Letter Sequence Other |
---|
EPID:L-2020-LLA-0216, Application to Modify the Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09) (Approved, Closed) |
|
MONTHYEARCNL-20-014, Application to Modify the Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09)2020-09-23023 September 2020 Application to Modify the Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09) Project stage: Request ML20303A0772020-10-29029 October 2020 NRR E-mail Capture - Sequoyah Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request Regarding Request to Transition to Westinghouse RFA-2 Fuel Project stage: Acceptance Review ML20304A1872020-11-10010 November 2020 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML21036A1092021-02-0404 February 2021 NRR E-mail Capture - Sequoyah Nuclear Plant, Units 1 and 2 - Corrected Audit Plan and Setup of Online Reference Portal Project stage: Other ML21035A3222021-02-0404 February 2021 NRR E-mail Capture - Sequoyah Nuclear Plant, Units 1 and 2 - Audit Plan and Setup of Online Reference Portal Project stage: Other ML21095A0482021-04-0505 April 2021 NRR E-mail Capture - Sequoyah Nuclear Plant, Units 1 and 2 - Request for Additional Information Regarding Request to Transition to Westinghouse Fuel Project stage: RAI ML21090A2282021-04-0808 April 2021 Regulatory Audit Summary Related to Request to Transition to Westinghouse Fuel Project stage: Other CNL-21-039, Response to Request for Additional Information Re Application to Modify Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09)2021-05-0505 May 2021 Response to Request for Additional Information Re Application to Modify Technical Specification to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09) Project stage: Response to RAI CNL-21-066, Correction to Application to Modify the Technical Specifications to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09) (EPID L-2020-LLA-0216, EPID L-2020-LLA-01692021-08-13013 August 2021 Correction to Application to Modify the Technical Specifications to Allow for Transition to Westinghouse RFA-2 Fuel (SQN-TS-20-09) (EPID L-2020-LLA-0216, EPID L-2020-LLA-0169 Project stage: Request ML21245A2672021-10-27027 October 2021 NON-PROPRIETARY - Sequoyah Nuclear Plant, Units 1 and 2 - Issuance of Amendment Nos. 356 and 349 Regarding the Transition to Westinghouse Robust Fuel Assembly-2 (RFA-2) Fuel Project stage: Approval 2021-02-04
[Table View] |
|
---|
Category:Audit Report
MONTHYEARML24039A0792024-02-12012 February 2024 – Summary of Regulatory Audit Regarding the License Amendment Request for Hydrologic Analysis Changes to the Updated Final Safety Analysis Report (EPID L-2020-LLA-0004) - Public ML22327A1412022-11-22022 November 2022 10 CFR 50.46 Annual and 30-Day Report of Changes in Peak Cladding Temperatures (PCT) ML22263A0082022-09-28028 September 2022 Audit Summary Request for Alternative RV-02 - PIV Leakage ML21090A2282021-04-0808 April 2021 Regulatory Audit Summary Related to Request to Transition to Westinghouse Fuel ML15294A2032015-10-30030 October 2015 NRC Report for the Audit of Tennessee Valley Authority'S Flood Hazard Reevaluation Report Submittals Relating to the Near-Term Task Force Recommendation 2.1-Flooding for Browns Ferry, Units 1,2 & 3, Sequoyah, Units 1 & 2, and Watts Bar, Uni ML15033A4302015-03-0303 March 2015 Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 ML14002A1132014-02-19019 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML13301A6532013-11-12012 November 2013 Audit Report Regarding Seismic Walkdowns to Support Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML13141A3202013-06-13013 June 2013 Letter Aging Management Programs Audit Report Regarding the Sequoyah Nuclear Plant, Units 1 and 2 ML1100303282011-01-19019 January 2011 Corrections for Commitment Audit Report ML1036103532010-12-30030 December 2010 Audit of the Licensee'S Management of Regulatory Commitments ML0729900382007-11-0707 November 2007 Audit of the Licensee'S Management of Regulatory Commitments ML0419101202004-07-0606 July 2004 LTR-04-0425 - Richard Schneider Ltr Final TVA Control Area Readiness Audit 2024-02-12
[Table view] Category:Letter
MONTHYEARIR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24177A0282024-06-25025 June 2024 Emergency Plan Implementing Procedure Revisions ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter ML24145A1052024-05-29029 May 2024 301 Exam Approval Letter ML24134A1762024-05-13013 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24128A0352024-05-0707 May 2024 Providing Supplemental Information to Apparent Violation ML24120A0582024-04-26026 April 2024 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2 ML24116A2612024-04-25025 April 2024 Interim Report of a Deviation or Failure to Comply - Transducer Model 8005N ML24114A0482024-04-23023 April 2024 Annual Radioactive Effluent Release Report for 2023 Monitoring Period CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24144A2362024-04-20020 April 2024 Discharge Monitoring Report (Dmr), March 2024 ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24102A1212024-04-18018 April 2024 Summary of Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1 Spring 2024 Steam Generator Tube Inspections ML24089A0882024-04-18018 April 2024 – Exemption from Select Requirements of 10 CFR Part 73; Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update ML24109A0272024-04-16016 April 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-23-006, Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03)2024-04-15015 April 2024 Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03) ML24106A0502024-04-12012 April 2024 Discharge Monitoring Report (Dmr), February 2024 ML24100A0162024-04-11011 April 2024 Request for Regulatory Conference (Tennessee Valley Authority - Sequoyah Nuclear Plant) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements ML24088A0332024-03-28028 March 2024 Request for Regulatory Conference (Tennessee Valley Authority) CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report ML24040A2062024-03-26026 March 2024 Issuance of Amendment Nos. 367 and 361 Regarding Changes to the Hydrologic Analyses (EPID L-2020-LLA-0004) - Public IR 05000327/20240902024-03-19019 March 2024 NRC Inspection Report 05000327-2024090 and 05000328-2024090 and Preliminary Greater than Green Finding and Apparent Violation CNL-24-027, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-14014 March 2024 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-24-029, Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 372024-03-14014 March 2024 Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 37 IR 05000327/20244012024-03-12012 March 2024 – Security Baseline Inspection Report 05000327/2024401 and 05000328/2024401 IR 05000259/20230062024-02-28028 February 2024 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1, 2 - Report 05000259/2023006, 05000260/2023006 and 05000296/2023006 ML24053A3932024-02-22022 February 2024 Final Report of a Deviation or Failure to Comply - Crompton Instruments Type 077 Ammeter CNL-24-023, Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 252024-02-20020 February 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 25 ML24046A2362024-02-15015 February 2024 Discharge Monitoring Report (Dmr), January 2024 ML24046A2072024-02-15015 February 2024 Emergency Plan Implementing Procedure Revisions. Includes EPIP-6, Revision 59 and EPIP-7, Revision 38 ML24046A2372024-02-15015 February 2024 Annual Water Withdrawal Report 2023 ML24046A0252024-02-14014 February 2024 Final Report of a Deviation or Failure to Comply Lube Oil Scavenging and Fuel Oil Engine Driven Pump ML24039A0792024-02-12012 February 2024 – Summary of Regulatory Audit Regarding the License Amendment Request for Hydrologic Analysis Changes to the Updated Final Safety Analysis Report (EPID L-2020-LLA-0004) - Public IR 05000327/20230042024-02-12012 February 2024 Integrated Inspection Report 05000327/2023004 and 05000328/2023004 and Apparent Violation ML24032A0202024-01-31031 January 2024 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 ML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions 2024-07-09
[Table view] |
Text
April 8, 2021 Mr. James Barstow Vice President, Nuclear Regulatory Affairs and Support Services Tennessee Valley Authority 1101 Market Street, LP 4A-C Chattanooga, TN 37402-2801
SUBJECT:
SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 - REGULATORY AUDIT
SUMMARY
RELATED TO REQUEST TO TRANSITION TO WESTINGHOUSE FUEL (EPID L-2020-LLA-0216)
Dear Mr. Barstow:
By letter dated September 23, 2020, Tennessee Valley Authority (TVA) submitted a license amendment request for Sequoyah Nuclear Plant, Units 1 and 2, that would revise the Technical Specifications (TS) to allow the use of Westinghouse RFA-2 fuel with Optimized ZIRLOTM cladding. Further, the proposed amendments would revise TS 5.6.3, Core Operating Limits Report, to replace the loss-of-coolant accident analysis evaluation model references with the FULL SPECTRUMTM Loss-of-Coolant Accident Evaluation Model. Finally, the proposed amendments would revise the TSs to permit the use of 52 full-length control rods with no full-length control rod assembly in core location H-08.
To enhance the review of TVAs request, the U.S. Nuclear Regulatory Commission (NRC) staff conducted an audit of supporting documents from February 4, 2021, through March 12, 2021.
The NRC staff audited the requested documents to confirm certain information relied upon in the license amendment request. A summary of the regulatory audit is enclosed. The NRC staff did not identify any significant issues during the audit. However, the staff did identify the need for additional information related to the topic of the audit. The NRC staffs request for additional information was transmitted via email dated April 5, 2021.
Sincerely,
/RA/
Michael J. Wentzel, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328
Enclosure:
Regulatory Audit Summary cc: Listserv
REGULATORY AUDIT
SUMMARY
LICENSE AMENDMENT REQUEST TO TRANSITION TO WESTINGHOUSE FUEL TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 DOCKET NOS. 50-327 AND 50-328
1.0 BACKGROUND
A regulatory audit is an activity undertaken by the U.S. Nuclear Regulatory Commission (NRC) staff to examine and evaluate licensee information with the intent to gain an understanding of, verify, or identify information that will require docketing to support the basis of a licensing or regulatory decision.
On September 23, 2020 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML20267A617), the Tennessee Valley Authority (TVA, the licensee) submitted a license amendment request (LAR) for Sequoyah Nuclear Plant, Units 1 and 2 (Sequoyah). The proposed amendments would revise Technical Specifications (TS) to allow the use of Westinghouse RFA-2 fuel with Optimized ZIRLOTM cladding. Further, the proposed amendments would revise TS 5.6.3, Core Operating Limits Report, to replace the loss-of-coolant accident analysis evaluation model references with the FULL SPECTRUMTM Loss-of-Coolant Accident Evaluation Model. Finally, the proposed amendments would revise the TSs to permit the use of 52 full-length control rods with no full-length control rod assembly in core location H-08.
The NRC staff performed a preliminary review of the LAR and determined that a regulatory audit would assist in the timely completion of the review. The regulatory audit was performed consistent with the NRC Office of Nuclear Reactor Regulation Office Instruction LIC-111, Regulatory Audits, Revision 1, dated October 31, 2019 (ADAMS Accession No. ML19226A274). The NRC staff conducted a regulatory audit that consisted of a remote audit, including discussions with the licensee, from February 4, 2021, through March 12, 2021.
The audit plan was provided to TVA on February 4, 2021 (ADAMS Accession No. ML21036A109). The list of documents uploaded by the licensee in response to the NRC staffs request and examined by the audit team is provided in Section 5.0.
2.0 AUDIT ACTIVITIES AND OBSERVATIONS The remote audit was conducted using an online portal and teleconferencing capabilities. The purpose of the audit was to (1) confirm internal licensee information that supports statements made in the LAR, and (2) determine whether the information included in the documents is necessary to be submitted to support a safety conclusion.
Enclosure
Discussions on the topics identified in the attachment of the audit plan were held with the licensee during audit calls conducted on February 4 and March 3, 2021. The NRC staff assessed the information provided during the audit to determine whether additional information would be needed to support a regulatory finding, and therefore, would need to be submitted for review.
3.0 RESULTS OF THE AUDIT During the audit, the NRC staff confirmed information that supported statements made in the LAR. However, the staff identified additional information that is needed to support the staffs regulatory findings. The NRC staff finalized requests for additional information, which were issued to TVA by email dated April 5, 2021 (ADAMS Accession No. ML21095A048).
4.0 AUDIT PARTICIPANTS NRC and Contractor TVA and Westinghouse Robert Beaton Christopher Carey John Grasso Kasey Decker Charley Peabody Thomas Gerlowski Shie-Jeng Peng John Moorehead Muhammad Razzaque Andrew Taylor Michael Wentzel Yuken Wong 5.0 LIST OF DOCUMENTS AND MATERIALS REVIEWED DURING THE AUDIT Westinghouse Electric Company, LLC., Calculation CN-SQN-RTSR-036, Transition Core DNB Penalty Calculation for the Sequoyah RTSR, November 2019.
Westinghouse Electric Company, LLC., Calculation CN-SQN-RTSR-004, Revision 1, Thimble Bypass Flow Calculation for the Sequoyah RTSR - Short Form Revision, April 2020.
Westinghouse Electric Company, LLC., Calculation WCAP-10886, Characterization of V. C. Summer VANTAGE 5 Demonstration Assemblies, August 1985.
Westinghouse Calculation PPE-06-37, Wolf Creek EOC 14 Robust Fuel Assembly-2 (RFA-2) Fuel Examination Report, April 2006.
Drawing 686J347, RV General Assembly - Section View - Reactor Vessel Drawing 6467E13, Sequoyah Unit 2 Support Pin Replacement UHI Guide Tube/Flow Column General Assembly.
Drawing 5D63967, Part Length Guide Tube Restrictor and Removable Cover Plate Outline.
ML21090A228 *by e-mail OFFICE NRR/DORL/LPL2-2/PM* NRR/DORL/LPL2-2/LA* NRR/DSS/SNSB/BC*
NAME MWentzel RButler SKrepel DATE 04/07/2021 04/07/2021 04/07/2021 OFFICE NRR/DORL/LPL2-2/BC* NRR/DORL/LPL2-2/PM*
NAME DWrona MWentzel DATE 04/08/2021 04/08/2021