ML24254A208

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Quad Cities, Unit Nos. 1 and 2 - Alternative to RV-08, Rev 1, SRV Testing Interval - Acceptance of Requested Licensing Action Re Relief Request Associated with Safety Relief Valve Testing Interval
ML24254A208
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 09/10/2024
From: Robert Kuntz
NRC/NRR/DORL/LPL3
To: Nicely K
Exelon Generation Co
References
L-2024-LLR-0060
Download: ML24254A208 (3)


Text

From:

Robert Kuntz Sent:

Tuesday, September 10, 2024 8:15 AM To:

Nicely, Ken M.:(Exelon Nuclear)

Cc:

Luis Cruz Rosado

Subject:

Quad Cities Nuclear Power Station, Unit Nos. 1 and 2 - Alternative to RV-08, Rev 1, SRV Testing Interval-Acceptance of Requested Licensing Action Re:

Relief Request Associated with Safety Relief Valve Testing Interval (EPID: L-2024-LLR-0060)

Dear Ken Nicely,

By letter dated August 20, 2024 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML24233A213), Constellation Energy Generation LLC (CEG), submitted an alternative request for Quad Cities Nuclear Power Station, Unit Nos. 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Pursuant to Sections 50.55a(z)(1) and 50.55a(z)(2) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 70 hours8.101852e-4 days <br />0.0194 hours <br />1.157407e-4 weeks <br />2.6635e-5 months <br /> to complete. The NRC staff expects to complete this review by February 18, 2025.

If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

If you have any questions, please contact me.

Robert Kuntz, Sr. Project Manager Plant Licensing Branch 3

Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.

50-254, 50-265 cc: Listserv

Hearing Identifier:

NRR_DRMA Email Number:

2602 Mail Envelope Properties (SJ0PR09MB10897527947AC1BC5E17B304D999A2)

Subject:

Quad Cities Nuclear Power Station, Unit Nos. 1 and 2 - Alternative to RV-08, Rev 1, SRV Testing Interval-Acceptance of Requested Licensing Action Re Relief Request Associated with Safety Relief Valve Testing Interval (EPID L-2024-LLR-0060)

Sent Date:

9/10/2024 8:15:20 AM Received Date:

9/10/2024 8:15:00 AM From:

Robert Kuntz Created By:

Robert.Kuntz@nrc.gov Recipients:

"Luis Cruz Rosado" <Luis.CruzRosado@nrc.gov>

Tracking Status: None "Nicely, Ken M.:(Exelon Nuclear)" <ken.nicely@constellation.com>

Tracking Status: None Post Office:

SJ0PR09MB10897.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2840 9/10/2024 8:15:00 AM Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date: