c UNITED STATES GOVERNMENT
/
.?
}demorandum W:
^'
^
/\\
i o
1 Edsca G. Case, Assistant Direcem; j a
pare: AUG 5 123 To for, Facilities Licensing.. }
Division of Licensing and Ixgulation
'l FROM :
L. Roch'411th, Jr., Assistant Diructor i
p'.] '
y'
/
for Reactors f
Division of Compliance b'
/
PACIFIC GAS AND ELECTRIC C(MFANT,BODECA RAY REAcr0R f
l
$UBJECT:
y DOCKET No. 50-205
'c q
l
~
+
~
I Attached is a r.6 port by ou fieLi inspector of a recent vf. sit to the
, subject proposed facility bit.o. Tbd yrincipal results of the visit l
have been discussed Sit'a yn prsnously.
\\
b' Based on considerable discussion and ob ervation, our inspectors
)
reported the following impressions of the U. S. Geological Survey 1.
^
i geologists Schlocker and 3onilla:
i' E
1.
They seemed to be completely objective in that their discussions i
were not related to the Bodega Reactor application, but were I
limited to factual observations they had made of the geology l
r l
of the site.' j/
I 2.
They were extremely cooperative and e:splained in considerabfra
$.:1 detail the significance of their findings to the inspectors f-and the other interested participants.
3.
They appeared to be methodical (a that they spent the entire
- i day making minute (and sometimes microscopic) observations of details associated with the geology of the excavated areas.
I L.b
Attachment:
i Ept by G. S. Spencer
-1
[
dtd 7/24/63 0j Distribution:
J. R. Sears, Region I U
M L. Ernst, Region II g
E. D. Thornburg, Region III p
Q,
, r' d J. W. Plora, Region IV V
f,.; - N
/f R. R. Engelkan, Region i r'
l ~.y,
fp j
'g i(
wye
- u.,
MF
- \\ \\,
?
s O
t.;,.
=$
l 6
+
s~
v n. c 1
8709230336 G51217
[
l
' $6 4 8 '*.
.C