IR 05000390/2022005

From kanterella
(Redirected from ML22242A190)
Jump to navigation Jump to search
Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2022005 and 05000391/2022005 - Final
ML22242A190
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 08/31/2022
From: Wesley Deschaine
NRC/RGN-II/DRP/RPB5
To: Jim Barstow
Tennessee Valley Authority
References
IR 2022005
Download: ML22242A190 (6)


Text

August 30, 2022

SUBJECT:

UPDATED INSPECTION PLAN FOR WATTS BAR NUCLEAR PLANT, UNITS 1 AND 2 - REPORT 05000390/2022005 AND 05000391/2022005

Dear Mr. Barstow:

The enclosed inspection plan lists the inspections scheduled through June 30, 2024, for Watts Bar Nuclear Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

Beginning on January 1, 2023, the engineering inspection frequency will transition from a triennial (3-year) to a quadrennial (4-year) cycle. The new engineering inspection program will consist of a Comprehensive Engineering Team Inspection (CETI)1and three Focused Engineering Inspections (FEIs) that will be performed in each quadrennial cycle. For the cycle beginning in 2023, the FEIs will be: Fire Protection Team Inspection, Commercial Grade Dedication and an engineering inspection that reviews age-related degradation and management2.

In response to the COVID-19 public health emergency (PHE), the NRC adjusted inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the Reactor Oversight Process (ROP). While the PHE continues, overall conditions throughout the country support performance of our inspection and oversight activities to return to normal onsite presence by our resident and region-based inspectors and completion of nominal baseline inspection samples. We continue to monitor site-specific conditions and as discussed in our November 2, 2021 memo, Implementation of Inspection Programs Following Re-Entry from the Public Health Emergency for the Reactor Safety Program (ML21295A302), it may be necessary to alter how and when we perform our inspection and oversight activities as we balance the importance of protecting the health and safety of our staff with the need to conduct effective oversight that supports the NRCs critical safety mission.

___________________________________________________

1Aspects of the Design Basis Assurance Inspection (DBAI), Evaluations of Changes, Tests, & Experiments, and Heat Sink inspections will be included in the CETI inspection. Attached Report 22 will reference DBAI procedure until the CETI procedure is made publicly available. Previously scheduled Evaluation of Changes, Tests, & Experiments and Heat Sink inspections have been cancelled and removed from Report 22.

2The age-related degradation and management procedure is under development and will be publicly available by the end of calendar year 2022. For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.

In addition to the ROP baseline inspections, the Regional Administrator has approved the staffs plan to conduct Inspection Procedure (IP) 50001, Steam Generator Replacement Inspection, IP 92702, Follow-Up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, and Orders, and IP 92722, Follow-Up Inspection for Any Severity Level I or II Traditional Enforcement Violation or for Two or More Severity Level III Traditional Enforcement Violations in a 12-Month Period, at your facility.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (404) 997-4624 with any questions you may have regarding this letter.

Sincerely, Wesley D. Deschaine, Acting Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos. 05000390 and 05000391 License Nos. NPF-90 and NPF-96 Enclosure:

Watts Bar Inspection/Activity Plan (09/01/2022- 06/30/2024)

cc Distribution via ListServ Signed by Deschaine, Wesley on 08/30/22

ML22242A190 X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available

OFFICE RII/DRP/RPB3 RII/DRP/RPB3 NAME S. Ninh W. Deschaine DATE 8/30/20222 8/30/2022

Site Inspection Activity Plan Watts Bar

09/01/2022 - 06/30/2024

Unit Start End Activity CAC Title Staff Count

U2 SGRP INSPECTION - POST INSTALLATION DOCUMENTATION REVIEW 4

2 9/1/2022 9/30/2022 IP 50001 000547 Steam Generator Replacement Inspection

DESIGN BASES ASSURANCE INSPECTION (TEAMS) 6

1,2 9/12/2022 9/16/2022 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - WB 6

1,2 9/12/2022 9/16/2022 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

1,2 10/3/2022 10/7/2022 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

FOLLOWUP INSPECTION OF THE 2017 CONFIRMATORY ORDER AT WATTS BAR 2

1,2 10/1/2022 11/18/2022 IP 92702 000238 Follow-Up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, and Orders

FOLLOWUP INSPECTION OF THE ESCALATED ENFORCEMENT VIOLATIONS 1

1,2 10/1/2022 10/30/2022 IP 92722 000913 Follow-Up Inspection for Any Severity Level I or II Traditional Enforcement Violation or for Two or More Severity Level III Traditional Enforcement Violations in a 12-Month Period

EMERGENCY PREPAREDNESS PROGRAM INSPECTION 2

1,2 11/14/2022 11/18/2022 IP 71114.02 000717 Alert and Notification System Testing

1,2 11/14/2022 11/18/2022 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

1,2 11/14/2022 11/18/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1,2 11/14/2022 11/18/2022 IP 71114.05 000720 Maintenance of Emergency Preparedness

1,2 11/14/2022 11/18/2022 IP 71151 001397 Performance Indicator Verification

TVA CORPORATE AA/FFD INSPECTION 2

1,2 1/9/2023 1/13/2023 IP 71130.01 000733 Access Authorization

1,2 1/9/2023 1/13/2023 IP 71130.08 000740 Fitness For Duty Program

SECURITY BASELINE INSPECTION 2

1,2 2/27/2023 3/3/2023 IP 71130.01 000733 Access Authorization

1,2 2/27/2023 3/3/2023 IP 71130.02 000734 Access Control

1,2 2/27/2023 3/3/2023 IP 71130.08 000740 Fitness For Duty Program

1,2 2/27/2023 3/3/2023 IP 71130.09 001656 Security Plan Changes

1,2 2/27/2023 3/3/2023 IP 71151 001338 Performance Indicator Verification

CYBER SECURITY INSPECTION 4

1,2 3/6/2023 3/10/2023 IP 71130.10 000741 Cybersecurity

UNIT 1 IN-SERVICE INSPECTION +SG 2

1 4/17/2023 4/21/2023 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP OCCUPATIONAL RADIATION SAFETY BASELINE INSPECTION 3

Prepared on 8/29/2022 10:20:38 AM 1 of 3 Site Inspection Activity Plan

1,2 4/17/2023 4/21/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

1,2 4/17/2023 4/21/2023 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

1,2 4/17/2023 4/21/2023 IP 71124.04 000728 Occupational Dose Assessment

1,2 4/17/2023 4/21/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation

1,2 4/17/2023 4/21/2023 IP 71151 000746 Performance Indicator Verification

1,2 5/22/2023 5/26/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

1,2 5/22/2023 5/26/2023 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

1,2 5/22/2023 5/26/2023 IP 71124.04 000728 Occupational Dose Assessment

1,2 5/22/2023 5/26/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation

1,2 5/22/2023 5/26/2023 IP 71151 000746 Performance Indicator Verification

FOCUSED ENGINEERING INSPECTION 3

1,2 6/12/2023 6/16/2023 IP 71111.21N.03 001808 Commercial Grade Dedication

1,2 6/26/2023 6/30/2023 IP 71111.21N.03 001808 Commercial Grade Dedication

TARGET SET INSPECTION 2

1,2 7/10/2023 7/14/2023 IP 71130.14 000743 Review of Power Reactor Target Sets

RP PUBLIC RADIATION SAFETY BASELINE INSPECTION 2

1,2 7/31/2023 8/4/2023 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment

1,2 7/31/2023 8/4/2023 IP 71124.07 000731 Radiological Environmental Monitoring Program

1,2 7/31/2023 8/4/2023 IP 71151 000746 Performance Indicator Verification

PROBLEM IDENTIFICATION AND RESOLUTION 4

1,2 8/7/2023 8/11/2023 IP 71152B 000747 Problem Identification and Resolution

1,2 8/21/2023 8/25/2023 IP 71152B 000747 Problem Identification and Resolution

UNIT 2 IN-SERVICE INSPECTION +SG 2

2 10/2/2023 10/6/2023 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

SECURITY BASELINE INSPECTION 2

1,2 10/30/2023 11/3/2023 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

1,2 10/30/2023 11/3/2023 IP 71130.07 000739 Security Training

EMERGENCY PREPAREDNESS EXERCISE INSPECTION 5

1,2 11/13/2023 11/17/2023 IP 71114.01 000716 Exercise Evaluation

1,2 11/13/2023 11/17/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1,2 11/13/2023 11/17/2023 IP 71151 001397 Performance Indicator Verification

FOCUSED ENGINEERING INSPECTIONS 3

1,2 1/22/2024 1/26/2024 IP 71111.21N.04 Age Related Focused Engineering Inspection

1,2 2/5/2024 2/9/2024 IP 71111.21N.04 Age Related Focused Engineering Inspection

OPERATION ON AN ISFSI 2

1,2 2/26/2024 3/1/2024 IP 60855 001001 Operation Of An ISFSI

Prepared on 8/29/2022 10:20:38 AM 2 of 3 Site Inspection Activity Plan

SECURITY BASELINE INSPECTION 1

1,2 2/26/2024 3/1/2024 IP 71130.02 000734 Access Control

1,2 2/26/2024 3/1/2024 IP 71130.09 001656 Security Plan Changes

1,2 2/26/2024 3/1/2024 IP 71151 001338 Performance Indicator Verification

Prepared on 8/29/2022 10:20:38 AM 3 of 3