IR 05000443/2020006
| ML21055A404 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 03/03/2021 |
| From: | Brice Bickett Division Reactor Projects I |
| To: | Moul D Florida Power & Light Co, NextEra Energy Seabrook |
| References | |
| IR 2020006 | |
| Download: ML21055A404 (6) | |
Text
March 3, 2021
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR SEABROOK STATION, UNIT NO. 1 (REPORT 05000443/2020006)
Dear Mr. Moul,
The NRC has completed its end-of-cycle performance assessment of Seabrook Station, Unit 1 (Seabrook), reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2020 through December 31, 2020. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC concluded that overall performance at your facility preserved public health and safety.
The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.
The NRC determined the performance at Seabrook during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP)
Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Seabrook The enclosed inspection plan lists the inspections scheduled through December 31, 2022. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the February 1, 2021 memo, Calendar Year 2021 Inspection Guidance During COVID-19 Telework Restrictions (ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here:
https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.
On March 11, 2019 (ADAMS Ref. No. ML18204A291) the NRC issued a license amendment which reconciles the licensing design basis of concrete structures impacted by alkali-silica reaction (ASR). On November 24, 2020 (ADAMS Ref. No. ML20318A003) the NRC issued a letter that revised the Renewed Facility Operating License (RFOL) No. NPF-86 to include four additional conditions in RFOL No. NPF-86 that the Atomic Safety and Licensing Board (ALSB) found necessary to satisfy regulatory requirements with respect to ASR. The NRC will inspect the incorporation of the additional conditions ordered by the ASLB into your station programs and procedures as well as continue to provide oversight of your management of the effects of ASR in the plants concrete structures using the ROPs baseline inspection program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 610-337-5312 with any questions you have regarding this letter.
Sincerely, X /RA/
Signed by: Brice A. Bickett
Brice Bickett, Chief Project Branch 3 Division of Reactor Projects
Docket No. 50-443 License No. NPF-86
Enclosure:
Seabrook Inspection Plan
X SUNSI Review
X Non-Sensitive
X Publicly Available
OFFICE RI/DRP RI/DRP
NAME PFinney BBickett
DATE 2/24/21 3/3/21
Seabrook 01/01/2021 - 12/31/2022 Unit Start End Activity CAC Title Staff Count RP Rad Waste and Transportation 71124.08 - REMOTE
1 02/08/2021 02/12/2021 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &
Transportation Access Control, Equipment Testing and Maintenance, Training, SPR
1 02/22/2021 02/26/2021 IP 71130.02 000734 Access Control
02/22/2021 02/26/2021 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
02/22/2021 02/26/2021 IP 71130.07 000739 Security Training
02/22/2021 02/26/2021 IP 71130.09 001656 Security Plan Changes
02/22/2021 02/26/2021 IP 71151 001338 Performance Indicator Verification Design Basis Assurance Inspection - Programs - Power Operated Valves - Seabrook Unit 1
1 03/01/2021 03/05/2021 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements
03/15/2021 03/19/2021 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements RP Rad Hazard Assess & Control; Occ Dose Assess IP71124.01/.04
1 03/15/2021 03/19/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
03/15/2021 03/19/2021 IP 71124.04 000728 Occupational Dose Assessment Evaluations of Changes, Tests and Experiments
1 05/16/2021 05/22/2021 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments MATERIAL CONTROL AND ACCOUNTABILITY
1 07/18/2021 07/24/2021 IP 71130.11 000742 Material Control and Accounting (MC&A)
Seabrook Requal Inspection with P/F Results
1 08/01/2021 08/06/2021 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance
08/01/2021 08/06/2021 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance HEAT SINK INSPECTION
1 08/08/2021 08/14/2021 IP 71111.07T 000700 Heat Sink Performance EP EXERCISE INSPECTION - SEABROOK
1 08/09/2021 08/13/2021 IP 71114.01 000716 Exercise Evaluation
08/09/2021 08/13/2021 IP 71151 001397 Performance Indicator Verification 2/9/2021 12:12:15 PM Page 1 of 3 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Seabrook 01/01/2021 - 12/31/2022 Unit Start End Activity CAC Title Staff Count RP Solid Waste Processing, Handling, Storage, and Transportation / PI's (71124.08 / 71151) - SB
1 08/23/2021 08/27/2021 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &
Transportation
08/23/2021 08/27/2021 IP 71151 000746 Performance Indicator Verification RP Rad Hazard Assess & Control / ALARA/ PIs (71124.01/.02/71151) - SB
1 10/04/2021 10/08/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
10/04/2021 10/08/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls
10/04/2021 10/08/2021 IP 71151 000746 Performance Indicator Verification INSERVICE INSPECTION
1 10/10/2021 10/23/2021 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
Design Basis Assurance Inspection - Teams - Seabrook
1 01/24/2022 02/11/2022 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
RP Rad Hazard Assessment 71124.01 - SB
1 02/28/2022 03/04/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation EP EXERCISE INSPECTION - SEABROOK
1 04/04/2022 04/08/2022 IP 71114.01 000716 Exercise Evaluation
04/04/2022 04/08/2022 IP 71151 001397 Performance Indicator Verification RP Rad Instrumentation 71124.05 - SB
1 06/13/2022 06/17/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation Access Control, Protective Strat, TSR, SPR, PI-SB
1 06/13/2022 06/17/2022 IP 71130.02 000734 Access Control
06/13/2022 06/17/2022 IP 71130.05 000737 Protective Strategy Evaluation
06/13/2022 06/17/2022 IP 71130.09 001656 Security Plan Changes
06/13/2022 06/17/2022 IP 71130.14 000743 Review of Power Reactor Target Sets
06/13/2022 06/17/2022 IP 71151 001338 Performance Indicator Verification ISFSI Operational Inspection (60855) - SB
1 08/15/2022 08/19/2022 IP 60855 001001 Operation Of An ISFSI 2/9/2021 12:12:15 PM Page 2 of 3 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Seabrook 01/01/2021 - 12/31/2022 Unit Start End Activity CAC Title Staff Count RP Rad Environmental Monitoring Program 71124.07 - SB
1 08/22/2022 08/26/2022 IP 71124.07 000731 Radiological Environmental Monitoring Program RP Rad Gas and Liq Effluent Treatment / PIs (71124.06/71151)
1 10/31/2022 11/04/2022 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment
10/31/2022 11/04/2022 IP 71151 000746 Performance Indicator Verification PI&R BIENNIAL TEAM INSPECTION - SB
1 10/31/2022 11/04/2022 IP 71152B 000747 Problem Identification and Resolution
11/14/2022 11/18/2022 IP 71152B 000747 Problem Identification and Resolution 2/9/2021 12:12:15 PM Page 3 of 3 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report