Submittal of Calvert Cliffs, Units 1 & 2, Independent Spent Fuel Storage Installation, Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 17
ML21323A022
Person / Time
Site: Calvert Cliffs, 07200078  Constellation icon.png
Issue date: 11/01/2021
From: Thomas Young
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML21323A022 (2)


Text

SAFEGUARDS INFORMATION Security-Related Information - Withhold Under 10 CFR 2.390

Tuane L Young Senior Manager-Site Security

  • 1sY* Exelon Generation Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657 41 0 495 5223 Office www.exeloncorp.com

Tuane.Young@exeloncorp.com 10 CFR 50.54 10 CFR 72.186

November 1, 2021

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 & 2 Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318

Independent Spent Fuel.Storage Installation Material License No. SNM-2502 NRC Docket No. 72-08 NRC Docket No. 72-78

Subject:

Calvert Cliffs Nuclear Power Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 17

Security Plan for Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation, Revision 6

Safeguards Contingency Plan for Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation, Revision 3

As required by 10 CFR 50.54(p)(2) and 10 CFR 72.186, changes to the Calvert Cliffs Nuclear Power Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 17 are attached (Attachment *1 - Safeguards Information). The Security Plan for Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation, Revision 6, and Safeguards Contingency Plan for Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation, Revision 3, are superseded by Appendix C and Appendix D of the Calvert Cliffs Nuclear Power Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation, Revision 17. Attachment 2 provides the Table of Changes for the Security Plan Change Submittal and contains Security-Related Information.

This cover letter is not subject to protective requirements. Attachment 1 is subject to Safeguards Information protection according to 10 CFR 73.21. Upon separation from Attachment 1, this cover letter is to be considered Decontrolled. *

~OD)

. SAFEGUARDS INFORMATION f--1. =:;, 5. 2-,h Security-Related Information -:- Withhold Linder 10 CFR 2.390 fJ fl)~~

v,..,f5_5 SAFEGUARDS INFORMATION Security-Related Information - Withhold Under 10 CFR 2.390
  • Document Control Desk November 1, 2021 Page 2

The revision to the Calvert Cliffs Nuclear Power Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation, and superseding of the Security Plan for Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation, and Safeguards Contingency Plan for Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation do not decrease the effectivenes*s of the Plan.

  • There are no regulatory commitments contained in this letter.

Should you have any questions regarding this matter, please contact Mr. Larry D. Smith at 410-495-5219.

ResP.

T Site Security

TLY/bar

Attachments: (1) Calvert Cliffs Nuclear Power Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 17 (Safeguards Information)

(2) Table of Changes for Security Plan Change Submittals, Calvert Cliffs Nuclear Power Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan and Independent Spent Fuel Storage Installation, Revision 17 (Security-Related Information)

cc: NRC Regional Administrator, Region 1 Director, NMSS

(Without Attachments)

NRC Project Manager, Calvert Cliffs NRC Resident Inspector, Calvert Cliffs S. Seaman, DNR

SAFEGUARDS INFORMATION Security-Related Information - Withhold Under 10 CFR 2.390