ML20235Z121

From kanterella
Jump to navigation Jump to search
Forwards Rept to ACRS Re Facility Site Considerations.W/O Encl
ML20235Z121
Person / Time
Site: 05000000, 05000307, 05000308
Issue date: 07/15/1968
From: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
To: Shaw M
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20235X376 List: ... further results
References
FOIA-87-462 NUDOCS 8710200611
Download: ML20235Z121 (6)


Text

-;

1 fl~T, iu@.,i..l. E

.!!Y lQ r.

t.

.u l

JUL 151968

- l go-3M 409 j

i Milton Shaw, Director i

Division of Reactor Development and Technology BOLSA ISLAND SITE CONSIDERATIONS - REPORT TO ACRS One copy of report on Bolsa Island Site Considerations dated

-l July 8,1968, prepared by the Division of Reactor Licensing for ACRS review is enclosed for your information.

VL e;.....

. g.ca e,y' F. Schroedeg l

RT-806 Peter A. Morris, Director l

DRL:E&RSTB Division of Reactor Licensing

Enclosure:

1. Rpt. dtd. 7/8/68 f

Dis tribution:

P.A. Morris R.S.Boyd D.Knuth DRL Rdg.

Suppl.

F.Karas RPB Rdg. #5 When se

,N ("3 '3*:mes, handle th!: daw c(.

me-ar.w.)i(hr "J

xnu Giagg. ---.

~~^fio200611 e71014 LQF nN'lN4..lsd.

e UIl ulh PDR FOIA SCHADRA87-462 PDR

..D.RL,,,,,,,,,,,,,,

omct >

.E.6.R.S.T.B : DRL,,,,,

,..RgS.B _ _ _ _ _d l

JFN

,GAM

$URNAME>

.... ~ -. - -

7//7.

8"~

-.-~

4 krm AEC.318 (Rev. D-53) _

7//}c/68 7/g/

omy u.s.GovutNMENT PRINTING CFFICI 1985-O-214429 Klf

-l3

l.

V, l

l l

l Ji c.

L-171 F O P. I U231.:D I A T E PELCASh Tel.

973-3335'or' (faursday July 25, 196E) 973-344o i

l l

L (NOTd TO CDITORD MD COMWSP71Dfd!TS:

Tuo j

following announcoraent was phoned to -the l

wire services at 7 p.:n. '.7ecinoscay, July 24, j

and is nains scr.t to ycu for your inforn:ation.)

l' BOLSA ISLAaD Pl.OJ CT TO D': RCSTUDILD-l T 1e Secretary of tne Interior Steaart L. Udall and otodc l

Energy Com.iscion Chairuan Glenn Y.

Scaborg announced today l

that. alternate plan.a are being. examined for a nuclear power I

anci desalting plant for Southern California in vie.1 cf tne-

{

fact tnat the Solen Island project ac presently constituted hac-

]

l been determined not to. he econordc for all participants based

.j cn tne presently catis..ated coat of $765 million.

Ajreement 1

I was reacnod bf the particiunnt at a recting today that the 1

project concept should bo ' continued and offorta.Wure initiated l

to explore means oy'which tne project could be reconstituted'on 11 l

a more econortic basis.

At the sane tii..o all the participants reiterated their intercat in the construction of. nuclear power and water decalting plants, ' including the usc ~ of island siten,

to meet the growing need of Southern California for those essential resourcon.

J itayor :.ia!.i Yortj of Los /ut,3clec and representatives of the City 's Departr.cnt of Mater and Power, Jack R.

(orton of Southern California Edison, C. M. Laffoon of San Diego Gas & i.,lectric Cotapany, and officialc of the Dapartraent of the Interior and AIC, participated in these high level conference; which concluded 1

today.

f.ocretary Udall and Chairman:Scaborg alno conferred by I

pnone with Josciah Juncen, Chairtaan of-tne v.atropoli tan ',?ater District.

i

.l l

(merc)

FoIA %1.

p k tg b1

2-Both Secretar/ Udall and Chairman Seaborg reaf firtwd entouainstic support for the concepts cici>cdied it: the project and the impact they still nave on tna future of Gouthern i

California and the country.

Tao original plan called for construction on a r.an-nade island of t.Jo nuclear power reactora capable of generating 1,500,000 kilv.ratto cf electricity and a desalting plant l

ultiuntely capabic of producine 150,000,000 gallons of fresh tator a day.

l l

l l

l l

l l

l 1

l l

l I

l l

l e'

Ofnce of Saline Water O' M ea ra. 143-6992 For R elease: July 24,1948 BOLAA ISLAND PROJ ECT TO BE RESTUDIED The Secretary of the laterier Stewart L. Udall and Atomic Energy Commission Chairmas 31ema T. Seaborg ammounced today that alternate plar.s are being amamined for a anclear power and desalting plaat ior soothera Califerata la view of the iaet that the Boisa isIaad project as pressatly constituted has been determined act to be oceaemic for all participants based on the presently estimated cost of SM5 million.

Agreement was reached by the participasta at a meettag today that the project cancept should be contimmad and allorts were laitiated to explore means by which the project cosid be recometituted en a naere economic basis. At the same time all the participants retterated their laterest in the construction of maclear power and water desalting plants, including the use of island sites, to aseet the growtag need of southern Califerata i

for theee essential resources.

Mayor Sam Yorty of Lee Angelea and representatives of the City's Department af Water and Power, Jack K. Hortaa of Southern Calliersia Edison, C. M. Laffoom of San Diego Gas er Electric Cornpany, and of!Lcials of the Depart =amt'el the laterior and AEC, participated la b

e

u i

these high level conferences which cameinded today. Secretary Udall and Chairman seaborg mise coaderred by phone with Joseph Jonaea.

Chairman of the Metropolitan Water Dietetet.

Both Secretary Udall and Chairsmaa Seaborg readfLruned methmetaatte empport for the r-O emnbedled La the profeet and the impaat they wt11 have en the Antare of ee=them ca1Ma-ala and the Ceemtry.

The eristaal plan aaned for seastreetles sa a sama-minde island of two anclear power reestors capable of generattag 1,900,000 kilewstir of ele @6ty and a desalting plaat mittately capable of predeetag 150,000,000 gallons el fresh water a day.

I aaa I

l E

L-i 1

S l

?

N