ML20235Z141
Text
-
t Distribution:
Supp1 &
g 74vg DRL Reading DR Reading RPB-5 Reading SMKari (2)
Docket Nos. 50-307' P. A. Morris and 50-309 R. S. Boyd D. F. Knuth P. Howe <
Hr. Howard R. Waldron U. S. Geological Survey Engineering Geology Branch Denver Federal Center Denver, Colorado 80225
Dear Mr. Waldron:
By letter dated September 26, 1967, Mr. Rarold L. Price, Director of Regulation, forwarded to Mr. William F. Pecora, Director of the j
j U. S. Geological Survey, the app 1Leationn filed separately by the Department of Water and Power of tie City of Los Angeles and by i
Southern California Edison Company and San Diego Gas and Electric Company for authorization to construct and operate two light water-cooled and moderated type nuclear power reactors, to be known as the Bolsa Island Project.
l 1
By letters dated December 27, 1968, and October 25, 1968, respectively, the applicants have each submitted an application to withdraw their application for a Construction Permit. A copy of a related notice which has been transmitted to the Of fice of the Federal Register for filing and publication is enclosed for your information.
In view of the above, no furthec review is required by the U. S.
Geological Survey on these applications.
Sincerely ynurs, Original Sign:! !,y Donald F. Knuth Roger 3, Royd, Assistant Director for Reac' tor Projects Division of Reactor Licensing
Enclosure:
Federal Register Notice ec: Dwight H. Lesason, U. S. G. 3.
V l
omcE >
..D.
? R 37,5,,,,,
.,DRL/R,P,B,,_5, SURNAME >
.!f.. b9...
f.!], b9
""" " """^"~
DATE >
I
~
~~~~
Form AEC-818 (Rev. 9-63) 97102OO622 OEIdi~4 Fo Ih-M-%2 PDR FOIA SCHADRA87-462 PDR
$l1
____ _