Summary of 640318 Meeting W/Pg&E & GE in Bethesda,Md Re Util Intention to Submit New Amend to Application for CP for Nuclear Power Plant at Bodega Bay,Ca.Amend Would Involve Design to Help Reactor Bldg Withstand Earthquake
ML20235A777
Person / Time
Site: 05000000, Bodega Bay
Issue date: 03/27/1964
From: Watson F
US ATOMIC ENERGY COMMISSION (AEC)
To: Bryan R
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20234A767 List: ... further results
References
FOIA-85-665 NUDOCS 8709230416
Download: ML20235A777 (2)


Text

_ _ _ _ _ - _

y 9~

! : W,' *" "*

)

{. UNITED STATES COVEK MENT Memorandum TO-

Files DATE:

March 27, 1964

.(THRU)

R. H. Brya C ef, Research and

' Power Reac L

afety Branch, DIAR FROM :

F. N. Watson, Rese ch and Power Reactor Safety

' Branch, Division of Licensing and Regulation SUBJEcr: PACIFIC GAS AND ELECTRIC COMPANY - BODEGA BAY PLANT CONSTRUCTION PERMIT APPLICATION So-Ros On March 18, 1964,- a meeting concerning the above mentioned subject was held in Room 107 of the Bethesda Office. Those in attendance included:

PACIFIC GAS & ELECTRIC CO.

U.S.A.E.C.

C. C. Whelchel C. K. Beck F. F. Mautz M. M. Mann D. V. Kelly L. Kornblith e

P. A. Crane G. F. Hadlock R. H. Bryan GENERAL ELECTRIC J. F. Newell F. N. Watson R. B. Lemon M. K. Woodard D. McDaniel B. K. Grimes H. R. Denton In this meeting, representatives of the Pacific Gas and Electric Company expressed their intention to submit a new amendment to their application for construction permit for a nuclear power plant at Bodega Bay, California. This amendment would state the Company's intention to surround the reactor building, both on the sides and beneath the foundation, with a compressible or crushable material so that two inches of differential motion along the " Shaft Fault" could be absorbed with virtually no movement or other deleterious effect on the reactor building.

They also expressed a belief that it could be shown that such a design would accomodate differential motion in the bedrock of as much as one foot without destroying the integrity of the reactor's ultimate containment system.

As a second itey, PG&E representatives handed out copies of Amendment No. / to their application. An important item.of this b

(Continued) 8709230416 851217 PDR FOIA FIRESTOB5-665 PDR.

~

...1

(

l

)

)

4 s.

amendment is a revised plot of earthquake induced accelerations as functions of period for various damping factors. Since this amendment had not been formally submitted, copies which l

had been handed out were collected and returned to Mr. Crane l

who expressed an intention to make a formal submittal immediately.

The PG&E representatives asked for coments from AEC representatives on both of these items. On both items AEC representatives stated that no imediate evaluation could be made but on the other hand no inmediate objection to the design plan or the amendment was raised.

I PG&E representatives stated they would submit the amendment describing plans for absorbing differential motion along the fault by early April. They further expressed a desire to present I

their case to the ACRS at the earliest possible date.