ML20235B092
Text
,
.2 t
..l 1-1 BMsCEE Docket 30. W 305 Bodega Buy Aram Queber of Cammieree Bodega Bay, dalth %5E3 Attention: Mr. Ray haabel, secretary - Manager asw.
This replies to your letter af Auguurt 19,19%, in thich you requested inftmestica ecE-.. Jag the ac1mer pouer reacte Wri for construction at Bodman Bar.
i The esclusion area ftr a given reactor site is deparmht ypen the nature sumi power level of the 3mrgest reactor 1==+d at that site. Generally v
speaking, the==cin=4r= area portaintag to a site such as that proposed W 708g would be sacreased cacy if subseqpeut2r constructed reactes were of a power level =irim=dly greater than that of the reacte presently proposed. This is, houwwer, subject to ryaluation of the engineered saf>
suards provided ftr the subsequent reactors,
)
We do not anticipate that the entrance to Bodega Barbar would be c2caed in connection with changes of final e under any circumstances other than the na14 h'y event of a serious accident ocedition. Procedures uw1m such ocoditions are -11y arranged between reactor operators ani police and fire G W te e other local aumergency agencies. The U. S. Coast Quard Station on Deren Park does not came within the prqposed ehmian area.
Concerning evacustice of the Toun of Bodega Bay, a critical review of an im>===+irm relating to the safWty of this reactor, i= ludi=r evaluation af the "usu$mus credible" amt other postulated accidenta is F-e rdy under way as part at the Regulatory staff a stu&. this stu# involves the ematAmeg41cn of factors relatlag to the release of radinartive fisaicut pecaucts, ami, therefase, to the gpostion of the possible effect af such accidenta on the Toint of Dodega Bay, the ocuqQated staff stu g vill be in the itima of the staff a beamros analysis, ietich win be presented at the PL&lic hearing required W 1aar.
8709230539 851217i PDR FOIA FIRESTOB5-665 PDit.
i
t.
modess aar Area chseer
-a-y or ocumarce We will send you a coger of the hasards aanlysis then it is p1M in the Publ.ie Document Roan prior to the hearing.
stacaraly yours, Harold L. Price DiPGC%d2 Of *^ nil *+4rm_
l l
l A
^
1 i
~
NO.s 9/22/M 9/P'M
.-1277 DAff RECEIVED DAff OF DOCUMENT.
' FROM.
w
' Bedsgs any Ames Chaser of Cear OTHER.
I Rfi MEM01 ifR.
ME I
O f MER:
~
1 1
ACflON NECESSARY O
CONCURRENCE Q
OA7E ANSWERED Clif8 sed E. Besk NO AC1lON NECESSARY Q COMMENT C
SYa FILE CODE:
I POST OFFICE CLA$$6F,
I DAIt RECEIVED BY REG NO.
REFERRED TO DAtt
'C g (, N i DESCRIPflON (Must Be Unclassined)
Ltr, refesensing ummeswered 8/19/ M C. Eammede f/egt$ss 9/l$/ M 1er and regensting answers to geestions.
j Cy to ELP f/indo (NCLO$URL$i i
. :n
~ REMARK 5i WnCE W 15E DDEcton 12%y 3 espies for file room U,5. MOwC ENERGY COMWS$CN MAIL CONTROL FORM Foam AeC.226s j
1860)
I I
PR-1297
'80D!81881AR!A RAW 8!A OROWW!A !
O BODEGA BAY 9 BODEGA 9 fE
=^ cE'roaa'^ 'e R
September 22, 1964 "o a rwo~e, ers. s7, Mr. Clifford K. Beck Acting Director of Regulation United States Atomic Energy Commission l
Washington, D.C.
20545 Your
Subject:
REG:CTE Docket No. 50-205
Dear Mr. Beck:
We appreciate your September 17th letter which was in re-sponse to a letter we sent to President Johnson on August 22, 1964.
Thank you for sending us the pamphlet, " Licensing of Power Reactors" and the rules of practice.
On Augus t 19, 1964, we wrote to Mr. W.
R. Price, Assistant Director, Division of Licensing and Regulation, A.E.C.,has re-questing that certain questions be answered.
No reply been received to our request, and we are wondering if you will be kind enough to give us the answers:
1.
Could the Federal Channel at the entrance to Bodega Harbor be closed at any time?
That is in the case of l
a nuclear accident at the plant, or at times of chang-ing the fuel core?
Any other circumstance?
2.
Would the U. S. Coast Guard Station on Doran Park come within the exclusion area?
3.
Would there be any circumstance that would result in evacuation of the town of Bodega Bay?
Naturally all of the above questions refer to the proposed nuclear plant on Bodega Head.
Sincerely yours, Ray ebel Dg 1297 RR:MR Secretary-Manager CC Mr. E. R.
Price, Ass't Director Division of Licensing and Regulation Rec'd Off. Dir. oY Reg'.
Dm _ f~[. #-r- (- re U.S. Atomic Energy Comission Ti[",1 l-['{-(((([~,
7 5'O' ~ ~
Washington 25, D. C.
3
-& W f a
4 CUMENT:
DATE RECEIVED NO.
DATE OF 0[19/64 S/24/64 123S UouD so) Area Chamber af Commeree 8
R OTHER LT A.
MEMOi REPO*
IS7 b-.,'Nk jr I
1 ORIG.s CC.
OTHER:
10, t
E. R. frice I
y AcilON NECESSARY CONCURRENCE C
DAtt AN5wERED
~
- NO ACitON NECESSARY-C- ~
COMMENT ~~'
O 8vi POST OFFICE FILE CODE.
CLAS$1F a
,.40 - 3
~-
DE5CRIPTION (Must 6. Unclassia.d)
REFERRED TO DATE RECElvED BY DATE
.. Lt r. r4gniesting info re exclusion ares (1) after installation of ese reacter.
Orig, to C. Edwards S/25/64 Cod (2) after instatisties of a total o C
siasuem thase er foor teacters't Cy to E. Price f/in fe ENCLOSU,RE%
- i.
- I t
o i /
REMARK j
0FFI Dramenes (3-for mail reos distributes) ie,36 c
x U. 5. ATOWC ENERGY COMutSSON Mall CONTROL FORM FORM AEC-3265 10-6 0)
_ -_. _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _Q