Letter Sequence Approval |
---|
EPID:L-2020-RNW-0038, GE Hitachi Nuclear Energy, Requalification Program for the General Electric Nuclear Test Reactor - December 2021 (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement
Results
Other: ML21053A071, ML21197A137, ML21197A139, ML22020A389, ML22132A272, ML22144A183, ML22144A196, ML22221A195, ML22221A199, ML22294A190, ML22339A140, ML23026A325, ML23033A672, ML23086C025, ML23101A185
|
MONTHYEARML21053A0712020-11-19019 November 2020 Redacted_Application Cover Letter (ML20325A194) Project stage: Other ML20325A1952020-11-19019 November 2020 Environmental Report 2020 Project stage: Request ML21062A2502021-03-11011 March 2021 GE-Hitachi Nuclear Energy Americas, LLC - Receipt and Supplemental Information Needed for Renewal Review of GE-Hitachi Nuclear Energy Americas, LLC Nuclear Test Reactor Facility Operating License No. R-33 Project stage: Approval ML21197A1392021-07-26026 July 2021 GE-Hitachi Nuclear Energy of Americas LLC - Regulatory Audit the Reactor Description, Radiation Protection, and Accidental Analysis in the Operating License Application Project stage: Other ML21197A1372021-07-26026 July 2021 Office of Nuclear Reactor Regulation Regulatory Audit Topics Regarding the Reactor Description, Radiation Protection, and Accident Analysis Described in the Application for License Renewal License No. R-33 General Electric Hitachi Nuclear E Project stage: Other ML21197A1212021-07-26026 July 2021 73-Audit Plan-Rx and Accident Analysis (July 2021) Project stage: Request ML21265A2472021-09-22022 September 2021 GEH - Supplemental Information Supporting GE Nuclear Test Reactor License Renewal Audit Questions and Responses Project stage: Supplement ML21337A2572021-12-0303 December 2021 GE Hitachi Nuclear Energy, Requalification Program for the General Electric Nuclear Test Reactor - December 2021 Project stage: Request ML22014A4202021-12-16016 December 2021 73-GEH PSP Cover Letter for 12-16-2021 Submittal (U) Project stage: Request ML22020A3892022-02-0808 February 2022 GE Hitachi Nuclear Energy Americas, LLC Approval of the Revised Operator Requalification Program for the Nuclear Test Reactor Project stage: Other ML22132A2722022-04-0404 April 2022 2022-04-04 Mjf 22-002 M220058 Security Plan PSP RAI Cover Project stage: Other ML22112A2362022-04-22022 April 2022 GE-Hitachi Nuclear Energy Americas, LLC, Response to Request for Additional Information for Nuclear Test Reactor License Renewal Application Project stage: Request ML22144A1832022-05-26026 May 2022 73-GEH LRA Acceptability for Review (Supplement Provided) Project stage: Other ML22144A1962022-05-26026 May 2022 GE-Hitachi Nuclear Energy Americas LLC - Approval of the Revised Physical Security Plan for the Vallecitos Nuclear Center Project stage: Other ML22221A1992022-08-10010 August 2022 GEH LRA Audit Ntr (R-33) Technical Specifications - Nedo 32765, Rev 4 Project stage: Other ML22221A1952022-08-10010 August 2022 Djh 22-004 M220XXX GEH Ntr TS (Nedo 32765, Rev 4) Project stage: Other ML22258A1182022-09-15015 September 2022 GE Hitachi Nuclear Energy - Response to Request for Public Docketing of Information Relating to GE Nuclear Test Reactor License Renewal Project stage: Request ML22294A1902022-10-28028 October 2022 GE-Hitachi Nuclear Energy Americas Llcrequest for a Section 106 Review Under the National Historic Preservation Act for the Proposed Renewal of Facility Operating License No. R-33 for the Nuclear Test Reactor Project stage: Other ML22339A1402023-01-0303 January 2023 73 GE License Renewal Application Notice of Acceptability for Docketing Letter Project stage: Other ML23027A2102023-01-27027 January 2023 GE-Hitachi Nuclear Energy Americas, LLC, Supplemental Information Supporting GE Nuclear Test Reactor License Renewal Audit Audit Questions and Responses Project stage: Supplement ML23026A3252023-01-27027 January 2023 GE-Hitachi Nuclear Energy Americas, LLC - Report on the Regulatory Audit Nuclear Test Reactor Technical Specifications in Support of the License Renewal Application Review Project stage: Other ML23054A3212023-02-23023 February 2023 GEH Supplemental Information for Ntr License Renewal Application Project stage: Supplement ML23067A4082023-03-0808 March 2023 Email from Anthony Chu, CA Radiation Safety 3.8.23 Re_ Draft NRC Environmental Assessment of the GEH Ntr Re_ State of California Review Project stage: Request ML23033A6722023-03-17017 March 2023 Ge-Hitachi Nuclear Energy Americas LLC - Environmental Assessment and Finding of No Significant Impact Regarding Renewal of Facility Operating License No. R-33 for the GE-Hitachi Nuclear Test Reactor Project stage: Other ML23033A6702023-03-17017 March 2023 GEH EA and Fonsi for License Renewal Project stage: Request ML23033A6712023-03-17017 March 2023 Federal Register Notice - GE-Hitachi Nuclear Energy Americas, LLC, Nuclear Test Reactor Project stage: Request ML23086C0242023-03-24024 March 2023 GE-Hitachi Nuclear Energy Americas, LLC, Nuclear Test Reactor Safety Analysis Report and Technical Specifications Project stage: Request ML23086C0252023-03-24024 March 2023 Enclosure 1: NRC Ntr License Renewal Audit Questions Project stage: Other ML23086C0262023-03-31031 March 2023 Enclosure 2: Nedo 32765, Revision 6, Technical Specifications for the Nuclear Test Reactor Facility R-33 Project stage: Request ML23086C0282023-03-31031 March 2023 Enclosure 4: Nedo 32740, Revision 5, General Electric Nuclear Test Reactor Safety Report (Public) Project stage: Request ML23101A1852023-04-13013 April 2023 GE-Hitachi Nuclear Energy Americas, LLC - Report on the Regulatory Audits Regarding the Renewal of Facility Operating License No. R-33 Project stage: Other ML23128A3482023-06-29029 June 2023 GE-Hitachi Nuclear Energy Americas, LLC Issuance of Renewed Facility Operating License No. R-33 for the Nuclear Test Reactor Project stage: Approval ML23128A3522023-07-0505 July 2023 FRN for Issuance of GEH Renewed Facility Operating License Project stage: Request 2022-08-10
[Table View] |
|
---|
Category:Letter
MONTHYEARML24032A1082024-02-0101 February 2024 GEH Notification of GE Company Stock Beneficial Ownership Filing ML23345A1222023-12-21021 December 2023 Request for Additional Information Regarding the Direct Transfer of Control of Vallecitos Nuclear Center Licenses and Conforming License Amendments ML23338A1312023-12-0404 December 2023 GE-Hitachi Nuclear Energy Americas, LLC, Additional Information to Geha and GNF-A Application for Order Consenting to Indirect Transfer of Control (Reference 1) ML23334A2222023-11-30030 November 2023 GE Hitachi Nuclear Energy - NRC Notice Before Actions Necessary to Accomplish the Indirect Transfers of Control Are Completed ML23283A3292023-11-30030 November 2023 NRC Issuance of Order Consenting to Indirect Transfer of Control of Ge/Geha/Gnfa Licenses ML23279A1322023-11-13013 November 2023 GE Hitachi Nuclear Energy - Vallecitos Nuclear Center, Getr Decommissioning Plan (License Number TR-1, Docket Number 50-70) ML23310A1132023-11-0909 November 2023 FRN-Notice of Consideration of Approval of Direct Transfer of Control of Vallecitos Nuclear Center Licenses Conforming License Amendments Opportunity for a Hearing Transmittal Letter ML23305A0522023-11-0101 November 2023 GE Hitachi Nuclear Energy Additional Supplemental Information - Revised Exhibit H ML23275A1742023-10-26026 October 2023 Acceptance Review of Application for Consent to Direct Transfer of Control of Vallecitos Nuclear Center Licenses and Conforming License Amendments ML23292A3362023-10-19019 October 2023 Northstar Vallecitos, LLC, Supplemental Information - Financial Qualifications ML23276B3952023-10-13013 October 2023 the U.S. Nuclear Regulatory Commission Staff Assessment of Ge/Geha/Gnfa Reponses to Acceptance Observations Application for the U.S. Nuclear Regulatory Commission Consent to Indirect Transfer of Licenses ML23269A1062023-09-26026 September 2023 GEH Description of Process for Decommissioning the Vallecitos Nuclear Center (Vnc) Shutdown Reactors - Getr Decommissioning Plan ML23261A5922023-09-15015 September 2023 GE-Hitachi Nuclear Energy Americas, LLC, License Termination Plan for the Vallecitos Boiling Water Reactor License DPR-1 ML23257A2492023-09-14014 September 2023 Cultural Resources Report ML23248A2322023-09-0505 September 2023 GE Hitachi Nuclear Energy - Supplemental Information - Proposed Conforming Amendments & License Conditions ML23244A2472023-09-0101 September 2023 GE-Hitachi Nuclear Energy Americas, LLC and Northstar Vallecitos, LLC, Application for Consent to Direct Transfers of Control of Licenses and Related Conforming License Amendments ML23229A5122023-08-17017 August 2023 GE-Hitachi Nuclear Energy Americas, LLC, Response to NRC Staff Observations Enclosed with NRC Acceptance Letter (Reference 2) Related to GE, Geha and GNF-A Application (Reference 1) ML23191A8592023-07-27027 July 2023 Acceptance Letter GE GNFA and Geha Application for NRC Consent to Indirect Transfer of Licenses ML23150A0962023-05-30030 May 2023 GE Hitachi Nuclear Energy, Nuclear Center (Vnc) Organization Change ML23152A1162023-05-30030 May 2023 Application for Order Consenting to Indirect Transfer of Control with Respect to Reactor Licenses, Materials Licenses, and Export Licenses, and Notification Regarding Other Approvals IR 05000018/20230012023-05-0505 May 2023 GE Hitachi Nuclear Energy - NRC Inspection Report 05000018/2023001, 05000070/2023001, and 05000183/2023001 ML23123A0752023-04-12012 April 2023 Response to NRC Request for Inspection Documents ML23104A4172023-03-31031 March 2023 GNF-AGEH Financial Assurance of Decommissioning Funds - Surety Bond Riders Cover Letter and Affidavit ML23090A1802023-03-31031 March 2023 GEH - Financial Assurance Status Reports ML23083B3402023-03-24024 March 2023 GEH Annual Shutdown Reactor Reports for the Year 2022 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23054A3332023-02-23023 February 2023 GEH Notification of GE Company Stock Beneficial Ownership Filing ML23018A2832023-01-19019 January 2023 GE-Hitachi Nuclear Energy Americas, LLC Response to NRC Inspection Report 050-00018/2022-002; 050-00070/2022-002; 050-00183/2022-002 and Notice of Violation ML22339A1742022-12-13013 December 2022 GE Hitachi Nuclear Energy NRC Inspection Report 05000018/2022002 05000070/2022002 and 05000183/2022002 IR 05000018/20220022022-12-13013 December 2022 GE Hitachi Nuclear Energy NRC Inspection Report 05000018/2022002 05000070/2022002 and 05000183/2022002 ML22335A5262022-12-0101 December 2022 (Vnc) Organization Change ML22326A3522022-11-22022 November 2022 Limited Post Shutdown Decommissioning Activities Report Update ML22300A2102022-10-27027 October 2022 GE-Hitachi Nuclear Energy Americas, LLC, Nuclear Center (Vnc) Submittal of Radiological Emergency Plan (REP) Revision 2 ML22265A0442022-09-26026 September 2022 GE Hitachi Vallecitos Nuclear Center, U.S. Nuclear Regulatory Commission'S Analysis of GE Hitachi'S Decommissioning Funding Status Reports for the Shutdown Power Reactors Vallecitos Boiling Water Reactor (License No. DPR-1, Docket No. 50-18 ML22264A3252022-09-21021 September 2022 Decommissioning Limited Post Shutdown Decommissioning Activities Report ML22249A3652022-09-0606 September 2022 GEH Notification of GE Company Stock Beneficial Ownership Filing ML22104A1852022-04-14014 April 2022 GE-Hitachi Nuclear Energy Americas, LLC, Vallecitos Nuclear Center (Vnc) Organization Change IR 05000018/20220012022-04-12012 April 2022 GE Hitachi Nuclear Energy - NRC Inspection Report 050 00018/2022-001, 050 00070/2022 001, and 050-00183/2022-001 ML22066A5692022-04-0808 April 2022 GEH Vallecitos Nuclear Center, NRCs Response to the GEH Description of Process for Decommissioning the Shutdown Reactors ML22089A0842022-03-30030 March 2022 GE Hitachi Nuclear Energy - Financial Assurance Status Reports ML22089A2232022-03-25025 March 2022 GEH Annual Shutdown Reactor Reports for the Year 2021 ML22084A5782022-03-23023 March 2022 GNF-A/GEH Financial Assurance of Decommissioning Funds - Surety Bond Riders Cover Letter and Affidavit ML22080A1322022-03-21021 March 2022 GE-Hitachi Nuclear Energy Americas, LLC, NRC Request for Inspection Documents 2024-02-01
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML0724002172007-10-22022 October 2007 Issuance of the Conforming Amendments Transfer of Ownership to GE- Hitachi Nuclear Energy Americas, LLC ML0715006182007-09-0606 September 2007 Conforming Amendments to Facility Licenses Nos. DPR-1, TR-1, R-33, and DR-10 ML0713505851992-09-30030 September 1992 General Electric Co Test Reactor Amendment 16 to License TR-1 ML19008A0221970-04-15015 April 1970 General Electric Company possession-only AEC License for the Deactivated EVESR Facility (License Numbers DR-10, Docket Number: 50-183) 2007-09-06
[Table view] |
Text
June 29, 2023 Mr. Carlos Martinez, Site Manager GE Hitachi Nuclear Energy Vallecitos Nuclear Center 6705 Vallecitos Road Sunol, CA 94586
SUBJECT:
GE-HITACHI NUCLEAR ENERGY AMERICAS, LLC - ISSUANCE OF RENEWED FACILITY OPERATING LICENSE NO. R-33 FOR THE NUCLEAR TEST REACTOR (EPID L-2020-RNW-0038)
Dear Mr. Martinez:
The U.S. Nuclear Regulatory Commission (NRC) has issued the enclosed Renewed Facility Operating License No. R-33 for the GE-Hitachi Nuclear Energy Americas, LLC (GEH) Nuclear Test Reactor (NTR) in response to the application for license renewal dated November 19, 2020, as supplemented by letters dated September 22, December 3, and December 16, 2021; April 4, April 22, and September 15, 2022; and January 27, March 24, April 21, April 27, and June 15, 2023. The renewed facility operating license is effective on the date of issuance, and shall expire at midnight, 20 years from the date of issuance, unless terminated sooner.
In accordance with agency practice, the renewed facility operating license issued by the NRC has restated the license in its entirety, incorporating all changes and amendments made since the issuance of the original license, as appropriate. Also enclosed with the renewed facility operating license is the safety evaluation report that documents the NRCs license renewal review. A Notice of Issuance for Renewed Facility Operating License No. R-33 has been sent to the Office of the Federal Register for publication. The Environmental Assessment and Finding of No Significant Impact for the renewal of the NTR license was published in the Federal Register on March 22, 2023 (88 FR 17274), with a minor correction published on June 1, 2023 (88 FR 35933).
C. Martinez If you have any questions, please contact me at (301) 415-3724 or by email at Duane.Hardesty@nrc.gov.
Sincerely, Duane A. Hardesty, Senior Project Manager Non-Power Production and Utilization Facility Licensing Branch Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Docket No.50-073 License No. R-33
Enclosures:
- 1. Renewed Facility Operating License No. R-33
- 2. Safety Evaluation Report cc w/enclosures: GovDelivery Subscribers
Pkg: ML23128A355 Ltr: ML23128A348 App. A (TS): ML23128A354 SER: ML23128A353 FRN: ML23128A352 NRR-106 OFFICE NRR/DANU/UNPL/PM NRR/DANU/UNPL/LA OGC NRR/DANU/UNPL/BC NAME DHardesty NParker JWachutka JBorromeo DATE 5/9/2023 5/24/2023 6/22/2023 6/23/2023 OFFICE NRR/DANU/D NRR/D NRR/DANU/UNPL/PM NAME MShams AVeil DHardesty DATE 6/26/2023 6/29/2023 6/29/2023 GE-HITACHI NUCLEAR ENERGY AMERICAS, LLC DOCKET NO. 50-73 RENEWED FACILITY OPERATING LICENSE FOR THE NUCLEAR TEST REACTOR License No. R-33
- 1. The U.S. Nuclear Regulatory Commission (the Commission or NRC) has found that:
A. The application for license renewal filed by GE-Hitachi Nuclear Energy Americas, LLC (the licensee) on November 19, 2020, as supplemented on September 22, December 3, and December 16, 2021; April 4, April 22, and September 15, 2022; and January 27, March 24, April 21, April 27, and June 15, 2023 (the application), complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations as set forth in Title 10 of the Code of Federal Regulations (10 CFR) Chapter I; B. Construction of the Nuclear Test Reactor (the facility, the reactor, or NTR) was completed in substantial conformity with Construction Permit No. CPRR-19 dated October 24, 1957, the provisions of the Act, and the rules and regulations of the Commission; C. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; D. There is reasonable assurance (i) that the activities authorized by this license can be conducted without endangering the health and safety of the public and (ii) that such activities will be conducted in compliance with the Commissions regulations; E. The licensee is technically and financially qualified to engage in the activities authorized by this license in accordance with the rules and regulations of the Commission; F. The licensee has satisfied the applicable provisions of 10 CFR Part 140, Financial Protection Requirements and Indemnity Agreements, of the Commissions regulations; G. The issuance of this license will not be inimical to the common defense and security or to the health and safety of the public; H. The issuance of this license is in accordance with 10 CFR Part 51, Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions, of the Commissions regulations and all applicable requirements have been satisfied; and Enclosure 1
I. The receipt, possession, and use of byproduct and special nuclear materials as authorized by this license will be in accordance with the Commissions regulations in 10 CFR Part 30, Rules of General Applicability to Domestic Licensing of Byproduct Material, and 10 CFR Part 70, Domestic Licensing of Special Nuclear Material.
- 2. Accordingly, Facility Operating License No. R-33 is hereby renewed in its entirety to read as follows:
A. This license applies to the NTR, which is owned by GE-Hitachi Nuclear Energy Americas, LLC and located at its Vallecitos Nuclear Center in Alameda County, California, and described in the application for license renewal dated November 19, 2020, as supplemented.
B. Subject to the conditions and requirements incorporated herein, the Commission hereby licenses GE-Hitachi Nuclear Energy Americas, LLC:
(1) Pursuant to Section 104c of the Act and 10 CFR Part 50, Domestic Licensing of Production and Utilization Facilities, to possess, use, and operate the reactor as a utilization facility at the designated location in Alameda County, California, in accordance with the procedures and limitations described in the application and set forth in this license.
(2) Pursuant to the Act and 10 CFR Part 70, to receive, possess, and use in connection with the operation of the reactor:
- a. but not separate, up to 4 kilograms of contained uranium-235 of an enrichment of 20 percent or greater in the isotope uranium-235, in the form of in-core reactor fuel;
- b. but not separate, up to 350 grams of contained uranium-235, that is not to be used as in-core fuel. This material can be used in the reactor cell, south cell, north room, and control room but not in the experimental facilities of the NTR.
- c. but not separate, such special nuclear material as may be produced by the operation of the reactor.
(3) Pursuant to the Act and 10 CFR Part 30, to receive, possess, and use in connection with the operation of the facility:
- a. up to 2,000 curies of either activated solids as contained in such items as encapsulating materials, structural material and irradiated components;
- b. up to 0.2-curie radium-beryllium sealed startup source, and up to 0.03 curies of byproduct materials, in the form of sealed sources, for instrument calibration and source checks; and
- c. but not to separate (except for byproduct material produced as allowed for experiments), such byproduct material as may be produced by the operation of the reactor.
C. This license shall be deemed to contain and is subject to the conditions specified in 10 CFR Parts 20, 30, 50, 51, 55, 70, and 73 of the Commissions regulations; is subject to all applicable provisions of the Act, and to the rules, regulations, and orders of the Commission now, or hereafter in effect, and to the additional conditions specified below:
(1) Maximum Power Level The licensee is authorized to operate the reactor at steady-state power levels not in excess of 100 kilowatts (thermal) in accordance with the limitations in the Technical Specifications.
(2) Technical Specifications The Technical Specifications contained in Appendix A are hereby incorporated in their entirety in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
(3) Physical Security Plan The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security plan, including amendments and changes made pursuant to the authority of 10 CFR 50.54, Conditions of licenses, paragraph (p). The approved physical security plan, entitled VNC Site Physical Security Plan, dated April 4, 2022, consists of documents withheld from public disclosure pursuant to 10 CFR 73.21, Protection of Safeguards Information: Performance requirements.
(4) GE-Hitachi Nuclear Energy Americas, LLC, as stated in the General Electric Companys (GEs) application dated January 19, 2007, and supplemented on January 25, 2007, February 23, 2007, March 2, 2007, March 26, 2007, May 16, 2007, May 18, 2007, June 4, 2007, July 6, 2007, and August 9, 2007, will abide by all commitments and representations previously made by GE with respect to the license. These include, but are not limited to, maintaining decommissioning records, implementing decontamination activities, and eventually decommissioning the facility.
(5) The Manager of the Vallecitos Nuclear Center, the Vice-President, Reactor Facility Safety and Security of GE-Hitachi Nuclear Energy Americas, LLC, and the Manager of GE-Hitachi Nuclear Energy Americas, LLC shall be U.S. citizens.
These individuals shall have the responsibility and exclusive authority to ensure and shall ensure that the business and activities of GE-Hitachi Nuclear Energy Americas, LLC, with respect to this license, are at all times conducted in a manner consistent with the protection of the public health and safety and the common defense and security.
(6) The commitments/representations made in the GEs application dated January 19, 2007, and supplemented on January 25, 2007, February 23, 2007, March 2, 2007, March 26, 2007, May 16, 2007, May 18, 2007, June 4, 2007, July 6, 2007, and August 9, 2007, regarding reporting relationships and authority over safety and security issues and compliance with NRC requirements shall be adhered to and not be modified without the prior written consent from the Director, Office of Nuclear Reactor Regulation, or designee.
(7) GE-Hitachi Nuclear Energy Americas, LLC shall cause to be transmitted to the Director, Office of Nuclear Reactor Regulation within 30 days of filing with the U.S. Securities and Exchange Commission (SEC), any schedule 13D or 13G filed pursuant to the Securities Exchange Act of 1934 that discloses beneficial ownership of a registered class of General Electric stock.
D. This license is effective as of the date of its issuance and shall expire at midnight, 20 years from its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Andrea D. Digitally signed by Andrea D. Veil Veil Date: 2023.07.05 14:45:51 -04'00' Andrea D. Veil, Director Office of Nuclear Reactor Regulation
Attachment:
Appendix A, Technical Specifications Date of Issuance: June 29, 2023