Forwards Evaluation of Safety Issue Discussed in 860107 Memo Re Regulatory Analysis of Emergency Feedwater Sys at Facility.Proposed Fix of Sys Should Consider Plant Improvements Previously Implemented by Licensee
ML20244D726
Person / Time
Site: Oconee, 05000000
Issue date: 02/28/1986
From: Congel F
Office of Nuclear Reactor Regulation
To: Parr O
Office of Nuclear Reactor Regulation
Shared Package
ML20195F761 List:
References
FOIA-87-714 NUDOCS 8603140240
Download: ML20244D726 (5)


Text

_ _ _ _ - _ _ _ _ _ _ _ _

a

  1. y $$ Elog'o,,

g j

5 UtilTED STATES

["

g NUCLEAR REGULATORY COMMISSION

~

r, a

WASHINGTON. D. C. 20555

%,.....,f mm c, l.

[ 56o r, t e,

MEMORAhDUMFOR:

0. Parr, Chief Plant Electrical, Instrumentation and Control Systems Branch, DPWRL-B FROM:

Frank J. Congel, Chief Reliability & Risk Assessment Branch, DSRO

SUBJECT:

RRAB INPUT TO DPWRL-B's REGULATORY DECISION ON EFW SYSTEM BACKFIT AT OCONEE SITE

REFERENCE:

Memorandum from D. M. Crutchfield, DPWL-B to B. Sheron, DSRO, dated January 7, 1986 Regarding Regulatory Analysis for Plant Specific Backfit of Oconee The above reference identified the need for a regulatory analysis of the emergency feed-water (EFW) system at Oconee nuclear units. Enclosed is our evaluation of the Safety Issue discussed in the at,ove reference. Our preliminary evaluation indicates that the upper bound estimate of the cost of any proposed EFW System fix should not exceed $600,000, based on a

$1000/ person-rem criteria. We suggest that any proposed fix of the EFW system could consider the plant improvements which have been previously implemented by the licensee, Duke Power Company.

If you need further information regarding risk perspective, E. Che111ah could be contacted at x28338.

Frank J. Congel, Chief Reliability & Risk Assessment Branch Division of Safety Review and Oversight

Enclosure:

As stated cc:

T. Speis F. Miraglia F. Schroeder B. Sheron D. Crutchfield K. Kniel J. Stolz H. Nicholas M. Rubin J. Wermiel wsmi%p g g

&1

^

1',

l ENCLOSURE l

RRAB INPUT TO DPWRL-B'S REGULATORY DECISION ON i

EFW SYSTEM BACKFIT AT OCONEE SITE

REFERENCE:

Memorandum from D. M. Crutchfiled, DPWL-B to B. Sheron, DSR0, dated January 7, 1986 Regarding Regulatory Analysis for Plant Specific 'oackfit of Oconee The above reference identified the need for a regulatory analysis of the emergency feed-water (EFW) system at the Oconee nuclear units. Basically, staff's review of the licensee, Duke Power Company (DPC), response to generic letter 81-14 concerning seismic qualification of the EFW system indicates that a safe shutdown earthquake (SSE) of 0.lg magnitude could cause a pipe rupture of the non-seismic condenser circulation water (CCW) system; the resulting flood in the turbine building could result in the loss of all three trains of l

l the EFW System. When the above adverse systems interaction is compounded by a postulated single active failure in the standby shutdown facility (SSF) system, the decay heat removal capability through the steam generators could be lost.

The staff believes that DPC should correct the above postulated scenario.

Because the original licensing basis for Oconee nuclear units did not require regulatory compliance with general design criteria GDC-2 and GDC-34 for the EFW l

system, staff considers the above postulated safety issue resolution a backfit for Oconee. Thus, the above reference requested DSRO staff to perform an initial cost / benefit analysis in order to establish an upper bound on cost of the desired backfit that could be justified as a realistic safety improvement

i t

2 at the Oconee site. The purpose of this memorandum is to a provide risk perspective regarding seismic core damage sequences including the postulated accident scenario indicated in the above reference and to provide an upper bound estimate of the dollar worth of safety improvement that coul'd be realized from the seismic safety issue discussed in the above reference.

Our preliminary review of Oconee Probabilistic Risk Assessment (PRA) indicates that the total mean core damage frequency estimate is about 3E-4 per reactor year. The core damage frequency is dominated by various' internal flooding events (not seismically induced) at the turbine building. The frequency contribution of seismic events of various inagnitudes ranging from 0.01g to 0.6g to the tot'al core damage is about 6E-5 per reactor year. The above estimate has a very large uncertainty (a frequency range of 1.0E-7 to 1.0E-4 perreactoryear). The Oconee PRA has identified three dominant structural failure modes which contribute to the total seismic sequence frequency of 6E-5 per reactor year. These failure modes are:

(1)thecollapseofauxiliary building (AB) internal massonry walls causing loss of the high pressure injection [HPl]andEFWsystemandsystemcomponents;(2)cc11apseofthe blockwalls in the blockhouse through which all 4.16KV emergency buses pass; and (3) rupture of the condenser and failure of CCW pipes connected to the condenser which cause a large flood in the TB, resulting in the loss of three EFW trains and HPI pumps in AB. The median fragility estimate of the condenser and connected CCW piping is about 0.219 with a considerable uncertainty bound which is about Br=Bv=0.14. Thus, a postulated SSE could cause CCW pipe failure which could in turn cause a large flood resulting in failure of three trains'of the EFW System. The postulated SSE, in combination with a single failure in

a 4

i.

SSF System or a' failure of stuck open safety relief valve in the reactor primary system could cause core damage. The mean frequency of the above core damage sequence is estimated to be less than 2E-5 per reactor year.

The Oconee containment is a large dry containment. The Oconee PRA predicts that the seismic capacity of the Oconee containment is about 2g (Median) with an uncertainty bound about Br=0.26 and Bv=0.29. Because of the larger capacity of the containment, we believe that a seismic event of SSE magnitude will not cause a containment gross failure. However, postulated core damage due to the TB flooding sequence could cause a delayed containment failure due to late overpressure buildup inside the containment. The overpressure buildup could be den to the production of non-condensible gases with no containment heat removal at abcut 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after the onset of core damage. Thus the release estimates from the seismically induced flooding sequence are estimated to be similar to the release estimates of a release category 4 as defined in the Oconee PRA.

If a conditional probability of 0.9 for the containment overpressure failure mode and a conditional whole body dose with a maximum estimate of 1.0E+6 per event are assumed, then the risk estimate of the postulated SSE induced flooding sequence could not be more than about 18 person rem per reactor year. There could also be about 0.1 probability that the containment may not fail with core damage, but release could occur through containment leakage. The conditional release through a leakage type failure mode is similar to a release category 5 as defined in the Oconee PRA, which results in an estimated conditional whole body dose of not more than 1.0 E+4 j

person rem per event. The risk estimate due to the leakage failure mode is then less than one person-rem per reactor year. Therefore, the total risk 9

4

4 6 estimate of the SSE induced flooding sequence should not to exceed about 18 person-rem per reactor year. If the Commission's proposed safety goal of $1000 per person-rem for the benefit / cost guidance is applied and a reactor life of 30 years is assumed. then the postulated SSE induced flooding sequence could have a maximum risk worth of about $540,000.

It is very important to note that the above risk worth estimate of $540,000 is more likely an upperbound estimate. This is primarily because of the use of i

the Reactor Safety Study (RSS) type source term methods in estimating Oconee releases. The staff believes that the use of RSS-type source term methods could yield a somewhat higher risk estimate for sequences involving late containment

~

failures. Also, the frequency estimate of an SSE induced flooding sequence is a little higher than the realistic estimate. The higher estimate of sequence frequency is primarily due to the inclusion of CCW structural failure contribution beyond the seismic intensity of 0.2g and up to 0.6. However, the 9

failure contributor beyond 0.2g is not expected to be significantly higher. At this time, we do not know the nature of EFW System and/or CCW System backfit and therefore, do not know the potential risk reduction of the backfit.

However, we suggest that the maximum risk worth estimate of $540,000 due to the SSE induced flood sequence could be considered as an additional basis that the staff can reassess the need for any kind of backfit to the EFW System at Oconee. It is also very important to note that DPC has already implemented many plant fixes to mitigate the TB flood and its impact on safety systems including EFW System pumps; therefore DPC has reduced the overall flood sequence frequency substantially.