t Frank K. Pittman, Director Division of Reactor Development Robert H. Bryan, Chief M
l Research & Power Reactor Safety Branch Division of Licensing and Regulation BODEGA BAY, PACIFIC GAS AND ELECTRIC COMPANY, DOCKET NO. 50-205 Attention Walter Belter Chief, Environmental & Sanitary Engineering Branch Transmitted herewith is a copy of the followings Report TEI-837 from the Department of the Interior, Geological Survey, dated September 1963 and entitled j
" Geologic and Seismic Investigations of a Proposed
. Nuclear Power Plant Site on Bodega llead, Sonoma County, California."
.....,....,- -.,,...~ -.
Attachment:
As stated above Di st ribution Supplemental R6PRSB Reading N. D. Mason bec:
E. C. Case DLSR omcr >
.q sunnAut >.h K
I0/17/63 oin,
..4
-m (n.....
8709240418 851217 PDR FOIA FIRESTOOS-665 PDR i
v y
I.
1 l
1 u
e /
~
~
{
FRIORITY TWE, SPENCER TO EORNBLITE DTD 10/17/63 l
l 1
THE BODBCA BAT SITE WAS VISITED ON OCTOBER 7, 1963 BT C. S. SPENCER r
AND 1. H. ENGEIJ3N, REGION Y DIVISION OF CWFLIANCE. THE AEC INSFECTORS j
I l
l WERE ACCateANIED BT W. K. CLOUD, C. F. ENUDSON AND V. A. MOORE OF THE i
i U.S. COAST GE0IDGICAL SURVEY, SAN FRANCISCO, CALIFORNIA. THE I
1 EECAVATION FLOOR ELEVATION HAS PROGRESSED TO THE -59 FT. LEVEL WITH J
)
THE SCHEDULE CALLING FCK REACHING THE -73 FT ELEVATION BT THE 18TH I
)
0F OCTOBER. ALL ON-SITE CONSTRUCTION ACTIVITIES WHICH HAD TAKEN FIACE ON THE DATE W VISIT AFFEARED TO BE IN ACCGtD WITH THE 12TTER l
FRW N. R. SUTHERIAND TO ROBERT LOWENSTEIN DATED JUNE 27, 1963 l
l i
SEITING FORTH PG&E'S FIANS FOR PREPARATION OF THE EECAVATION FOR
)
i
)
THE FROPOSED BODECA BAT REACTOR AND REQUESTING CONFIRMATION OF
,;L l l
)
FC42'S VIEWS CONCERNING THE AFFLICATION OF THE COMMISSION'S REGULATIONS 10 CFR 50.10, TO SUCH WOREj THE LETTER OF REFLT FROM THE CENERAL COUNSEL DATED JULT 23, 1963 AND THE CONDITIONS SEE
~
FORTH IN SECTIONS 50.10/B 0F 10 CFR 50. END REF CO VGSSFENCER t