MONTHYEARND-24-0019, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-02-0101 February 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0912, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-01-0202 January 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0881, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-12-0404 December 2023 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0817, (Vegp), Units 3 and 4 - Report of UFSAR Chapter 14 Changes to the Initial Test Program in Accordance with License Condition 2.D.(7)(a)2023-11-17017 November 2023 (Vegp), Units 3 and 4 - Report of UFSAR Chapter 14 Changes to the Initial Test Program in Accordance with License Condition 2.D.(7)(a) ND-23-0823, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-11-0303 November 2023 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0723, (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-10-0404 October 2023 (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0697, (Vegp), Unit 4, Submittal of Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-09-0505 September 2023 (Vegp), Unit 4, Submittal of Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0669, (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-08-0707 August 2023 (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0205, (Vegp), Unit 3 - Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests2023-07-28028 July 2023 (Vegp), Unit 3 - Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests ND-23-0618, Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797)2023-07-20020 July 2023 Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797) ND-23-0609, Notification of Completion of All ITAAC2023-07-20020 July 2023 Notification of Completion of All ITAAC ND-23-0608, ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72) ND-23-0607, ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13) ND-22-0796, ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813) ND-23-0459, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587) ND-23-0162, ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165) ND-23-0575, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588) ND-23-0439, ITAAC Closure Notification on Completion of ITAAC 2.2.05.07a.i (Index Number 265)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.05.07a.i (Index Number 265) ND-23-0552, Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624)2023-07-18018 July 2023 Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624) ND-23-0483, ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4) ND-23-0586, ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159)2023-07-17017 July 2023 ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159) ND-23-0610, ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603)2023-07-17017 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603) ND-23-0573, ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497) ND-23-0406, ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498) ND-22-0816, ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19)2023-07-15015 July 2023 ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19) ND-23-0603, ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831) ND-23-0446, ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250) ND-23-0594, ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629) ND-23-0601, ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719) ND-23-0606, ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557) ND-23-0476, ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355) ND-23-0499, ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700) ND-23-0588, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78) ND-23-0121, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667) ND-23-0122, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668) ND-23-0597, ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530) ND-23-0002, ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270) ND-23-0111, ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646) ND-22-0980, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75) ND-23-0587, ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595) ND-23-0461, ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652) ND-23-0543, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622) ND-23-0394, ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703) ND-23-0592, ITAAC Closure Notification on Completion of 2.7.06.03.i (Index Number 726)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of 2.7.06.03.i (Index Number 726) ND-23-0589, ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601) ND-23-0581, ITAAC Closure Notification on Completion of ITAAC 2.2.04.02a (Index Number 220)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.04.02a (Index Number 220) ND-23-0486, ITAAC Closure Notification on Completion of ITAAC 2.2.01.11a.iv (Index Number 117)2023-07-11011 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.01.11a.iv (Index Number 117) ND-23-0559, CFR26.719(c)(1) 30-Day Report for a Blind Sample Analysis Error2023-07-11011 July 2023 CFR26.719(c)(1) 30-Day Report for a Blind Sample Analysis Error ND-23-0443, ITAAC Closure Notification on Completion of ITAAC 2.3.10.07a.ii (Index Number 444)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.10.07a.ii (Index Number 444) ND-23-0183, ITAAC Closure Notification on Completion of ITAAC Item 2.3.11.03b (Index Number 454)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.3.11.03b (Index Number 454) 2024-02-01
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARNL-24-0020, Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report2024-01-22022 January 2024 Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report NL-23-0827, Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.142023-11-17017 November 2023 Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.14 NL-23-0750, Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr2023-10-0404 October 2023 Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr NL-23-0695, Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2)2023-08-31031 August 2023 Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2) NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0670, Response to Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-144832023-08-11011 August 2023 Response to Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-23-0339, Response to Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters - Operating, Completion Time Extension (LAR-22-002S1)2023-06-13013 June 2023 Response to Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters - Operating, Completion Time Extension (LAR-22-002S1) NL-23-0467, Response to Request for Additional Information Regarding License Amendment Request: Timing of Unit 4 Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005S1)2023-06-0909 June 2023 Response to Request for Additional Information Regarding License Amendment Request: Timing of Unit 4 Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005S1) NL-23-0196, Response to Request for Additional Information Regarding License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-4902023-03-24024 March 2023 Response to Request for Additional Information Regarding License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-490 NL-23-0010, Response to Request for Additional Information Regarding License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-4902023-02-0606 February 2023 Response to Request for Additional Information Regarding License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-490 NL-23-0013, Response to Request for Additional Information Related to 10CFR 50.75 Decommissioning Funding Assurance Requirements2023-01-30030 January 2023 Response to Request for Additional Information Related to 10CFR 50.75 Decommissioning Funding Assurance Requirements NL-23-0068, Responses to NRC Request for Additional Information Related to the Refueling Outage 2R22 Steam Generator Tube Inspection Report2023-01-27027 January 2023 Responses to NRC Request for Additional Information Related to the Refueling Outage 2R22 Steam Generator Tube Inspection Report NL-23-0012, Post-Audit Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel2023-01-20020 January 2023 Post-Audit Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel NL-22-0609, Response to NRC Requests for Information License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel2022-09-13013 September 2022 Response to NRC Requests for Information License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel NL-22-0549, Responses to NRC Request for Additional Information for Refueling Outage 1R23 Steam Generator Tube Inspection Report2022-07-19019 July 2022 Responses to NRC Request for Additional Information for Refueling Outage 1R23 Steam Generator Tube Inspection Report ND-22-0328, Enclosuvogtle Electric Generating Plant, Units 3 & 4 - Fukushima Response NEI 12-01 On-Shift Staffing Analysis Phase 2 Report, Revision 3.0, Standard Emergency Plan Annex, Revision 6.02022-06-29029 June 2022 Enclosuvogtle Electric Generating Plant, Units 3 & 4 - Fukushima Response NEI 12-01 On-Shift Staffing Analysis Phase 2 Report, Revision 3.0, Standard Emergency Plan Annex, Revision 6.0 NL-22-0055, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.2 Limiting Condition for Operation to Remove One Main Steam Isolation Valve System2022-02-28028 February 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.2 Limiting Condition for Operation to Remove One Main Steam Isolation Valve System NL-21-1015, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.2 Limiting Condition for Operation to Remove One Main Steam Isolation Valve System2022-01-13013 January 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.2 Limiting Condition for Operation to Remove One Main Steam Isolation Valve System ND-21-0618, Response to Request for Additional Information Regarding Request for Alternative: Alternative Requirements for ASME Section Ill Remediation of Containment Vessel Unistrut Welding (VEGP 3-ALT-16)2021-07-0202 July 2021 Response to Request for Additional Information Regarding Request for Alternative: Alternative Requirements for ASME Section Ill Remediation of Containment Vessel Unistrut Welding (VEGP 3-ALT-16) NL-21-0208, Response to Request for Additional Information Related to Refueling Outage 1R22 Steam Generator Tube Inspection Report2021-03-0202 March 2021 Response to Request for Additional Information Related to Refueling Outage 1R22 Steam Generator Tube Inspection Report NL-20-1417, Vogltle, Units 1 and 2, Response to Request for Additional Information Regarding Risk-Informed Resolution to GSI-1912020-12-17017 December 2020 Vogltle, Units 1 and 2, Response to Request for Additional Information Regarding Risk-Informed Resolution to GSI-191 NL-20-1312, Response to Request for Additional Information Related to Proposed Inservice Inspection Alternative VEGP-ISI-ALT-04-04 Version 2.02020-11-23023 November 2020 Response to Request for Additional Information Related to Proposed Inservice Inspection Alternative VEGP-ISI-ALT-04-04 Version 2.0 NL-20-1273, Response to NRC Requests for Information License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for2020-11-20020 November 2020 Response to NRC Requests for Information License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for ND-20-1005, Supplement to Request for License Amendment: Vacuum Relief Valve Technical Specification Changes (LAR-20-005S1)2020-09-18018 September 2020 Supplement to Request for License Amendment: Vacuum Relief Valve Technical Specification Changes (LAR-20-005S1) NL-20-0640, Response to Request for Additional Information for Exemption Request2020-05-27027 May 2020 Response to Request for Additional Information for Exemption Request ND-19-1097, Response to Request for Additional Information - LAR-19-013R12019-11-0101 November 2019 Response to Request for Additional Information - LAR-19-013R1 NL-19-1183, Response to Request for Additional Information Regarding End State Revision from Hot Shutdown to Cold Shutdown2019-10-17017 October 2019 Response to Request for Additional Information Regarding End State Revision from Hot Shutdown to Cold Shutdown ND-19-1023, Enclosure 7 - Response to Draft Request for Additional Information (LAR-19-005R1)2019-10-10010 October 2019 Enclosure 7 - Response to Draft Request for Additional Information (LAR-19-005R1) ND-19-1129, Supplement to the Request for License Amendment Regarding Protection and Safety Monitoring System Surveillance Requirement Reduction Technical Specification ...2019-10-0707 October 2019 Supplement to the Request for License Amendment Regarding Protection and Safety Monitoring System Surveillance Requirement Reduction Technical Specification ... ND-19-1177, Supplement to Request for License Amendment and Exemption: Addition of In-Containment Refueling Water Storage Tank to Radiation Analyses (LAR-19-003S1)2019-10-0303 October 2019 Supplement to Request for License Amendment and Exemption: Addition of In-Containment Refueling Water Storage Tank to Radiation Analyses (LAR-19-003S1) NL-19-0709, Core Operating Limits Report, Cycle 21, Version 1, SNC Response to NRC Request for Additional Information2019-06-17017 June 2019 Core Operating Limits Report, Cycle 21, Version 1, SNC Response to NRC Request for Additional Information NL-19-0498, License Amendment Request for Technical Specification Improvement to Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable SNC Response to NRC Request for ...2019-04-30030 April 2019 License Amendment Request for Technical Specification Improvement to Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable SNC Response to NRC Request for ... ND-19-0289, Enclosure 1 - Revised Response to Request for Additional Information Question 1b Related to Request for Exemption from Operator Written Examination and Operating Test2019-04-16016 April 2019 Enclosure 1 - Revised Response to Request for Additional Information Question 1b Related to Request for Exemption from Operator Written Examination and Operating Test ND-19-0178, Supplement to Request for Exemption: 10 CFR Part 26 Visitor Access Requirements (Supplement 1)2019-03-0808 March 2019 Supplement to Request for Exemption: 10 CFR Part 26 Visitor Access Requirements (Supplement 1) ND-19-0216, Response to Request for Additional Information Related to Request for Exemption from Operator Written Examination and Operating Test2019-03-0404 March 2019 Response to Request for Additional Information Related to Request for Exemption from Operator Written Examination and Operating Test NL-18-1514, Response to Request for Information Regarding License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum On-Shift.2019-01-31031 January 2019 Response to Request for Information Regarding License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum On-Shift. ND-19-0007, Supplement to Request for Alternative: Preservice and Inservice Inspection Requirements for Specific Valve-to-Pipe Welds (VEGP 3&4-PSI/ISI-ALT-06S1)2019-01-28028 January 2019 Supplement to Request for Alternative: Preservice and Inservice Inspection Requirements for Specific Valve-to-Pipe Welds (VEGP 3&4-PSI/ISI-ALT-06S1) ND-18-1439, Revised Request for License Amendment: Technical Specification Changes for Spent Fuel Pool Level - Low 2 and In-containment Refueling Water Storage Tank (IRWST) Wide Range Level - Low Operability (LAR-18-017R1)2018-12-0303 December 2018 Revised Request for License Amendment: Technical Specification Changes for Spent Fuel Pool Level - Low 2 and In-containment Refueling Water Storage Tank (IRWST) Wide Range Level - Low Operability (LAR-18-017R1) NL-18-1181, Relief Requests VEGP-ISI-RR-05 and VEGP-ISI-RR-06, SNC Response to NRC Request for Additional Information2018-10-17017 October 2018 Relief Requests VEGP-ISI-RR-05 and VEGP-ISI-RR-06, SNC Response to NRC Request for Additional Information ND-18-1058, Supplement to Request for License Amendment and Exemption: Containment Pressure Analysis (LAR-17-043S1)2018-09-28028 September 2018 Supplement to Request for License Amendment and Exemption: Containment Pressure Analysis (LAR-17-043S1) NL-18-1130, Units 1 and 2 - Relief Request VEGP-ISI-RR-03: SNC Response to NRC Request for Additional Information2018-09-26026 September 2018 Units 1 and 2 - Relief Request VEGP-ISI-RR-03: SNC Response to NRC Request for Additional Information NL-18-1179, Response to NRC Request for Additional Information Tornado Missile Risk Evaluator SNC Supplemental2018-09-14014 September 2018 Response to NRC Request for Additional Information Tornado Missile Risk Evaluator SNC Supplemental ND-18-0635, Response to Request for Additional Information Regarding Application of VT-1 Visual Examination Methodology for Preservice Inspection of the Reactor Vessel Nozzle Inner Radius Sections (VEGP 3&4-PSI-ALT-07S3)2018-08-31031 August 2018 Response to Request for Additional Information Regarding Application of VT-1 Visual Examination Methodology for Preservice Inspection of the Reactor Vessel Nozzle Inner Radius Sections (VEGP 3&4-PSI-ALT-07S3) ND-18-1040, Supplement to the Request for License Amendment: Technical Specification Changes to Support Operability During Mode 5 Vacuum Fill Operations (LAR-18-009S1)2018-08-10010 August 2018 Supplement to the Request for License Amendment: Technical Specification Changes to Support Operability During Mode 5 Vacuum Fill Operations (LAR-18-009S1) ND-18-1049, Supplement to Request for License Amendment: Technical Specification Updates for Reactivity Controls and Other Miscellaneous Changes (LAR-17-024S4)2018-08-0909 August 2018 Supplement to Request for License Amendment: Technical Specification Updates for Reactivity Controls and Other Miscellaneous Changes (LAR-17-024S4) NL-18-0815, Tornado Missile Risk Evaluator: SNC Response to NRC Request for Additional Information2018-07-26026 July 2018 Tornado Missile Risk Evaluator: SNC Response to NRC Request for Additional Information NL-18-0915, Enclosures 1, 3, 4 & 5 - Introduction and Overall Summary, Risk Quantification, Defense-in-Depth & Safety Margin and Supplemental Response to NRC Generic Letter 2004-022018-07-10010 July 2018 Enclosures 1, 3, 4 & 5 - Introduction and Overall Summary, Risk Quantification, Defense-in-Depth & Safety Margin and Supplemental Response to NRC Generic Letter 2004-02 ND-18-0646, Supplement to Request for License Amendment and Exemption: Changes to Tier 2* Departure Evaluation Process (LAR-17-037S3)2018-06-18018 June 2018 Supplement to Request for License Amendment and Exemption: Changes to Tier 2* Departure Evaluation Process (LAR-17-037S3) L-16-016, Response to NRC Rais Regarding Generic Letter 2016-012018-05-31031 May 2018 Response to NRC Rais Regarding Generic Letter 2016-01 ND-18-0643, Supplement to Request for License Amendment and Exemption Regarding Ventilation System Changes (LAR-16-030R1S2)2018-05-18018 May 2018 Supplement to Request for License Amendment and Exemption Regarding Ventilation System Changes (LAR-16-030R1S2) 2024-01-22
[Table view] |
Text
B. H. Whitley Southern Nuclear Director Operating Company, Inc.
Regulatory Affairs 3535 Colonnade Parkway Birmingham, AL 35243 Tel 205.992.7079 Fax 205.992.5296 August 9, 2018 Docket Nos.: 52-025 ND-18-1049 52-026 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 Supplement to Request for License Amendment:
Technical Specification Updates for Reactivity Controls and other Miscellaneous Changes (LAR-17-024S4)
Ladies and Gentlemen:
Pursuant to 10 CFR 52.98(c) and in accordance with 10 CFR 50.90, Southern Nuclear Operating Company (SNC) previously requested an amendment to the combined licenses (COLs) for Vogtle Electric Generating Plant (VEGP) Units 3 and 4 (License Numbers NPF-91 and NPF-92, respectively). The requested amendment proposes to depart from approved COL Appendix A, Technical Specifications.
SNC originally submitted this request by SNC letter ND-17-1279, dated July 28, 2017 [ADAMS Accession No. ML17209A755] and supplemented by SNC letter ND-18-0058, dated January 23, 2018 [ADAMS Accession No. ML18023A440], by SNC letter ND-18-0364, dated March 23, 2018 [ADAMS Accession No. ML18082B370], and by SNC letter ND-18-0871, dated June 21, 2018 [ADAMS Accession No. ML18172A154].
Enclosures 1 through 3 were provided with the original License Amendment Request (LAR),
Enclosures 4 and 5 were provided with the first LAR supplement, Enclosures 6 through 8 were provided with the second LAR supplement, and Enclosures 9 through 11 were provided with the third LAR supplement. 2 of this letter provides a response to NRC Staff Request for Additional Information (RAI) #4 issued as final on July 17, 2018 (based on a clarification call held on July 12, 2018 regarding the draft RAI received July 11, 2018) [ADAMS Accession No. ML18197A188].
The information provided in this LAR supplement does not expand the scope of the request or alter the conclusions of the Significant Hazards Consideration Determination or Environmental Considerations submitted in the original LAR-17-024, provided in Enclosure 1 of SNC letter ND-17-1279.
U.S. Nuclear Regulatory Commission ND-18-1049 Page 2 of 4 This letter contains no regulatory commitments. This letter has been reviewed and determined not to contain security-related information.
SNC now requests NRC staff approval of this license amendment by September 14, 2018 to support Operator training updates. Delayed approval of this license amendment could result in a delay in Operator training updates. SNC expects to implement the proposed amendment within thirty days of approval.
In accordance with 10 CFR 50.91, SNC is notifying the State of Georgia of this LAR supplement by transmitting a copy of this letter and its enclosure to the designated State Official Should you have any questions, please contact Mr. Ryan Henderson at (205) 992-6426.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 91h Day of August 2018.
Respectfully submitted, Brian H. Whitley Director, Regulatory Affairs Southern Nuclear Operating Company
Enclosures:
- 1) - 3) (previously submitted with the original LAR, LAR-17 -024, in SNC letter ND-17-1279) 4)- 5) (previously submitted as supplemental information with LAR-17-024S1 in SNC letter ND-18-0058) 6)- 8) (previously submitted as supplemental information with LAR-17-024S2 in SNC letter ND-18-0364)
- 9) -11) (previously submitted as supplemental information with LAR-17-024S3 in SNC letter ND-18-0871)
- 12) Vogtle Electric Generating Plant (VEGP) Units 3 and 4 - Response to NRC Request for Additional Information #4 (LAR-17-024S4)
U.S. Nuclear Regulatory Commission ND-18-1049 Page 3 of 4 cc:
Southern Nuclear Operating Company / Georgia Power Company Mr. S. E. Kuczynski (w/o enclosure)
Mr. D. G. Bost (w/o enclosure)
Mr. M. D. Meier (w/o enclosure)
Mr. D. H. Jones (w/o enclosure)
Mr. J. B. Klecha Mr. G. Chick Mr. D. L. McKinney (w/o enclosure)
Mr. T. W. Yelverton (w/o enclosure)
Mr. B. H. Whitley Ms. C. A. Gayheart Mr. C. R. Pierce Ms. A. G. Aughtman Mr. D. L. Fulton Mr. M. J. Yox Mr. E. W. Rasmussen Mr. J. Tupik Mr. W. A. Sparkman Ms. A. C. Chamberlain Ms. A. L. Pugh Ms. P. Reister Document Services RTYPE: VND.LI.L00 File AR.01.02.06 Nuclear Regulatory Commission Mr. W. Jones (w/o enclosure)
Ms. J. Dixon-Herrity Mr. C. Patel Ms. J. M. Heisserer Mr. B. Kemker Mr. G. Khouri Ms. S. Temple Mr. F. Brown Mr. T.E. Chandler Ms. P. Braxton Mr. T. Brimfield Mr. C. J. Even Mr. A. Lerch State of Georgia Mr. R. Dunn
U.S. Nuclear Regulatory Commission ND-18-1049 Page 4 of 4 Oglethorpe Power Corporation Mr. M. W. Price Ms. A. Whaley Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Mr. L. Oriani (w/o enclosure)
Mr. C. Churchman (w/o enclosure)
Mr. M. Corletti Mr. M. L. Clyde Ms. L. Iller Mr. D. Hawkins Mr. J. Coward Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. A. Matis, Tetra Tech NUS, Inc.
Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.
Mr. S. Roetger, Georgia Public Service Commission Ms. S. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham Mr. R. Grumbir, APOG NDDocumentinBox@duke-energy.com, Duke Energy Mr. S. Franzone, Florida Power & Light
Southern Nuclear Operating Company ND-18-1049 Enclosure 12 Vogtle Electric Generating Plant (VEGP) Units 3 and 4 Response to NRC Request for Additional Information #4 (LAR-17-024S4)
(This Enclosure consists of 3 pages, including this cover page)
ND-18-1049 2 Response to NRC Request for Additional Information #4 (LAR-17-024S4)
Vogtle Electric Generating Plant (VEGP) Units 3 and 4 submitted License Amendment Request LAR-17-024 via Southern Nuclear Operating Company (SNC) letter ND-17-1279 on July 28, 2017. The portion of the LAR identified as change L07 on Page 11 of 39 and Page 24 of 39 of Enclosure 1 proposed a change to Technical Specification (TS) Table 3.3.5-1.
Subsequently, the change was revised by LAR-17-024S3 via SNC letter ND-18-0871 on June 21, 2018 [LAR-17-024S1 and LAR-17-024S2 did not affect this portion of the request].
On July 11, 2018, the NRC transmitted a draft Request for Additional Information for discussion on the July 12, 2018 public call. On July 17, 2018, the NRC issued the draft RAI as final.
QUESTION Title 10 of the Code of Federal Regulations (10 CFR) Section 50.90, Application for amendment of license, construction permit or early site permit, requires, in part, that a license amendment fully describe the changes desired. In addition, 10 CFR 50.36, Technical Specifications, sets forth requirements for technical specifications to be included as part of the operating license for a nuclear power facility. However, the information within the technical evaluation presented in Item L07 of LAR-17-024 is insufficient for the staff to reach a conclusion on the application. The information contained in the technical evaluation appears to be inconsistent with the previously docketed material submitted by SNC. Given a lack of sufficient information in LAR-17-024, staff considered previously docketed material, and seeks clarification of the licensees request related to Item L07.
For example, for Function 4 of Technical Specification (TS) Table 3.3.5-1, LAR 17-024 proposes to change the language in the REQUIRED CHANNELS column from 2 switch sets, to 2. However, the technical evaluation first indicates that there are two sets of redundant switches, one on the Primary Dedicated Safety Panel (PDSP) and one on the Secondary Dedicated Safety Panel (SDSP). Then, in the second paragraph, the applicant indicates that the Protection and Safety Monitoring System design provides two redundant controls on the PDSP, with no corresponding controls on the SPDS. In the case of L07, the staff understands there to be two redundant switches located on the PDSP for Function 4, such that, when either is operated this will cause Function 4 to actuate.
The staff requests that SNC provide additional information that clarifies the licensees request regarding Function 4 stated above. The staff specifically seeks clarity on the operation of the Reactor Trip System Manual Actuation function via the Core Makeup Tank Actuation Input from Engineered Safety Feature Actuation System - Manual function (Function 4 in TS Table 3.3.5-1).
RESPONSE
For the Core Makeup Tank Actuation Input from Engineered Safety Feature Actuation System - Manual" function (Function 4 in TS Table 3.3.5-1), there are redundant switches on the PDSP, either of which will initiate manual core makeup tank injection and also send a reactor trip signal to the reactor trip switchgear breakers. Since either switch will initiate the reactor trip signal, the term switch set does not apply. Therefore, it is proposed to change the REQUIRED CHANNELS column from 2 switch sets to 2.
Page 2 of 3
ND-18-1049 2 Response to NRC Request for Additional Information #4 (LAR-17-024S4)
As discussed in LAR-17-024S3, the changes to Function 1 and Function 2 were withdrawn.
The technical evaluation from LAR-17-024, as supplemented by LAR-17-024S3, is revised in the section below to reflect the above RAI Response. This revision will be provided without tracking the language which is withdrawn or added in order to be as clear as possible. Enclosure 10 to ND-18-0871 (LAR-17-024S3) still provides the appropriate markup to TS Table 3.3.5-1 and reflects this discussion.
CHANGES TO ORIGINAL LAR-17-024 AND LAR-17-024S3 L07 Detailed Description 3.3.5-3 Change Table 3.3.5-1, Function 4, Core Makeup Tank Actuation Input from Engineered Safety Feature Actuation System - Manual Required Channels from LR 2 switch sets to 2.
Technical Evaluation For the Core Makeup Tank Actuation Input from Engineered Safety Feature Actuation System - Manual" function (Function 4 in TS Table 3.3.5-1), there are redundant switches on the PDSP, either of which will initiate manual core makeup tank injection and also send a reactor trip signal to the reactor trip switchgear breakers. Since either switch will initiate the reactor trip signal, the term switch set does not apply. Therefore, it is proposed to change the REQUIRED CHANNELS column from 2 switch sets to 2.
Page 3 of 3