Letter Sequence Request |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement
Results
Other: ML21053A071, ML21197A137, ML21197A139, ML22020A389, ML22132A272, ML22144A183, ML22144A196, ML22221A195, ML22221A199, ML22294A190, ML22339A140, ML23026A325, ML23033A672, ML23086C025, ML23101A185
|
MONTHYEARML21053A0712020-11-19019 November 2020 Redacted_Application Cover Letter (ML20325A194) Project stage: Other ML21062A2502021-03-11011 March 2021 GE-Hitachi Nuclear Energy Americas, LLC - Receipt and Supplemental Information Needed for Renewal Review of GE-Hitachi Nuclear Energy Americas, LLC Nuclear Test Reactor Facility Operating License No. R-33 Project stage: Approval ML21197A1392021-07-26026 July 2021 GE-Hitachi Nuclear Energy of Americas LLC - Regulatory Audit the Reactor Description, Radiation Protection, and Accidental Analysis in the Operating License Application Project stage: Other ML21197A1372021-07-26026 July 2021 Office of Nuclear Reactor Regulation Regulatory Audit Topics Regarding the Reactor Description, Radiation Protection, and Accident Analysis Described in the Application for License Renewal License No. R-33 General Electric Hitachi Nuclear E Project stage: Other ML21197A1212021-07-26026 July 2021 73-Audit Plan-Rx and Accident Analysis (July 2021) Project stage: Request ML21265A2472021-09-22022 September 2021 GEH - Supplemental Information Supporting GE Nuclear Test Reactor License Renewal Audit Questions and Responses Project stage: Supplement ML21337A2572021-12-0303 December 2021 GE Hitachi Nuclear Energy, Requalification Program for the General Electric Nuclear Test Reactor - December 2021 Project stage: Request ML22014A4202021-12-16016 December 2021 73-GEH PSP Cover Letter for 12-16-2021 Submittal (U) Project stage: Request ML22020A3892022-02-0808 February 2022 GE Hitachi Nuclear Energy Americas, LLC Approval of the Revised Operator Requalification Program for the Nuclear Test Reactor Project stage: Other ML22055A6222022-02-24024 February 2022 GE-Hitachi Nuclear Energy Americas, LLC, Vallecitos Nuclear Center (Vnc) Radiological Emergency Plan (REP) Revision Project stage: Request ML22132A2722022-04-0404 April 2022 2022-04-04 Mjf 22-002 M220058 Security Plan PSP RAI Cover Project stage: Other ML22112A2362022-04-22022 April 2022 GE-Hitachi Nuclear Energy Americas, LLC, Response to Request for Additional Information for Nuclear Test Reactor License Renewal Application Project stage: Request ML22144A1832022-05-26026 May 2022 73-GEH LRA Acceptability for Review (Supplement Provided) Project stage: Other ML22144A1962022-05-26026 May 2022 GE-Hitachi Nuclear Energy Americas LLC - Approval of the Revised Physical Security Plan for the Vallecitos Nuclear Center Project stage: Other ML22221A1992022-08-10010 August 2022 GEH LRA Audit Ntr (R-33) Technical Specifications - Nedo 32765, Rev 4 Project stage: Other ML22221A1952022-08-10010 August 2022 Djh 22-004 M220XXX GEH Ntr TS (Nedo 32765, Rev 4) Project stage: Other ML22258A1182022-09-15015 September 2022 GE Hitachi Nuclear Energy - Response to Request for Public Docketing of Information Relating to GE Nuclear Test Reactor License Renewal Project stage: Request ML22294A1902022-10-28028 October 2022 GE-Hitachi Nuclear Energy Americas Llcrequest for a Section 106 Review Under the National Historic Preservation Act for the Proposed Renewal of Facility Operating License No. R-33 for the Nuclear Test Reactor Project stage: Other ML22339A1412023-01-0303 January 2023, 4 January 2023 Package-GEH FRN for Acceptability for Docketing Project stage: Request ML22339A1402023-01-0303 January 2023 73 GE License Renewal Application Notice of Acceptability for Docketing Letter Project stage: Other ML23027A2092023-01-27027 January 2023 GE-Hitachi Nuclear Energy Americas, LLC, Supplemental Information Supporting GE Nuclear Test Reactor License Renewal Audit – Audit Questions and Responses Project stage: Request ML23027A2102023-01-27027 January 2023 GE-Hitachi Nuclear Energy Americas, LLC, Supplemental Information Supporting GE Nuclear Test Reactor License Renewal Audit Audit Questions and Responses Project stage: Supplement ML23026A3252023-01-27027 January 2023 GE-Hitachi Nuclear Energy Americas, LLC - Report on the Regulatory Audit Nuclear Test Reactor Technical Specifications in Support of the License Renewal Application Review Project stage: Other ML23054A3212023-02-23023 February 2023 GEH Supplemental Information for Ntr License Renewal Application Project stage: Supplement ML23067A4082023-03-0808 March 2023 Email from Anthony Chu, CA Radiation Safety 3.8.23 Re_ Draft NRC Environmental Assessment of the GEH Ntr Re_ State of California Review Project stage: Request ML23033A6722023-03-17017 March 2023 Ge-Hitachi Nuclear Energy Americas LLC - Environmental Assessment and Finding of No Significant Impact Regarding Renewal of Facility Operating License No. R-33 for the GE-Hitachi Nuclear Test Reactor Project stage: Other ML23033A6702023-03-17017 March 2023 GEH EA and Fonsi for License Renewal Project stage: Request ML23033A6712023-03-17017 March 2023 Federal Register Notice - GE-Hitachi Nuclear Energy Americas, LLC, Nuclear Test Reactor Project stage: Request ML23086C0252023-03-24024 March 2023 Enclosure 1: NRC Ntr License Renewal Audit Questions Project stage: Other ML23086C0232023-03-24024 March 2023, 31 March 2023 GE Nuclear Test Reactor Safety Analysis Report and Technical Specifications Project stage: Request ML23086C0242023-03-24024 March 2023 GE-Hitachi Nuclear Energy Americas, LLC, Nuclear Test Reactor Safety Analysis Report and Technical Specifications Project stage: Request ML23086C0262023-03-31031 March 2023 Enclosure 2: Nedo 32765, Revision 6, Technical Specifications for the Nuclear Test Reactor Facility R-33 Project stage: Request ML23101A1852023-04-13013 April 2023 GE-Hitachi Nuclear Energy Americas, LLC - Report on the Regulatory Audits Regarding the Renewal of Facility Operating License No. R-33 Project stage: Other ML23128A3482023-06-29029 June 2023 GE-Hitachi Nuclear Energy Americas, LLC Issuance of Renewed Facility Operating License No. R-33 for the Nuclear Test Reactor Project stage: Approval ML23128A3552023-06-29029 June 2023, 30 June 2023, 5 July 2023 GEH Ntr Lr Issuance Package Project stage: Request ML23128A3522023-07-0505 July 2023 FRN for Issuance of GEH Renewed Facility Operating License Project stage: Request 2022-05-26
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000018/20240022024-10-29029 October 2024 GE Hitachi Nuclear Energy - NRC Inspection Report 05000018/2024-002, 05000070/2024002, 05000183/2024002, and 050-00073/2024002 ML24299A0682024-10-25025 October 2024 GEH Notification of GE Company Stock Beneficial Ownership Filing ML24284A1182024-10-10010 October 2024 GEH - Notification of GE Company Stock Beneficial Ownership Filing ML24271A1572024-09-27027 September 2024 Notification of Planned Closing, Trust Fund Balance at Transfer and Proof of Insurance ML24270A2242024-09-26026 September 2024 License Amendment Request - Historic and Cultural Resources Review Vallecitos Boiling Water Reactor and General Electric Test Reactor ML24250A2032024-09-19019 September 2024 GE Hitachi Nuclear Energy - NRC (Public) Physical Security Inspection Report 07000754 2024401 (EA-24-050) ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24165A2812024-06-13013 June 2024 Northstar Vallecitos, LLC, Documentary Evidence of Insurance Vallecitos Nuclear Center ML24162A3272024-06-10010 June 2024 Northstar Vallecitos, LLC, Request for NRC Authorization of Reviewing Official ML24157A0882024-06-0505 June 2024 GE-Hitachi Nuclear Energy Americas, LLC, Vallecitos Nuclear Center (Vnc) Organization Change ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000018/20240012024-05-29029 May 2024 GE Hitachi Nuclear Energy - NRC Inspection Report 05000018/2024-001, 050 00070/2024-001, 050-00183/2024-001, and 050-00073/2024-001 ML24149A3222024-05-22022 May 2024 GE Hitachi Nuclear Energy - NRC Inspection Report 07000754/2024001 Cover Letter (Public) ML24124A1452024-05-0303 May 2024 GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR 73.1205- Written Follow-up Report for Physical Security Event EN 56934 ML24039A0802024-04-25025 April 2024 GE-Hitachi Nuclear Energy Americas LLC - Exemption from Select Requirements of 10 CFR Part 73 ML24039A0192024-04-25025 April 2024 Order Approving Transfer of the Vallecitos Nuclear Center Licenses and Conforming License Amendments ML24095A2222024-04-0404 April 2024 (Vnc) - Request for NRC Authorization of Reviewing Official ML24088A2392024-03-28028 March 2024 GE-Hitachi Nuclear Energy Americas, LLC, NRC Notice Before Actions Necessary to Accomplish the Indirect Transfers of Control Are Completed - Step Two ML24051A1802024-02-22022 February 2024 Boiling Water Reactor License Termination Plan Request for Additional Information - Letter ML24054A0282024-02-20020 February 2024 GEH Report of Revised Vallecitos Nuclear Center (Vnc) Site Facility Physical Security Plan (PSP) Revision, Dated April 4, 2022, Revision 2 Issued January 18, 2023 ML24046A1722024-02-15015 February 2024 (Vnc) Effluent Monitoring and Environmental Surveillance Programs 2023 Annual Report ML24032A1082024-02-0101 February 2024 GEH Notification of GE Company Stock Beneficial Ownership Filing ML24022A3232024-01-22022 January 2024 Geha/Northstar Response to NRC Request for Additional Information Regarding Direct Transfer of Vnc Licenses IR 05000018/20230022024-01-0909 January 2024 GE Hitachi Nuclear Energy - NRC Inspection Report 05000018/2023002, 05000070/2023002, and 05000183/2023002 ML24004A1632024-01-0404 January 2024 (Vnc) Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23345A1222023-12-21021 December 2023 Request for Additional Information Regarding the Direct Transfer of Control of Vallecitos Nuclear Center Licenses and Conforming License Amendments ML23345A0812023-12-11011 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A1312023-12-0404 December 2023 GE-Hitachi Nuclear Energy Americas, LLC, Additional Information to Geha and GNF-A Application for Order Consenting to Indirect Transfer of Control (Reference 1) ML23283A3292023-11-30030 November 2023 NRC Issuance of Order Consenting to Indirect Transfer of Control of Ge/Geha/Gnfa Licenses ML23334A2222023-11-30030 November 2023 GE Hitachi Nuclear Energy - NRC Notice Before Actions Necessary to Accomplish the Indirect Transfers of Control Are Completed ML23279A1322023-11-13013 November 2023 GE Hitachi Nuclear Energy - Vallecitos Nuclear Center, Getr Decommissioning Plan (License Number TR-1, Docket Number 50-70) ML23310A1132023-11-0909 November 2023 FRN-Notice of Consideration of Approval of Direct Transfer of Control of Vallecitos Nuclear Center Licenses Conforming License Amendments Opportunity for a Hearing Transmittal Letter ML23305A0522023-11-0101 November 2023 GE Hitachi Nuclear Energy Additional Supplemental Information - Revised Exhibit H ML23275A1742023-10-26026 October 2023 Acceptance Review of Application for Consent to Direct Transfer of Control of Vallecitos Nuclear Center Licenses and Conforming License Amendments ML23292A3362023-10-19019 October 2023 Northstar Vallecitos, LLC, Supplemental Information - Financial Qualifications ML23276B3952023-10-13013 October 2023 the U.S. Nuclear Regulatory Commission Staff Assessment of Ge/Geha/Gnfa Reponses to Acceptance Observations Application for the U.S. Nuclear Regulatory Commission Consent to Indirect Transfer of Licenses ML23269A1062023-09-26026 September 2023 GEH Description of Process for Decommissioning the Vallecitos Nuclear Center (Vnc) Shutdown Reactors - Getr Decommissioning Plan ML23261A5922023-09-15015 September 2023 GE-Hitachi Nuclear Energy Americas, LLC, License Termination Plan for the Vallecitos Boiling Water Reactor License DPR-1 ML23257A2492023-09-14014 September 2023 Cultural Resources Report ML23248A2322023-09-0505 September 2023 GE Hitachi Nuclear Energy - Supplemental Information - Proposed Conforming Amendments & License Conditions ML23244A2472023-09-0101 September 2023 GE-Hitachi Nuclear Energy Americas, LLC and Northstar Vallecitos, LLC, Application for Consent to Direct Transfers of Control of Licenses and Related Conforming License Amendments ML23230A3932023-08-18018 August 2023 GEH - SNM-960 Triennial Update - Facility Decommissioning Funding Plan (DFP) NRC Request for Additional Review ML23229A5122023-08-17017 August 2023 GE-Hitachi Nuclear Energy Americas, LLC, Response to NRC Staff Observations Enclosed with NRC Acceptance Letter (Reference 2) Related to GE, Geha and GNF-A Application (Reference 1) ML23191A8592023-07-27027 July 2023 Acceptance Letter GE GNFA and Geha Application for NRC Consent to Indirect Transfer of Licenses ML23177A0892023-06-26026 June 2023 Geha and GNF-A Application for Indirect Transfer of Control - Revision 2 ML23171A9762023-06-20020 June 2023 Geha and GNF-A Application for Indirect Transfer of Control - Revision 1 ML23156A2612023-06-16016 June 2023 Notification of Detailed Review of Decommissioning Funding Plan, Revision 5, for the Vallecitos Nuclear Center ML23150A0962023-05-30030 May 2023 GE Hitachi Nuclear Energy, Nuclear Center (Vnc) Organization Change ML23152A1162023-05-30030 May 2023 Application for Order Consenting to Indirect Transfer of Control with Respect to Reactor Licenses, Materials Licenses, and Export Licenses, and Notification Regarding Other Approvals IR 05000018/20230012023-05-0505 May 2023 GE Hitachi Nuclear Energy - NRC Inspection Report 05000018/2023001, 05000070/2023001, and 05000183/2023001 2024-09-27
[Table view] |
Text
SAfl!6UldDS INFORMATION PURUSANT TO :t8 FR 73.21 SeE1:1rity RelateEl IAfermation Withhold f1urn Public Disdost:11 e pt11!tllH'lt to 10 CFR 2.390 When separated from both Safeguards Information enclosures and Security-Related Information enclosures, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.
GE Hitachi Nuclear Energy Matt Feyrer HITACHI Site Manager, Vallecitos Nuclear Center
Sunol CA 94586 USA T (910) 233-6121 matt.feyrer@ge.com M210160 December 16, 2021 Director, Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852
Subject:
GEH Revised VNC Site Physical Security Plan (PSP)
References:
- 1) NRC License R-33, Docket 05000073
- 2) NRC License SNM-960, Docket 07000754
- 3) NRC Confirmatory Order EA-14-144, April 22, 2015
- 4) Letter M.J. Feyrer (GEH) to Director, Office of Nuclear Safety and Safeguards, GEH Revised VNC Site Physical Security Plan (PSP), March 20, 2019 GE Hitachi Nuclear Energy Americas LLC (GEH) hereby submits a revised Vallecitos Nuclear Center (VNC) Site Physical Security Plan dated December 10, 2021, pursuant to 10 CFR 50.54 and 10 CFR 70.32. This revision replaces in its entirety the previous plan dated March 20, 2019. consists of the revised VNC Site PSP. It has been completely rewritten and reformatted to generally align with the guidance provided in Regulatory Guide 5.59, Standard Format and Content for a Licensee Physical Security Plan for the Protection of Special Nuclear Material of Moderate or Low Strategic Significance. A comparison table has been included in to itemize substantive changes. Bounding and clarity has been enhanced throughout by cross-referencing each requirement in the PSP to its basis (i.e., regulation, license, NRC Order). This information is provided in tabular form in Enclosure 2. provides descriptions and evaluations of changes to the plan pursuant to 10 CFR 50.54(p)(2) and 10 CFR 70.32(e). GEH Internal review has concluded that some changes in this PSP revision constitute marginally reduction in effectiveness (RIE) of the PSP and are being submitted for NRC prior approval. RIE changes have been evaluated in Enclosure 3.
Enclosures 1, and 3 contain Safeguards Information which GEH requests be withheld from public disclosure pursuant to 10 CFR 2.390 and 73.21. contains security-sensitive information which GEH requests be withheld from public disclosure pursuant to 10 CFR 2.390 and NRC RIS 2005-31.
This letter is being submitted under oath or affirmation according to RIS 01-018. Upon removal of Enclosures 1, 2, and 3, this transmittal letter may be decontrolled.