Forwards Sser Supporting Util Response to Open Items Identified in 851022 Auxiliary Feedwater Sys Seismic Qualification,Per Generic Ltr 81-14.Efforts Under TACs 43643,43644 & 43645 Completed.Salp Input Also Encl
ML20244E158
Person / Time
Site: Oconee, 05000000
Issue date: 08/05/1986
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Pastis H
Office of Nuclear Reactor Regulation
Shared Package
ML20195F761 List:
References
FOIA-87-714, REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR GL-81-14, TAC-43643, TAC-43644, TAC-43645, NUDOCS 8608080335
Download: ML20244E158 (2)


Text

_ _ _ _ _ _ _ _ _ - _ _ _ _. _

l

[ym angk, UNITED STATES NUCLEAR REGULATORY COMMISSION

[

g E

WASHWGTON, O. C. 20655 5

August 5, 1986 MEMORANDUM FOR:

Helen Pastis, Froject Manager PWR Project Directorate, #6 Division of PWR Licensing-B FROM:

Dennis M. Crutchfield, Assistant Director l

Division of PWR Licensing-B

SUBJECT:

SEISMIC QUALIFICATION OF THE OCONEE, UNITS 1, 2 AND 3 AUXILIARY FEEDWATER SYSTEM-SUPPLEMENTAL SAFETY EVALUATION REPORT FOR MPA C-14 (TAC NOS. 43643/4/5) -

Enclosed is the Plant, Electrical Instrumentation and Control Systems Branch supplemental safety evaluation report (SSER) concerning seismic qualification of Oconee Units 1, 2 and 3 auxiliary feedwater (AFW) system in accordance with the criteria of Generic Letter 81-14 (MPA C-14). This SSER resolves the three open issues identified in our SER on this subject dated October 22, 1985.

i Included in this SSER is our resolution of the potential backfit we identified i

in our memorandum to Frank Miraglia dated December 16, 1985 concerning AFW system availability following a safe shutdown earthquake (maximum hypothetical earthquake for Oconee) and concurrent single failure. The evaluation of this issue incorporates ir.put received from DSR0 (memorandsm from Brian Sheron to me dated July 18,1986).

Based on the licensees responses and our backfit evaluation, we conclude that the remaining open items regarding AFW system seismic qualification have been satisfactorily addressed, and thaefore, the criteria of Generic Letter 81-14 and the requirements of GDC 2 and 34 have been met. We consider NPA C-14 co be closed for Oconee.

It should be noted however, that the licensee has committed to correct i

deficiencies identified in the seismic qualification of the AFW system in accordance with the licensing design basis. A schedule for implementation of required modifications is to be provided by January 5, 1987 with completion of modifications scheduled by January,1990. The licensee should be required to maintain this schedule or properly justify any slippage.

We consider our efforts under TAC Nos. 43643/4/5 to'be complete. We have also enclosed our SALP input.

Dennis M. Crutchfield, sistant Director Division of PWR Licensing-B 1

Enclosures:

As stated

[

,, a cc w/ enclosures:

See next page

^

Contact:

6 J. Wenniel, X27615 ns

{

.g -

August 5, 1986 cc w/ enclosures:

F. Miraglia T. Speis' C. Rossi G. Lainas

8. Sheron J. Hilhoan W. Regan W. Minners F. Congel I