Regulatory Affairs Director CRP/RMJ/Iac

U. S. Nuclear Regulatory Commission NL-14-1899 Page2

Enclosures:

1. Joseph M. Farley Nuclear Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2013
2. Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2013 cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bast, Executive Vice President & Chief Nuclear Officer Ms. C. A. Gayheart, Vice President - Farley Mr. D. R. Madison, Vice President- Fleet Operations Mr. B. K. Taber, Vice President- Vogtle 1 & 2 Mr. M. D. Meier, Vice President- Regulatory Affairs Mr. B. J. Adams, Vice President- Engineering Mr. R. R. Martin, Regulatory Affairs Manager- Farley Mr. G. W. Gunn, Regulatory Affairs Manager- Vogtle 1 & 2 (Acting)

RType: Farley=CFA04.054; Vogtle=CVC7000 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. S. A. Williams, NRR Project Manager- Farley Mr. L. M. Cain, Senior Resident Inspector- Vogtle 1 & 2 Mr. P. K. Niebaum, Resident Inspector- Farley Mr. R.E. Martin, NRR Project Manager- Vogtle 1 & 2

Joseph M. Farley Nuclear Plant Units 1 and 2 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2013 Enclosure 1 Joseph M. Farley Nuclear Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2013

Joseph M. Farley Nuclear Plant - Unit 1 ASTRUM Best Estimate Large Break LOCA Evaluation Table 1-1a- Summary of Changes/Errors (2013)

Estimated Description Effect (d PCT °F)

None affecting PCT* 0 Table 1-1b- Cumulative Impact of Changes/Errors diPCTI Description (DF)

  • Changes/Errors Previously Reported (Reference 1) 0*
  • Summary of Changes/Errors (2013) (Reference 2) 0*

Cumulative Total 0

  • On October 30, 2013, a Significant Change/Error Report for Farley was submitted (Reference 1). This "resef' the baseline PCT for reporting purposes. There were no additional changes/errors in 2013 from those reported in Reference 1.

E1-1

Joseph M. Farley Nuclear Plant - Unit 1 NOTRUMP Appendix K Small Break LOCA Evaluation Table 1-1c- Summary of Changes/Errors (2013)

Estimated Description Effect

(~ PCT °F)

None affecting PCT N/A Table 1-1d- Cumulative Impact of Changes/Errors

~IPCTI Description (OF)

  • Changes/Errors Previously Reported (Reference 1) 0
  • Summary of Changes/Errors (2013) (Reference 2) 0 Cumulative Total 0 E1-2

Joseph M. Farley Nuclear Plant - Unit 2 ASTRUM Best Estimate Large Break LOCA Evaluation Table 1-2a- Summary of Changes/Errors (2013)

Estimated Description Effect (8 PCT °F)

None affecting PCT* 0 Table 1-2b - Cumulative Impact of Changes/Errors 8IPCTI Description COF)

  • Changes/Errors Previously Reported (Reference 1) 0*
  • Summary of Changes/Errors (2013) (Reference 2) 0*

Cumulative Total 0

  • On October 30, 2013, a Significant Change/Error Report for Farley was submitted (Reference 1). This "resef' the baseline PCT for reporting purposes. There were no additional changes/errors in 2013 from those reported in Reference 1.

E1-3

Joseph M. Farley Nuclear Plant - Unit 2 NOTRUMP Appendix K Small Break LOCA Evaluation Table 1-2c - Summary of Changes/Errors (2013)

Estimated Description Effect (d PCT 0 F)

None affecting PCT N/A Table 1-2d - Cumulative Impact of Changes/Errors diPCTI Description COF)

  • Changes/Errors Previously Reported (Reference 1) 0
  • Summary of Changes/Errors (2013) (Reference 2) 0 Cumulative Total 0 E1-4

References:

1. Letter from C. R. Pierce to USNRC (NL-13-2277), "Joseph M. Farley Nuclear Plant 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012 and Significant Change/Error Report," dated October 30, 2013
2. Westinghouse Letter LTR-LIS-14-91, "J. M. Farley Units 1 and 2, 10 CFR 50.46 Annual Notification and Reporting for 2013," dated March 18,2014 E1-5

Joseph M. Farley Nuclear Plant Units 1 and 2 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2013 Enclosure 2 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2013

Vogtle Electric Generating Plant - Unit 1 BASH Large Bre~k LOCA Evaluation Table 1-1a- Summary of Changes/Errors (2013)

Estimated Description Effect (d PCT) (DF)

A change in the methodology used to calculate grid blockage ratio and porosity for 17x17 OFA fuel resulted in a change to the grid inputs used in the 1981 Appendix K Large Break LOCA 29 Evaluation Model with BASH (BASH-EM), which affects the grid heat transfer in the LOCBART fuel rod heatup calculation.

Table 1-1b- Cumulative Impact of Changes/Errors diPCTI Description (DF)

  • Changes/Errors Previously Reported (Reference 1) 0
  • Summary of Changes/Errors (2013) (Reference 2) 29 Cumulative Total 29 E2-1

Vogtle Electric Generating Plant - Unit 1 BASH Large Break LOCA Evaluation Table 1-1c- Summary of Changes/Errors (2013)

Estimated Description Effect (8 PCT)

None affecting PCT N/A Table 1-1d- Cumulative Impact of Changes/Errors 8IPCTI Description eF>

  • Changes/Errors Previously Reported (Reference 1) 0
  • Changes/Errors 2013 Calendar Year (Reference 2) 0 Cumulative Total 0 E2-2

Vogtle Electric Generating Plant - Unit 2 BASH Large Break LOCA Evaluation Table 1-2a- Summary of Changes/Errors (2013)

Estimated Description Effect (8PCn A change in the methodology used to calculate grid blockage ratio and porosity for 17x17 OFA fuel resulted in a change to the grid inputs used in the 1981 Appendix K Large Break LOCA 29 Evaluation Model with BASH (BASH-EM), which affects the grid heat transfer in the LOCBART fuel rod heatup calculation.

Table 1-2b- Cumulative Impact of Changes/Errors lliPCTI Description COF)

  • Changes/Errors Previously Reported (Reference 1) 0
  • Summary of Changes/Errors (2013) (Reference 2) 29
  • Cumulative Total 29 E2-3

Vogtle Electric Generating Plant - Unit 2 Appendix K Small Break LOCA Evaluation Table 1-2c- Summary of Changes/Errors (2013)

Estimated Description Effect (d PCT)

None affecting PCT N/A Table 1-2d - Cumulative Impact of Changes/Errors diPCTI Description COF)

  • Changes/Errors Previously Reported (Reference 1) 0
  • Changes/Errors 2013 Calendar Year (Reference 2) 0 Cumulative Total 0 E2-4

References:

1. Letter from C. A. Pierce to USNRC (NL-13-2576), .. Edwin I. Hatch Nuclear Plant Units 1 and 2 Vogtle Electric Generating Plant Units 1 and 2 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2012, .. dated December 23, 2013.
2. Westinghouse letter LTR-LIS-14-101, "A. W. Vogtle Units 1 and 2 10 CFR 50.46 Annual Notification and Reporting for 2013," dated March 17, 2014.

E2-5