Requests Analysis of Engineering Factors Included in Proposed Design of Facility to Minimize Damage from seismically-induced Ground Actions.Part B,Vol 1 of PSAR Encl.W/O Encl
ML20235Z111
Person / Time
Site: 05000000, 05000307, 05000308
Issue date: 03/05/1968
From: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
To: Newmark N
ILLINOIS, UNIV. OF, URBANA, IL
Shared Package
ML20235X376 List: ... further results
References
FOIA-87-462 NUDOCS 8710200600
Download: ML20235Z111 (2)


Text

.

3e l

1 l

hMR 6 1968 l

1

)

DocketNos.50-30$

(E4 and 50-308 1

Dr. Nathan M. Newmark 1114 Civil Engineering Building l

1 University of Illinois Urbana, Illinois 61801

Dear Dr. Newmark:

Re: Contract No. AT(49-5)-2667 l

Nathan M. Newmark Consulting Engineering Services is hereby requested l

pursuant to the conditions of Contract No. AT(49-5)-2667, to provide the following services for the Comunission concerning the proposed construction of the Bolsa Island Nuclear Power and Desalting Plant nuclear reactor units designated as (1) the DEPARTMENT UNIT - by the

{

l Department of Water and Power of the City of Los Angales, and (2) tha l

EDISON-SAN DIEGO UNIT - by the Southern California Edison Company and San Diego Gas and Electric Company, at the-proposed site on a man-made island to be constructed offshore of the Bolsa Chica Beach State Park in Orange County, California, located approximately 26 miles from the Civic Center of Los Angeles, California:

1.

Analysis of the engineering f actors included in the proposed design to minimize damage from seismically-induced ground actions, 2.

Preparation of a report on (1) above, 3.

Serving as an expert witness in the public hearing on this facility.

The maH=um amount payable to your firm for this project is $5,000.00.

A copy of Part B (PSAR-Volume 1) of each application is enclosed for i

(

your review. Please note that each application to date is virtually identical however, much more information is yet to be filed and l

when it is received your copies.be forwarded to you promptly.

l Q.

8710200600 871014 PDR FOIA SCHADRAB7-462 PDR Folk-87-4?a lh g

n-wn.

,w-

=

(.

m j

.. v k

i 1

1 y

1

.Dr. Nathan M. Newmark,

The information listed below is being sent to you in two complete sets to provide you with background information concerning this project:

a) Selected maps and time scale chart, Pigures 1 through 7 i

I b) Raport by R. O. Castle dated. January 1966 '

c)

Letter dated October 2, 1967 and Report by H. Bolton Seed dated October 1967 d) Letter from Secretary Udall to Chairman Seaborg dated October 25, 1967 e) Letter from Chairman Seaborg to Secretary Udall dated l

November 1, 1967

]i We would like to discuss this project with you at your earliest convenience.

q Sincerely yours,

[

}

C f;;i..r."- M by P4tcr A.

..1:

Peter A. Morris, Director Division of Reactor Licensing

Enclosures:

1.

DWPCLA - Part B, PSAR - August 1967 2.

SCEC & SDGEC - Part B, PSAR - August 1967 3.

Maps, Reports, Letters, as above Distribution:

Suppl. (2)

REG Reading DRL Reading RPB-3 Reading Orig: WKaras P. A. Morris R. S. Boyd bec:

S. A. Teets, REG R. Hart, DC H. Jordan, OC OGC

,A0 Di f

p.y ).4c......

lar

.... 6o.5......

pg.....

.. g....

omm,..F y,'No sunnAur >

........a,y,a,s },,,j,,,,i

.,,, _ _ _ j

_ m a,,,,,,-

de P

ds om >

J,,/[/,68 3,/,,[/68

]/p,/68,,

1/30/68 1 /,,j//68, 3 /$ /68 rorm Asc. sis (n.v. >-as)

.,,,,,4m

_m, w..-.

....,-.y

.e o

y.,,,.,.,...

~,

.7_

..y

,y.

,s 7--

r 3.

>t a

e d9'

. /'. 21 ;

'