Letter Sequence Supplement |
---|
EPID:L-2018-LLA-0103, RAI (LAR 18-009) - Vogtle Electric Generating Plant, Unit 3 and 4 (Approved, Closed) |
|
MONTHYEARML18074A1422018-03-15015 March 2018 COL Docs - Summary of Audit Conducted for LAR 17-027, for Vogtle 3 and 4, RCS Vacuum Fill and ITAAC for Containment Flood Up Project stage: Other ND-18-0374, Request for License Amendment: Technical Specification Changes to Support Operability During Mode 5 Vacuum Fill Operations (LAR-18-009)2018-04-13013 April 2018 Request for License Amendment: Technical Specification Changes to Support Operability During Mode 5 Vacuum Fill Operations (LAR-18-009) Project stage: Request ML18192C0782018-07-11011 July 2018 RAI (LAR 18-009) - Vogtle Electric Generating Plant, Unit 3 and 4 Project stage: Request ND-18-1040, Supplement to the Request for License Amendment: Technical Specification Changes to Support Operability During Mode 5 Vacuum Fill Operations (LAR-18-009S1)2018-08-10010 August 2018 Supplement to the Request for License Amendment: Technical Specification Changes to Support Operability During Mode 5 Vacuum Fill Operations (LAR-18-009S1) Project stage: Supplement ML18248A1432018-10-11011 October 2018 Safety Evaluation - Vogtle Electric Generating Plant, Units 3 and 4 - LAR 18-009 Project stage: Approval ML18248A1372018-10-11011 October 2018 Issuance of Amendments (LAR 18-009) Technical Specification Changes to Support Operability During Mode 5 Operations Project stage: Request ML18248A1422018-10-11011 October 2018 Attachment - Vogtle Electric Generating Plant, Unit 4 Amendment 145( (LAR-18-009) Project stage: Acceptance Review ML18248A1412018-10-11011 October 2018 Amendment - Vogtle Electric Generating Plant, Unit 4 LAR 18-009 Project stage: Other ML18248A1402018-10-11011 October 2018 Attachment - Vogtle Electric Generating Plant, Unit 3 Amendment 146 (LAR-18-009) Project stage: Acceptance Review ML18248A1392018-10-11011 October 2018 Amendment - Vogtle Electric Generating Plant, Unit 3 LAR 18-009 Project stage: Other ML18248A1382018-10-11011 October 2018 Cover Letter - Vogtle Electric Generating Plant, Units 3 and 4 (LAR 18-009) Project stage: Other 2018-04-13
[Table View] |
|
---|
Category:Letter type:ND
MONTHYEARND-24-0019, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-02-0101 February 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0912, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-01-0202 January 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0881, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-12-0404 December 2023 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0817, (Vegp), Units 3 and 4 - Report of UFSAR Chapter 14 Changes to the Initial Test Program in Accordance with License Condition 2.D.(7)(a)2023-11-17017 November 2023 (Vegp), Units 3 and 4 - Report of UFSAR Chapter 14 Changes to the Initial Test Program in Accordance with License Condition 2.D.(7)(a) ND-23-0823, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-11-0303 November 2023 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0723, (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-10-0404 October 2023 (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0697, (Vegp), Unit 4, Submittal of Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-09-0505 September 2023 (Vegp), Unit 4, Submittal of Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0669, (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-08-0707 August 2023 (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0205, (Vegp), Unit 3 - Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests2023-07-28028 July 2023 (Vegp), Unit 3 - Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests ND-23-0618, Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797)2023-07-20020 July 2023 Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797) ND-23-0609, Notification of Completion of All ITAAC2023-07-20020 July 2023 Notification of Completion of All ITAAC ND-23-0608, ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72) ND-23-0607, ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13) ND-22-0796, ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813) ND-23-0459, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587) ND-23-0162, ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165) ND-23-0575, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588) ND-23-0439, ITAAC Closure Notification on Completion of ITAAC 2.2.05.07a.i (Index Number 265)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.05.07a.i (Index Number 265) ND-23-0552, Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624)2023-07-18018 July 2023 Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624) ND-23-0483, ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4) ND-23-0586, ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159)2023-07-17017 July 2023 ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159) ND-23-0610, ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603)2023-07-17017 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603) ND-23-0573, ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497) ND-23-0406, ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498) ND-22-0816, ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19)2023-07-15015 July 2023 ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19) ND-23-0603, ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831) ND-23-0446, ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250) ND-23-0594, ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629) ND-23-0601, ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719) ND-23-0606, ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557) ND-23-0476, ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355) ND-23-0499, ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700) ND-23-0588, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78) ND-23-0121, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667) ND-23-0122, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668) ND-23-0597, ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530) ND-23-0002, ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270) ND-23-0111, ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646) ND-22-0980, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75) ND-23-0587, ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595) ND-23-0461, ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652) ND-23-0543, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622) ND-23-0394, ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703) ND-23-0592, ITAAC Closure Notification on Completion of 2.7.06.03.i (Index Number 726)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of 2.7.06.03.i (Index Number 726) ND-23-0589, ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601) ND-23-0581, ITAAC Closure Notification on Completion of ITAAC 2.2.04.02a (Index Number 220)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.04.02a (Index Number 220) ND-23-0486, ITAAC Closure Notification on Completion of ITAAC 2.2.01.11a.iv (Index Number 117)2023-07-11011 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.01.11a.iv (Index Number 117) ND-23-0559, CFR26.719(c)(1) 30-Day Report for a Blind Sample Analysis Error2023-07-11011 July 2023 CFR26.719(c)(1) 30-Day Report for a Blind Sample Analysis Error ND-23-0443, ITAAC Closure Notification on Completion of ITAAC 2.3.10.07a.ii (Index Number 444)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.10.07a.ii (Index Number 444) ND-23-0183, ITAAC Closure Notification on Completion of ITAAC Item 2.3.11.03b (Index Number 454)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.3.11.03b (Index Number 454) 2024-02-01
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARNL-24-0020, Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report2024-01-22022 January 2024 Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report NL-23-0827, Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.142023-11-17017 November 2023 Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.14 NL-23-0750, Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr2023-10-0404 October 2023 Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr NL-23-0695, Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2)2023-08-31031 August 2023 Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2) NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0670, Response to Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-144832023-08-11011 August 2023 Response to Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-23-0339, Response to Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters - Operating, Completion Time Extension (LAR-22-002S1)2023-06-13013 June 2023 Response to Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters - Operating, Completion Time Extension (LAR-22-002S1) NL-23-0467, Response to Request for Additional Information Regarding License Amendment Request: Timing of Unit 4 Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005S1)2023-06-0909 June 2023 Response to Request for Additional Information Regarding License Amendment Request: Timing of Unit 4 Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005S1) NL-23-0196, Response to Request for Additional Information Regarding License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-4902023-03-24024 March 2023 Response to Request for Additional Information Regarding License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-490 NL-23-0010, Response to Request for Additional Information Regarding License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-4902023-02-0606 February 2023 Response to Request for Additional Information Regarding License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-490 NL-23-0013, Response to Request for Additional Information Related to 10CFR 50.75 Decommissioning Funding Assurance Requirements2023-01-30030 January 2023 Response to Request for Additional Information Related to 10CFR 50.75 Decommissioning Funding Assurance Requirements NL-23-0068, Responses to NRC Request for Additional Information Related to the Refueling Outage 2R22 Steam Generator Tube Inspection Report2023-01-27027 January 2023 Responses to NRC Request for Additional Information Related to the Refueling Outage 2R22 Steam Generator Tube Inspection Report NL-23-0012, Post-Audit Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel2023-01-20020 January 2023 Post-Audit Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel NL-22-0609, Response to NRC Requests for Information License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel2022-09-13013 September 2022 Response to NRC Requests for Information License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel NL-22-0549, Responses to NRC Request for Additional Information for Refueling Outage 1R23 Steam Generator Tube Inspection Report2022-07-19019 July 2022 Responses to NRC Request for Additional Information for Refueling Outage 1R23 Steam Generator Tube Inspection Report ND-22-0328, Enclosuvogtle Electric Generating Plant, Units 3 & 4 - Fukushima Response NEI 12-01 On-Shift Staffing Analysis Phase 2 Report, Revision 3.0, Standard Emergency Plan Annex, Revision 6.02022-06-29029 June 2022 Enclosuvogtle Electric Generating Plant, Units 3 & 4 - Fukushima Response NEI 12-01 On-Shift Staffing Analysis Phase 2 Report, Revision 3.0, Standard Emergency Plan Annex, Revision 6.0 NL-22-0055, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.2 Limiting Condition for Operation to Remove One Main Steam Isolation Valve System2022-02-28028 February 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.2 Limiting Condition for Operation to Remove One Main Steam Isolation Valve System NL-21-1015, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.2 Limiting Condition for Operation to Remove One Main Steam Isolation Valve System2022-01-13013 January 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.2 Limiting Condition for Operation to Remove One Main Steam Isolation Valve System ND-21-0618, Response to Request for Additional Information Regarding Request for Alternative: Alternative Requirements for ASME Section Ill Remediation of Containment Vessel Unistrut Welding (VEGP 3-ALT-16)2021-07-0202 July 2021 Response to Request for Additional Information Regarding Request for Alternative: Alternative Requirements for ASME Section Ill Remediation of Containment Vessel Unistrut Welding (VEGP 3-ALT-16) NL-21-0208, Response to Request for Additional Information Related to Refueling Outage 1R22 Steam Generator Tube Inspection Report2021-03-0202 March 2021 Response to Request for Additional Information Related to Refueling Outage 1R22 Steam Generator Tube Inspection Report NL-20-1417, Vogltle, Units 1 and 2, Response to Request for Additional Information Regarding Risk-Informed Resolution to GSI-1912020-12-17017 December 2020 Vogltle, Units 1 and 2, Response to Request for Additional Information Regarding Risk-Informed Resolution to GSI-191 NL-20-1312, Response to Request for Additional Information Related to Proposed Inservice Inspection Alternative VEGP-ISI-ALT-04-04 Version 2.02020-11-23023 November 2020 Response to Request for Additional Information Related to Proposed Inservice Inspection Alternative VEGP-ISI-ALT-04-04 Version 2.0 NL-20-1273, Response to NRC Requests for Information License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for2020-11-20020 November 2020 Response to NRC Requests for Information License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for ND-20-1005, Supplement to Request for License Amendment: Vacuum Relief Valve Technical Specification Changes (LAR-20-005S1)2020-09-18018 September 2020 Supplement to Request for License Amendment: Vacuum Relief Valve Technical Specification Changes (LAR-20-005S1) NL-20-0640, Response to Request for Additional Information for Exemption Request2020-05-27027 May 2020 Response to Request for Additional Information for Exemption Request ND-19-1097, Response to Request for Additional Information - LAR-19-013R12019-11-0101 November 2019 Response to Request for Additional Information - LAR-19-013R1 NL-19-1183, Response to Request for Additional Information Regarding End State Revision from Hot Shutdown to Cold Shutdown2019-10-17017 October 2019 Response to Request for Additional Information Regarding End State Revision from Hot Shutdown to Cold Shutdown ND-19-1023, Enclosure 7 - Response to Draft Request for Additional Information (LAR-19-005R1)2019-10-10010 October 2019 Enclosure 7 - Response to Draft Request for Additional Information (LAR-19-005R1) ND-19-1129, Supplement to the Request for License Amendment Regarding Protection and Safety Monitoring System Surveillance Requirement Reduction Technical Specification ...2019-10-0707 October 2019 Supplement to the Request for License Amendment Regarding Protection and Safety Monitoring System Surveillance Requirement Reduction Technical Specification ... ND-19-1177, Supplement to Request for License Amendment and Exemption: Addition of In-Containment Refueling Water Storage Tank to Radiation Analyses (LAR-19-003S1)2019-10-0303 October 2019 Supplement to Request for License Amendment and Exemption: Addition of In-Containment Refueling Water Storage Tank to Radiation Analyses (LAR-19-003S1) NL-19-0709, Core Operating Limits Report, Cycle 21, Version 1, SNC Response to NRC Request for Additional Information2019-06-17017 June 2019 Core Operating Limits Report, Cycle 21, Version 1, SNC Response to NRC Request for Additional Information NL-19-0498, License Amendment Request for Technical Specification Improvement to Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable SNC Response to NRC Request for ...2019-04-30030 April 2019 License Amendment Request for Technical Specification Improvement to Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable SNC Response to NRC Request for ... ND-19-0289, Enclosure 1 - Revised Response to Request for Additional Information Question 1b Related to Request for Exemption from Operator Written Examination and Operating Test2019-04-16016 April 2019 Enclosure 1 - Revised Response to Request for Additional Information Question 1b Related to Request for Exemption from Operator Written Examination and Operating Test ND-19-0178, Supplement to Request for Exemption: 10 CFR Part 26 Visitor Access Requirements (Supplement 1)2019-03-0808 March 2019 Supplement to Request for Exemption: 10 CFR Part 26 Visitor Access Requirements (Supplement 1) ND-19-0216, Response to Request for Additional Information Related to Request for Exemption from Operator Written Examination and Operating Test2019-03-0404 March 2019 Response to Request for Additional Information Related to Request for Exemption from Operator Written Examination and Operating Test NL-18-1514, Response to Request for Information Regarding License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum On-Shift.2019-01-31031 January 2019 Response to Request for Information Regarding License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum On-Shift. ND-19-0007, Supplement to Request for Alternative: Preservice and Inservice Inspection Requirements for Specific Valve-to-Pipe Welds (VEGP 3&4-PSI/ISI-ALT-06S1)2019-01-28028 January 2019 Supplement to Request for Alternative: Preservice and Inservice Inspection Requirements for Specific Valve-to-Pipe Welds (VEGP 3&4-PSI/ISI-ALT-06S1) ND-18-1439, Revised Request for License Amendment: Technical Specification Changes for Spent Fuel Pool Level - Low 2 and In-containment Refueling Water Storage Tank (IRWST) Wide Range Level - Low Operability (LAR-18-017R1)2018-12-0303 December 2018 Revised Request for License Amendment: Technical Specification Changes for Spent Fuel Pool Level - Low 2 and In-containment Refueling Water Storage Tank (IRWST) Wide Range Level - Low Operability (LAR-18-017R1) NL-18-1181, Relief Requests VEGP-ISI-RR-05 and VEGP-ISI-RR-06, SNC Response to NRC Request for Additional Information2018-10-17017 October 2018 Relief Requests VEGP-ISI-RR-05 and VEGP-ISI-RR-06, SNC Response to NRC Request for Additional Information ND-18-1058, Supplement to Request for License Amendment and Exemption: Containment Pressure Analysis (LAR-17-043S1)2018-09-28028 September 2018 Supplement to Request for License Amendment and Exemption: Containment Pressure Analysis (LAR-17-043S1) NL-18-1130, Units 1 and 2 - Relief Request VEGP-ISI-RR-03: SNC Response to NRC Request for Additional Information2018-09-26026 September 2018 Units 1 and 2 - Relief Request VEGP-ISI-RR-03: SNC Response to NRC Request for Additional Information NL-18-1179, Response to NRC Request for Additional Information Tornado Missile Risk Evaluator SNC Supplemental2018-09-14014 September 2018 Response to NRC Request for Additional Information Tornado Missile Risk Evaluator SNC Supplemental ND-18-0635, Response to Request for Additional Information Regarding Application of VT-1 Visual Examination Methodology for Preservice Inspection of the Reactor Vessel Nozzle Inner Radius Sections (VEGP 3&4-PSI-ALT-07S3)2018-08-31031 August 2018 Response to Request for Additional Information Regarding Application of VT-1 Visual Examination Methodology for Preservice Inspection of the Reactor Vessel Nozzle Inner Radius Sections (VEGP 3&4-PSI-ALT-07S3) ND-18-1040, Supplement to the Request for License Amendment: Technical Specification Changes to Support Operability During Mode 5 Vacuum Fill Operations (LAR-18-009S1)2018-08-10010 August 2018 Supplement to the Request for License Amendment: Technical Specification Changes to Support Operability During Mode 5 Vacuum Fill Operations (LAR-18-009S1) ND-18-1049, Supplement to Request for License Amendment: Technical Specification Updates for Reactivity Controls and Other Miscellaneous Changes (LAR-17-024S4)2018-08-0909 August 2018 Supplement to Request for License Amendment: Technical Specification Updates for Reactivity Controls and Other Miscellaneous Changes (LAR-17-024S4) NL-18-0815, Tornado Missile Risk Evaluator: SNC Response to NRC Request for Additional Information2018-07-26026 July 2018 Tornado Missile Risk Evaluator: SNC Response to NRC Request for Additional Information NL-18-0915, Enclosures 1, 3, 4 & 5 - Introduction and Overall Summary, Risk Quantification, Defense-in-Depth & Safety Margin and Supplemental Response to NRC Generic Letter 2004-022018-07-10010 July 2018 Enclosures 1, 3, 4 & 5 - Introduction and Overall Summary, Risk Quantification, Defense-in-Depth & Safety Margin and Supplemental Response to NRC Generic Letter 2004-02 ND-18-0646, Supplement to Request for License Amendment and Exemption: Changes to Tier 2* Departure Evaluation Process (LAR-17-037S3)2018-06-18018 June 2018 Supplement to Request for License Amendment and Exemption: Changes to Tier 2* Departure Evaluation Process (LAR-17-037S3) L-16-016, Response to NRC Rais Regarding Generic Letter 2016-012018-05-31031 May 2018 Response to NRC Rais Regarding Generic Letter 2016-01 ND-18-0643, Supplement to Request for License Amendment and Exemption Regarding Ventilation System Changes (LAR-16-030R1S2)2018-05-18018 May 2018 Supplement to Request for License Amendment and Exemption Regarding Ventilation System Changes (LAR-16-030R1S2) 2024-01-22
[Table view] |
Text
Southern Nuclear Operating Company, Inc.
3535 Colonnade Parkway Birmingham, AL 35243 August 10, 2018 Docket Nos.: 52-025 ND-18-1040 52-026 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 Supplement to the Request for License Amendment:
Technical Specification Changes to Support Operability During Mode 5 Vacuum Fill Operations (LAR-18-009S1)
Ladies and Gentlemen:
Pursuant to 10 CFR 52.98(c) and in accordance with 10 CFR 50.90, Southern Nuclear Operating Company (SNC) requested an amendment to the combined licenses (COLs) for Vogtle Electric Generating Plant (VEGP) Units 3 and 4 (License Numbers NPF-91 and NPF-92, respectively) by SNC letter ND-18-0374 (LAR-18-009), dated April 13, 2018 [ADAMS Accession Number ML181031A252]. The requested amendment proposed changes to COL Appendix A, Technical Specifications (TS), and departures from the Updated Final Safety Analysis Report (UFSAR)
(which includes the plant-specific DCD Tier 2 information) with changes which conform with the requested TS changes.
This letter supplements LAR18009 to respond to the NRC Staff Request for Additional Information (RAI), which was transmitted to SNC on July 3, 2018 [ADAMS Accession Number ML18192C078].
There are no changes to Enclosures 1, 2, or 3, which were included in the original submittal of LAR-18-009, as a result of this supplement. of this letter provides the SNC response to the RAI.
The information provided in this License Amendment Request (LAR) supplement does not impact the scope, technical content, or conclusions of the Significant Hazards Consideration Determination or the Environmental Considerations of the original LAR-18-009 provided in Enclosures 1 and 2 of SNC letter ND-18-0374.
This letter contains no regulatory commitments. This letter has been reviewed and determined not to contain security-related information.
SNC requests NRC staff approval of the LAR by October 12, 2018. Approval by this date will allow sufficient time to implement licensing basis changes necessary to support procedure development in relation to conducting the necessary operator training to support plant operations.
U.S. Nuclear Regulatory Commission ND-18-1040 Page 2 of 4 SNC expects to implement this proposed amendment within 30 days of approval of the requested changes.
In accordance with 10 CFR 50.91, SNC is notifying the State of Georgia of this LAR supplement by transmitting a copy of this letter and its enclosures to the designated State Official.
Should you have any questions, please contact Mr. Wesley Sparkman at (205) 992-5061.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 1Oth of August 2018.
Respectfully submitted, Amy Aughtman Licensing Manager, Regulatory Affairs Southern Nuclear Operating Company Enclosures 1) through 3) Previously submitted with the original LAR, LAR-18-009
- 4) Vogtle Electric Generating Plant (VEGP) Units 3 and 4 -
Supplement to the Request for License Amendment Regarding Technical Specification Changes to Support Operability During Mode 5 Vacuum Fill Operations (LAR-18-009S1)
U.S. Nuclear Regulatory Commission ND-18-1040 Page 3 of 4 cc:
Southern Nuclear Operating Company / Georgia Power Company Mr. S. E. Kuczynski (w/o enclosures)
Mr. D. G. Bost (w/o enclosures)
Mr. M. D. Meier (w/o enclosures)
Mr. D. H. Jones (w/o enclosures)
Mr. J. B. Klecha Mr. G. Chick Mr. D. L. McKinney (w/o enclosures)
Mr. T. W. Yelverton (w/o enclosures)
Mr. B. H. Whitley Ms. C. A. Gayheart Mr. C. R. Pierce Ms. A. G. Aughtman Mr. D. L. Fulton Mr. M. J. Yox Mr. E. W. Rasmussen Mr. J. Tupik Mr. W. A. Sparkman Ms. A. C. Chamberlain Ms. A. L. Pugh Ms. P. Reister Document Services RTYPE: VND.LI.L00 File AR.01.02.06 Nuclear Regulatory Commission Mr. W. Jones (w/o enclosures)
Ms. J. Dixon-Herrity Mr. C. Patel Ms. J. M. Heisserer Mr. B. Kemker Mr. G. Khouri Ms. S. Temple Mr. F. Brown Mr. T.E. Chandler Ms. P. Braxton Mr. T. Brimfield Mr. C. J. Even Mr. A. Lerch State of Georgia Mr. R. Dunn
U.S. Nuclear Regulatory Commission ND-18-1040 Page 4 of 4 Oglethorpe Power Corporation Mr. M. W. Price Ms. A. Whaley Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Mr. L. Oriani (w/o enclosures)
Mr. C. Churchman (w/o enclosures)
Mr. M. Corletti Mr. M. L. Clyde Ms. L. Iller Mr. D. Hawkins Mr. J. Coward Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. A. Matis, Tetra Tech NUS, Inc.
Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.
Mr. S. Roetger, Georgia Public Service Commission Ms. S. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham Mr. R. Grumbir, APOG NDDocumentinBox@duke-energy.com, Duke Energy Mr. S. Franzone, Florida Power & Light
Southern Nuclear Operating Company ND-18-1040 Enclosure 4 Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Supplement to the Request for License Amendment Regarding Technical Specification Changes to Support Operability During Mode 5 Vacuum Fill Operations (LAR-18-009S1)
(This Enclosure consists of 3 pages, including this cover page)
ND-18-1040 Supplement to the Request for License Amendment Regarding Technical Specification Changes to Support Operability During Mode 5 Vacuum Fill Operations (LAR-18-009S1)
The NRC requested the following information regarding LAR-18-009 in a request for additional information (RAI) dated July 3, 2018. The RAI is available in NRC ADAMS under Accession Number ML18192C078.
RAI Question 10 CFR Part 50, Appendix A, General Design Criterion (GDC) 34, "Residual heat removal",
requires the plant design to provide a system to remove residual heat. The safety system function shall be to transfer fission product decay heat and other residual heat from the reactor core at a rate such that specified acceptable fuel design limits and the design conditions of the reactor coolant pressure boundary are not exceeded.
License Amendment Request (LAR)18-009 states "In MODE 5, vacuum fill configuration, the PRHR HX is not credited in the safety analysis to remove decay heat. If decay heat removal by the RNS is lost during vacuum fill, the heat removal function is provided by the vent path through the ADS valves and the injection flow path from the IRWST with containment closure capability provided."
NRC staff is seeking clarification regarding the referenced safety analysis in order to establish a finding that the supporting safety analysis is acceptable.
Specifically, NRC staff documented their examination of APP-SSAR-GEF-088, Revision 0, "Small Break LOCA (SBLOCA), Loss of Normal Residual Heat Removal System (RNS) Cooling, and Long Term Core Cooling Mass and Energy Release Assessment of Outstanding Design Debt,"
Attachment D, "Shutdown Loss-of-RNS Debt Assessment Evaluation," in an audit summary associated with LAR 17-027, "Reactor Coolant System Vacuum Fill and ITAAC for Containment Floodup" (ML18074A142) and needs to confirm whether this same analysis is supporting LAR 18-009. Accordingly, NRC staff requests that the licensee (1) confirm that Attachment D of APP-SSAR-GEF-088 is the safety analysis that is referenced in LAR 18-009, and (2) provide a brief summary of the supporting safety analysis describing the evaluation model, input parameters and initial conditions (including which equipment is operable and credited for event mitigation), and the analysis conclusions.
SNC RAI Response (1) The loss of Normal Residual Heat Removal System (RNS) cooling safety analysis cited in License Amendment Request (LAR)-18-009 is Appendix D of APP-SSAR-GEF-088, which is the same analysis that was audited by the NRC Staff in review of LAR-17-027.
(2) This analysis is performed using the NOTRUMP code, which is consistent with the approved loss of RNS analysis presented in UFSAR Subsections 19E.4.8.2 and 19E.4.8.3. This code is also used for UFSAR Chapter 15 small break loss of coolant accident (LOCA) analyses.
The analysis was performed using the small break LOCA model with conditions and equipment tailored to the MODE 5 scenario. Conservatively, the decay heat modeled for the MODE 5 vacuum refill configuration analysis was the 10 CFR 50 Appendix K decay heat, which is also used in the small break LOCA model. For additional conservatism, the decay heat for the MODE 5 vacuum refill configuration analysis was initialized at 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> post shutdown even though the equipment availability represents the greater than 28-hour post shutdown configuration with additional conservatisms outlined below. The simulation was modeled with Reactor Coolant System (RCS) conditions reflective of pressurizer full Page 2 of 3
ND-18-1040 Supplement to the Request for License Amendment Regarding Technical Specification Changes to Support Operability During Mode 5 Vacuum Fill Operations (LAR-18-009S1) conditions with temperatures representative of RCS open. This set of conditions maintained the challenging Automatic Depressurization System (ADS) Stages 1, 2, and 3 venting scenario that exists for the RCS open case and did not further reduce RCS temperatures.
The analysis equipment availability and the equipment credited in the simulation is:
- Core Makeup Tanks - Not credited
- In-Containment Refueling Water Storage Tank - One flow path operable and credited
- ADS Stages 1, 2, and 3 - One of each ADS Stages 1, 2, and 3 common to one inlet header operable, but only one ADS Stage 2 flow path is credited [1]
- ADS Stage 4 - Three flow paths operable, but only two flow paths are credited, assuming single failure of one ADS Stage 4 flow path [1]
[1]
In addition to assuming the single failure scenario of a loss of one available ADS Stage 4 flow path, the analysis assumes an additional failure by assuming the loss of both of the available ADS Stage 1 and ADS Stage 3 flow paths.
As discussed in the analysis, the event is successfully mitigated using the assumed credited equipment with the two-phase mixture level being maintained above the top of the active fuel.
Page 3 of 3