.7 I am transmitting to you Geological Survey report (TEI-844) entitled ENGINEERING GEOLOGY OF THE NUCLEAR POWER PLANI SITE ON BODEGA HEAD,
. SONOMA COUNTY, CALIPORNIA. This report by Messrs. Schlocker and Bonilla, has been prepared in response to your October 3 request for further geological investigations of the proposed nuclear power plant site -- especially the fault which had then been uncovered in the bedrock of the excavation for the ~ 1ocation of the proposed plant.
The most pertinent finding of the study is summarized in this final paragraph from the abstract:
l
" Faults that occurred on Point Reyes peninsula in. rock similar to that of Bodega Head as a result of the earthquake faulting that occurred j
in 1906 indicate that if some future earthquake, in which fault displacements comparable to those that occurred on the San Andreas fault zone in 1906, took place near Bodega Head, rupturing of near-surface granitic bedrock, would be expected somewhere on Bodega Head."
I understand from Survey personnel that Messrs. Schlocker and Bonilla have kept close contact with AEC regulatory staff and have apprised them of work as it has progressed.
Sincerely yours,
/s/ Stewart l
Secretary of the Interior Dr. Glenn T. Seaborg t
m l
Chairman, United States g
g Atomic Energy Commission 1717 H Street, N.W.
Washington, D. C.
20'545
{.'
40 l
e 4T Enclosure V
b
$1 f
(i[c,sf haa a 4
n.ss,s,d J jfk'$.UA~4 8709230469 851217 PDR FOIA FIRESTO85-665 PDR p
e-
,ak, 4
- - - - _ - - _ - - -.. -. _ _ ~ _ _ -. - -.. - -. - - - _ - - - - - - -.
I F40sd a DATE OF DOCUlilENT:
DATE RECElVEO N O.s US Dept. of the 7.nterior 1-16-65 1-17 by HLP _
m-h10 Washington, L. C. 202LO-X and report 708 OR 4 G.2 CCs OTHER:
'Dr. Seaborg (
???
ACTION NECSSSANT CONCURA$NCE DATE ANSWERED:
f 9Ts NO ACTION NECES8ANY ]
COMMENT CL ASSIF.:
POST OFFICE FILE CODER H-R zo. Not. _ _ _
Re 50-206 SUPPIE. ONLY OsSCRIPTION: h Se Usch*MI M REFERNED TO DATE - l NECUVED BY DATE Ltr. transmitting tha following reporti which is' as result of 10-3 63 request H.. L.~Pr i'es-~~~%L7
. for further - geological investigations w/all cys.
DL.the_.Rapo Mi.nuclgar..p_ owe _ r._ s 1.te_o q_
Jodega (especially re fault
'"C'
'""55 which had t.:en been uncovered in the.
NOTE:
ON 1421 we rec'd one cy tf repo2 bedrock of the excatition for proposect from :Mr. ii. Price 's off.l for reactor ):
file iand same day we ree 'd 1 reproduced cy of Itr. f/f.'ile.
Report TEI Shh--Engineerin ; Geolody This lis when we controlled item of the Proposed Nuclea" Fower F1 t Copies of Hie above Sj te..on.32d9Ea_He.Ad, SonoAa Count.. California dtc.12L63 were sent to Publ.ic Loc l
Room at H St., bpt othe.
TheabovewerepickedupforMr.H.Prd.ce i
distribution is not kno' except for items'we hav-on 1-17-Oh and delivered directly to hbn transmittal,1trs, for.
per his instructions. Itisunderstooqthat Reba appr me; 9n tn 100_cys..of_neport were rec'd by him.