ATTACHMENT TO LICENSE AMENDMENT NO. 145 TO FACILITY COMBINED LICENSE NO. NPF-92 DOCKET NO.52-026 Replace the following pages of the Facility Combined License No. NPF-92 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Facility Combined License No. NPF-92 REMOVE INSERT 7
7 Appendix A to Facility Combined License Nos. NPF-91 and NPF-92 REMOVE INSERT 3.5.5-1 3.5.5-1 3.5.7-3 3.5.7-3
(7) Reporting Requirements (a)
Within 30 days of a change to the initial test program described in UFSAR Section 14, Initial Test Program, made in accordance with 10 CFR 50.59 or in accordance with 10 CFR Part 52, Appendix D, Section VIII, Processes for Changes and Departures, SNC shall report the change to the Director of NRO, or the Directors designee, in accordance with 10 CFR 50.59(d).
(b)
SNC shall report any violation of a requirement in Section 2.D.(3),
Section 2.D.(4), Section 2.D.(5), and Section 2.D.(6) of this license within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Initial notification shall be made to the NRC Operations Center in accordance with 10 CFR 50.72, with written follow up in accordance with 10 CFR 50.73.
(8) Incorporation The Technical Specifications, Environmental Protection Plan, and ITAAC in Appendices A, B, and C, respectively of this license, as revised through Amendment No. 145, are hereby incorporated into this license.
(9) Technical Specifications The technical specifications in Appendix A to this license become effective upon a Commission finding that the acceptance criteria in this license (ITAAC) are met in accordance with 10 CFR 52.103(g).
(10) Operational Program Implementation SNC shall implement the programs or portions of programs identified below, on or before the date SNC achieves the following milestones:
(a)
Environmental Qualification Program implemented before initial fuel load; (b)
Reactor Vessel Material Surveillance Program implemented before initial criticality; (c)
Preservice Testing Program implemented before initial fuel load; (d)
Containment Leakage Rate Testing Program implemented before initial fuel load; (e)
- 1.
The fire protection measures in accordance with Regulatory Guide (RG) 1.189 for designated storage building areas (including adjacent fire areas that could affect the storage area) implemented before initial receipt 7
Amendment No. 145
Technical Specifications PRHR HX - Shutdown, RCS Intact 3.5.5 VEGP Units 3 and 4 3.5.5 - 1 Amendment No. 146 (Unit 3)
Amendment No. 145 (Unit 4) 3.5 PASSIVE CORE COOLING SYSTEM (PXS) 3.5.5 Passive Residual Heat Removal Heat Exchanger (PRHR HX) - Shutdown, Reactor Coolant System (RCS) Intact LCO 3.5.5 The PRHR HX shall be OPERABLE.
APPLICABILITY:
MODE 4 with the RCS cooling provided by the Normal Residual Heat Removal System (RNS).
MODE 5 with the RCS pressure boundary intact and pressurizer level 20%.
- NOTE -
PRHR HX is not required to be OPERABLE in MODE 5 during RCS vacuum fill operations.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One air operated PRHR HX outlet isolation valve inoperable.
A.1 Restore air operated PRHR HX outlet valve to OPERABLE status.
72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> B.
One air operated In-Containment Refueling Water Storage Tank (IRWST) gutter isolation valve inoperable.
B.1 Restore air operated IRWST gutter isolation valve to OPERABLE status.
72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> C.
PRHR HX inlet line noncondensible gas volume not within limit.
C.1 Restore PRHR HX inlet line noncondensible gas volume to within limit.
24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> D.
PRHR HX inoperable for reasons other than Condition A, B, or C.
D.1 Restore PRHR HX to OPERABLE status.
8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> E.
Required Action and associated Completion Time not met.
E.1 Initiate action to be in MODE 5 with the RCS pressure boundary open.
Immediately
Technical Specifications IRWST - Shutdown, MODE 5 3.5.7 VEGP Units 3 and 4 3.5.7 - 3 Amendment No. 146 (Unit 3)
Amendment No. 145 (Unit 4)
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.7.1 For the IRWST and flow paths required to be OPERABLE, the following SRs are applicable:
SR 3.5.6.1 SR 3.5.6.2 SR 3.5.6.4 SR 3.5.6.5 SR 3.5.6.6 SR 3.5.6.7 SR 3.5.6.8 SR 3.5.6.9 SR 3.5.6.10 SR 3.5.6.11 In accordance with applicable SRs SR 3.5.7.2
- NOTE -
Not required to be met during RCS vacuum fill operations.
For the IRWST and flow paths required to be OPERABLE, the following SR is applicable:
SR 3.5.6.3 In accordance with applicable SR