Forwards USGS TEI-837, Geologic & Seismic Investigations of Proposed Nuclear Power Plant Site on Bodega Head,Sonoma County,Ca. W/O Encl
ML20235C326
Person / Time
Site: 05000000, Bodega Bay
Issue date: 10/17/1963
From: Bryan R
US ATOMIC ENERGY COMMISSION (AEC)
To: Pittman F
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20234A767 List: ... further results
References
FOIA-85-665 NUDOCS 8709240418
Download: ML20235C326 (2)


Text

-

t Frank K. Pittman, Director Division of Reactor Development Robert H. Bryan, Chief M

l Research & Power Reactor Safety Branch Division of Licensing and Regulation BODEGA BAY, PACIFIC GAS AND ELECTRIC COMPANY, DOCKET NO. 50-205 Attention Walter Belter Chief, Environmental & Sanitary Engineering Branch Transmitted herewith is a copy of the followings Report TEI-837 from the Department of the Interior, Geological Survey, dated September 1963 and entitled j

" Geologic and Seismic Investigations of a Proposed

. Nuclear Power Plant Site on Bodega llead, Sonoma County, California."

.....,....,- -.,,...~ -.

Attachment:

As stated above Di st ribution Supplemental R6PRSB Reading N. D. Mason bec:

E. C. Case DLSR omcr >

.q sunnAut >.h K

I0/17/63 oin,

..4

-m (n.....

8709240418 851217 PDR FOIA FIRESTOOS-665 PDR i

v y

I.

1 l

1 u

e /

~

~

{

FRIORITY TWE, SPENCER TO EORNBLITE DTD 10/17/63 l

l 1

THE BODBCA BAT SITE WAS VISITED ON OCTOBER 7, 1963 BT C. S. SPENCER r

AND 1. H. ENGEIJ3N, REGION Y DIVISION OF CWFLIANCE. THE AEC INSFECTORS j

I l

l WERE ACCateANIED BT W. K. CLOUD, C. F. ENUDSON AND V. A. MOORE OF THE i

i U.S. COAST GE0IDGICAL SURVEY, SAN FRANCISCO, CALIFORNIA. THE I

1 EECAVATION FLOOR ELEVATION HAS PROGRESSED TO THE -59 FT. LEVEL WITH J

)

THE SCHEDULE CALLING FCK REACHING THE -73 FT ELEVATION BT THE 18TH I

)

0F OCTOBER. ALL ON-SITE CONSTRUCTION ACTIVITIES WHICH HAD TAKEN FIACE ON THE DATE W VISIT AFFEARED TO BE IN ACCGtD WITH THE 12TTER l

FRW N. R. SUTHERIAND TO ROBERT LOWENSTEIN DATED JUNE 27, 1963 l

l i

SEITING FORTH PG&E'S FIANS FOR PREPARATION OF THE EECAVATION FOR

)

i

)

THE FROPOSED BODECA BAT REACTOR AND REQUESTING CONFIRMATION OF

,;L l l

)

FC42'S VIEWS CONCERNING THE AFFLICATION OF THE COMMISSION'S REGULATIONS 10 CFR 50.10, TO SUCH WOREj THE LETTER OF REFLT FROM THE CENERAL COUNSEL DATED JULT 23, 1963 AND THE CONDITIONS SEE

~

FORTH IN SECTIONS 50.10/B 0F 10 CFR 50. END REF CO VGSSFENCER t