ML20236D237
Text
- - - - - - _ - _ - _ _ - _ _ _ _ _ _ _
vrvi n cu a A n.::,
f f ?l4,,d ATOMIC ENEf7GY COMMIS510N
-oi< W I Q..,1 r-ita I
/
nl j,'
I p w.
.s.. '
wA>. imot on o c. :eus
<4;rs' MAR 21 13h, ger i < h ei
.1
& D ='
4L..
J. P. 0'Reilly, Director, Region I
'Nd. Moseley, Director, F.cgica 11 J. G. Keppler, Director, Region III E. M. Howard, Director, Region IV R. H. Engelken, Director, Region V 10 CFR 50 APPE!: DIX J, PRI:IARY REACTOR CONTA11::ET I.EAKAGE TSTmc roR k'ATER-COOLED POWER REACTORT. - INTERIM POS STATEKEliTS--
Please note the attached memorandum from the Assistant Director for Construction and Operations with his enclosure providing, as an interim measure, Regulatory positions on identified problem areas in Appendix J to The positions described in the enclosure 10 CFR 50.
entitled " Regulatory Fositions on 10 CFR 50 Appendix J Requirement s" should be followed by inspectors pending changes in the regulation.
47 /
0 J,ohn G. Davis, Deputy Director for Field Operations
Enclosure:
&co f rom E. H. Crier dtd 11 arch 12,1974 l
cc:
H. D. T'nornburg l
Regional Coordinators l
I O
0 Qmim l tb a 3 M D. y A 3 y
~
- - - - - _ - _ _