MONTHYEARB13454, Responds to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey. Approx Two NRC Team Insps Conducted at Facilities Each Yr.Two SSFIs Conducted in 19881990-03-0101 March 1990
[Table view]Responds to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey. Approx Two NRC Team Insps Conducted at Facilities Each Yr.Two SSFIs Conducted in 1988 ML20033E2851990-03-0101 March 1990 Responds to Generic Ltr 90-01 Re Request for Voluntary Participation in NRC Regulatory Impact Survey.Completed Questionnaire Includes Info on NRC Insps,Required QA Audits, Nelia & Maelu Insps,State of Mi Insps & FEMA Insps ML17347B5881990-03-0101 March 1990 Responds to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey. Info Covers Time Spent by Key Power Plant Managers in Responding to Operational Insps & Audits ML15217A1031990-02-28028 February 1990 Forwards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1989 for McGuire Nuclear Station Units 1 & 2 & Revised Process Control Programs & Offsite Dose Calculation Manuals ML18094B3221990-02-28028 February 1990 Forwards Executed Amend 14 to Indemnity Agreement B-74 ML20012A0231990-02-27027 February 1990 Informs of Organizational Changes within Div of Reactor Projects,Project Directorate III/2.Change Reassigned Project Managers to Listed Facilities ML20055C3921990-02-26026 February 1990 Approves Util 900214 Request for Use of B&W Steam Generator Plugs W/Alloy 690 as Alternative to Alloy 600.Alternate Matl Is nickel-base Alloy (ASME Designation SB-166) ML20011F3821990-02-26026 February 1990 Confirms Amount Electronically Transferred to Us Dept of Treasury,Nrc on 900223 for Payment of NRC Review Fees of 10CFR50 Applications & 10CFR55 Svcs Per 10CFR170,for Period of 890101-0617 for Listed Invoices ML20006G0621990-02-22022 February 1990 Forwards Revised Proprietary Pages to DPC-NE-2004, Core Thermal Hydraulic Methodology Using VIPRE-01, Reflecting Minor Methodology Changes Made During Review & Approval Process.Pages Withheld ML20006E5881990-02-20020 February 1990 Forwards Proprietary Response to NRC 890725 Questions Re Vipre Core Thermal Hydraulic Section of Topical Rept DPC-NE-3000 & Rev 2 to Pages 3-69,3-70,3-78 & 3-79 of Rept. Encls Withheld (Ref 10CFR2.790) ML20006E9071990-02-16016 February 1990 Discusses Plants Design Control Program.Util Adopted Concept of Design Change Implementation Package (Dcip).Dcip Will Contain or Ref Design Change Notice Prepared Per Approved Procedures ML20006E1441990-02-16016 February 1990 Forwards Suppl to Rev 1 to Updated FSAR for Braidwood Station,Units 1 & 2 & Byron Station,Units 1 & 2,per 881214 & 891214 Submittals ML20033E4551990-02-15015 February 1990 Amends 881128 Application for Amends to Licenses NPF-9 & NPF-17,clarifying Tech Spec 6.2.3 Re Safety Review Group,Per 900212 Discussions W/Nrc.Listed Criteria Replace That of Previous Submittal ML20006E6251990-02-15015 February 1990 Requests Determination That 10CFR26 App a Section 2.7(0)(3)(ii) Does Not Require That Alcohol Breath Analysis Equipment Conform to Both Natl Safety Highway Traffic Safety Admin Stds & State Statutes or Exemptions to 10CFR26 A08496, Ack Receipt of Listed Invoices for Costs Incurred During Routine Reviews of Plant1990-02-15015 February 1990 Ack Receipt of Listed Invoices for Costs Incurred During Routine Reviews of Plant ML20006E4201990-02-14014 February 1990 Requests NRC Approval for Use of Alloy 690 Steam Generator Tube Plugs for Facility,Prior to 900301,pending Final ASME Approval of Code Case for Alloy 690 ML18094B3291990-02-14014 February 1990 Forwards Printouts Containing RW-859 Nuclear Fuel Data for Period Ending 891231 & Diskettes ML20011E6151990-02-12012 February 1990 Forwards Revs 1 to Security Plan & Security Training & Qualification Plan & Rev 2 to Security Contingency Plan. Salem Switchyard Project Delayed.Revs Withheld (Ref 10CFR73.21) ML20006E1511990-02-12012 February 1990 Advises That 891201 Rev 57 to QA Topical Rept CE-1-A Consistent W/Provisions of 10CFR50.App B & Acceptable ML20006F1301990-02-12012 February 1990 Lists Suggested Topics for Licensee Info Conference,Per 900117 Request ML20006D6751990-02-0909 February 1990 Partial Response to FOIA Request for Documents.App Q Documents Encl.App Q & Documents Available in Pdr.App R Documents Totally Withheld (Ref FOIA Exemption 5) ML20006D7831990-02-0808 February 1990 Advises That Board Concluded That Holding Prehearing Telcon Re Scheduling Considered Premature Due to Lack of Record,Per .Request for Future Scheduling Suggested to Be Submitted.W/Certificate of Svc.Served on 900209 B13447, Advises of Changes to Util Distribution Lists for Correspondence from NRC Due to Organizational Title Changes. Revs to Distribution List Encl1990-02-0808 February 1990 Advises of Changes to Util Distribution Lists for Correspondence from NRC Due to Organizational Title Changes. Revs to Distribution List Encl ML20011E5571990-02-0808 February 1990 Forwards Us Bankruptcy Court for Eastern District of Tennessee Orders & Memorandum on Debtors Motion to Alter or Amend Order & Opinion Re Status of Sales Agreement Between DOE & Alchemie.Doe Believes Agreement Expired on 890821 ML20011E4991990-02-0606 February 1990 Discusses Liability & Funding Requirements Re NRC Decommissioning Funding Rules & Verifies Understanding of Rules.Ltr from NRC Explaining Liability & Requirements of Rule Requested ML20011E5981990-02-0505 February 1990 Requests That Listed Individuals Be Deleted from Svc List for Facilities.Documents Already Sent to Dept of Environ Protection of State of Nj ML20006D6911990-02-0202 February 1990 Provides Alternative Design Solution to Dcrdr Implementation at Facilities.Simpler Design Devised,Using Eyelet Screw Inserted in Switch Nameplate Which Is Identical to Providing Caution Cards in Close Proximity to Switch Handle ML20006C4491990-02-0101 February 1990 Requests Telephone Conference Be Set Up at Board Convenience Due to Author Not Being Able to Reach Licensee Counsel ML20006C5661990-01-31031 January 1990 Provides Certification Re Implementation of Fitness for Duty Program Per 10CFR26 at Plants ML18153C0951990-01-29029 January 1990 Forwards Response to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Belief in Appropriateness to Address Generic Ltr 89-13 Concerns within Context of Established Programmatic Improvements Noted ML20006B7961990-01-29029 January 1990 Forwards Summaries of Latest ECCS Evaluation Model Changes ML20006C6711990-01-29029 January 1990 Responds to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Plants Have Established Preventive Maint Program for Intake Structure & Routine Treatment of Svc Water Sys W/Biocide to Control Biofouling ML20006D6611990-01-29029 January 1990 Advises That 900117 License Amend Request to Remove Certain cycle-specific Parameter Limits from Tech Specs Inadvertently Utilized Outdated Tech Specs Pages.Requests That Tech Specs Changes Made Via Amends 101/83 Be Deleted ML20011E2521990-01-29029 January 1990 Forwards Proprietary Safety Analysis Physics Parameters & Multidimensional Reactor Transients Methodology. Three Repts Describing EPRI Computer Code Also Encl.Proprietary Rept Withheld (Ref 10CFR2.790) B13244, Informs of Plans to Resolve Problems Experienced During Last Two Summers W/High Svc Water Temps Slightly Above 90 F. Proposed License Amend Requests Will Be Submitted Limiting UHS Temps for Haddam Neck & Millstone Unit 21990-01-29029 January 1990 Informs of Plans to Resolve Problems Experienced During Last Two Summers W/High Svc Water Temps Slightly Above 90 F. Proposed License Amend Requests Will Be Submitted Limiting UHS Temps for Haddam Neck & Millstone Unit 2 ML20006C0431990-01-29029 January 1990 Forwards Response to NRC Bulletin 89-003.Util Nuclear Fuels Dept Designs or Reviews & Approves Each Core Reload for Plants & Refueling Operations Recently Reviewed to Ensure Appropriate Procedural Controls in Place ML20006C4621990-01-26026 January 1990 Responds to 900117 Joint Request on How NRC & Applicant Counsel Expect to Move Proceeding on Hearing Calendar in New Yr.Applicant Has Expressed Desire to Have Proceeding Held in Abeyance Indefinitely Although NRC Does Not Agree ML18153C0871990-01-26026 January 1990 Responds to NRC Bulletin 89-003, Potential Loss of Required Shutdown Margin During Refueling Operations. Refueling Procedures to Be Revised & Familiarization Sessions Will Be Conducted Prior to Each Refueling Outage ML20006D2431990-01-26026 January 1990 Provides Info Re Emergency Response Organization Exercises for Plants.Exercises & Callouts Would Necessitate Activation of Combined Emergency Operations Facility Approx Eight Times Per Yr,W/Some Being Performed off-hours & Unannounced ML18094B2861990-01-26026 January 1990 Forwards Response to Generic Ltr 89-13, Svc Water Problems Affecting Safety-Related Equipment. Aggressive Program of Monitoring,Insp & Matl Replacement Initiated in Advance of Generic Ltr 89-13 Issuance ML19354E4191990-01-25025 January 1990 Comments Re Issuance of OL Amends & Proposed NSHC Determination Re Transfer of Operational Mgt Control of Plants & Views on anti-trust Issues Re Application for Amend for Plants A08201, Forwards Response to Recommended Actions in Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Recommended Hardware Mods to Be Included as Isap 1.1201990-01-25025 January 1990 Forwards Response to Recommended Actions in Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Recommended Hardware Mods to Be Included as Isap 1.120 A08383, Responds to NRC Bulletin 89-003, Potential Loss of Required Shutdown Margin During Refueling Operations. Personnel Trained in Overall Control Procedure for Fuel Movement1990-01-25025 January 1990 Responds to NRC Bulletin 89-003, Potential Loss of Required Shutdown Margin During Refueling Operations. Personnel Trained in Overall Control Procedure for Fuel Movement ML20006B2011990-01-24024 January 1990 Advises That 891027 Response to Generic Ltr 88-20 Re Individual Plant Exam Approach,Methodology & Schedule Acceptable ML19354E6711990-01-24024 January 1990 Requests Approval to Use Alloy 690 Plugs as Alternative to Requirements of 10CFR55(a),codes & Stds for Plants Prior to 900226 ML17347B5451990-01-24024 January 1990 Informs of Plans to Apply ASME Code Case N-356 at Plants to Allow Certification Period to Be Extended to 5 Yrs.Rev to Inservice Insp Programs Will Include Use of Code Case ML19354E4461990-01-22022 January 1990 Forwards Proprietary Rev 1 to DPC-NE-2001, Fuel Mechanical Reload Analysis Methodology for MARK-BW Fuel, Adding Section Re ECCS Analysis Interface Criteria & Making Associated Administrative Changes.Rev Withheld ML19354E4451990-01-22022 January 1990 Submits Update on Status of RHR Sys Iconic Display at Facilities,Per Generic Ltr 88-17 Re Loss of Dhr.Computer Graphics Display Data in Real Time & Reflect Status of Refueling Water Level & RHR Pump Parameters B13419, Submits Revised Schedule to Resolve USI A-46 Re Generic Implementation Procedures Developed by Seismic Qualification Util Group.If Final NRC SER Issued During First Quarter 1990 Walkdowns Could Be Done During Second Refueling Outage1990-01-22022 January 1990 Submits Revised Schedule to Resolve USI A-46 Re Generic Implementation Procedures Developed by Seismic Qualification Util Group.If Final NRC SER Issued During First Quarter 1990 Walkdowns Could Be Done During Second Refueling Outage ML20005G7161990-01-20020 January 1990 Forwards Rev 1 to Updated FSAR for Braidwood & Byron Units 1 & 2.Changes in Rev 1 Include Facility & Procedures Which Were in Effect as of 890610.W/o Encl 1990-03-01 Category:NRC TO OTHER U.S. GOVERNMENT AGENCY/DEPARTMENT MONTHYEARML20246P4001989-03-23023 March 1989
[Table view]Advises That Financial Assurances for Protection of Common Defense & Security Provided by Alchemie Accepted.Notifies That Any Activities by Alchemie Involving Access to Classified Machines & Info Must Be Under DOE Security ML20153G7431988-04-29029 April 1988 Advises That Second Graded Plant Exercise Will Be Conducted on 880607-09.State & Local Officials Refuse to Participate in Emergency Response Planning.Nrc Requests Space to Operate Federal Control Cell to Simulate State & Local Officials ML20151N2251988-04-26026 April 1988 Discusses Draft Control Plan & Request Review of Plan.If Agreement Reached,Plan Will Then Be Modified to Cover Seabrook Situation.Draft Control Plan Encl ML20195K0681988-01-25025 January 1988 Forwards List of Principal Contacts,Including Util & NRC, to Permit Effective Coordination for FEMA Review of Util Local Offsite Radiological Emergency Response Plan ML20205E9961987-11-0909 November 1987 Forwards Certified Index of Records in Listed Case ML20205E2041987-11-0505 November 1987 Forwards Respondent Motion to Dismiss Commonwealth of Ma in Listed Case ML20211D9811986-10-14014 October 1986 Requests Fr Publication of Encl 861014 Notice of Environ Assessment & Finding of No Significant Impact,Approving Exemptions from Apps a & J & GDC 13 & 17.Publication Requested as Soon as Possible So Licenses Can Be Issued ML20214M0371986-08-22022 August 1986 Requests That Liquid Samples Spiked w/Sr-89,Sr-90,H-3 & Fe-55 Be Sent to Listed Region II Licensees,Except Farley, Per NRC Confirmatory Measurements Program.Samples Should Be Sent within Approx 2 Wks of Ltr Receipt ML20195E9161986-06-0404 June 1986 Forwards DM Stahl,Counsel for Commonwealth Edison Co,860527 Ltr Addressing Allegations of Illinois Municipal Electric Agency Re Need for OL Antitrust Review.Related Correspondence ML20198G7221985-12-18018 December 1985 Forwards Util Request for Exemption Re Plume Exposure Pathway Emergency Planning Zone.Nrc Reviewing Request. W/O Encl ML20235A7441985-12-17017 December 1985 Forwards Rept TEI-837, Geologic & Seismic Investigations of Proposed Nuclear Power Plant Site on Bodega Head,Sonoma County,Ca. W/O Rept ML20214F5951985-09-19019 September 1985 Forwards Std Order for DOE Work, Review of PRA for Seabrook Nuclear Power Plant, Authorizing Extension of Period of Performance from 850930 to 860930 Due to NRC Request to Meet W/Applicant Prior to Issuance of Final Rept ML20214F6031985-08-30030 August 1985 Forwards Std Order for DOE Work for FIN A-3778, Review of PRA for Seabrook Nuclear Power Plant, Authorizing Funds for Encl Statement of Work Mod ML20133N1721985-08-0707 August 1985 Requests Info Re Federal Response Ctr Locations for Incorporation Into Region I Incident Response Plan.Fema Region I Will Be Informed by Phone Upon Activation of Incident Response Ctr ML20133M9161985-08-0707 August 1985 Requests Federal Emergency Response Ctr Locations Proposed by FEMA Region II for Nuclear Power Stations on Encl List. Initial Contact Message That Will Be Used to Notify Region Upon Activation of Incident Response Ctr Encl ML20147D2611985-06-12012 June 1985 Forwards Info Re Requirements of Aws D1.1 & 10CFR50,App B Concerning Steel Welds at Plant ML20209D3421984-09-27027 September 1984 Forwards Project Identification Summary Sheets Outlining Two Addl Tasks for Review of Seismic Design Licensing Condition. Response Re Adequacy of Funding Requested.Meeting W/Usgs in Early Oct Suggested.Tasks Should Be in Place by 850101 ML20138C1471984-09-13013 September 1984 Forwards,For Concurrence,Std Order for DOE Work, Evaluation of Selected NRC Open Items Before Plant Fuel Load, FIN A-6819.INEL Proposal Dtd Sept 1984 Acceptable.Lp Leach 850905 & 20 Ltrs to DOE Encl ML20138C1171984-08-24024 August 1984 Forwards,For Concurrence,Std Order for DOE Work,Changing Statement of Work for Evaluation of Selected NRC Open Items Before Plant Fuel Load, (FIN A-6819,Project 2) ML20244D0241984-08-0707 August 1984 Requests That USGS Send Representatives as Observers to 840823 Meeting to Respond to Questions in Seismology & Geology.Related Documents Encl ML20138C1701984-07-31031 July 1984 Approves DG Bowers & H Margulies as Subcontractors to Assist Inel in Evaluation of Selected NRC Open Items Before Plant Fuel Load, FIN A-6819,Project 2,per Inel 840727 Request.Related Documentation Encl IA-84-751, Approves DG Bowers & H Margulies as Subcontractors to Assist Inel in Evaluation of Selected NRC Open Items Before Plant Fuel Load, FIN A-6819,Project 2,per Inel 840727 Request.Related Documentation Encl1984-07-31031 July 1984 Approves DG Bowers & H Margulies as Subcontractors to Assist Inel in Evaluation of Selected NRC Open Items Before Plant Fuel Load, FIN A-6819,Project 2,per Inel 840727 Request.Related Documentation Encl ML20138C0191984-07-18018 July 1984 Approves CM Rice & W Stratton as Subcontractors to Assist Inel in Evaluation of Selected NRC Open Items Before Plant Fuel Load, FIN A-6819,Project 2,per LP Leach 840717 Request ML20138C0051984-07-0202 July 1984 Forwards Std Order for DOE Work,Supporting Evaluation of Selected NRC Open Items Before Plant Fuel Load, FIN A-6819,Project 2.Proposal Requested within 14 Days ML20126E0591984-05-0303 May 1984 Forwards Std Order for DOE Work: Resolution of Waterford Unit 3 QA, Approved as Modified ML20128D6621984-04-0303 April 1984 Forwards Std Order for DOE Work: Review of Seabrook Nuclear Power Plant PRA, Issued to Lll.Requests Proposal Be Submitted within 40 Days ML20093C4541983-12-28028 December 1983 Forwards Rev 3 to Lilco Transition Plan,Per 831222 Memo.Fema Rept Expected on 840201.W/o Encl ML20127E9671983-11-0101 November 1983 Forwards Unexecuted Std Order for DOE Work for FIN A-3711, Safety Evaluation of Core Melt Accidents:Casework Reviews for Gessar,Limerick & Fnp ML20127M9671983-10-20020 October 1983 Forwards Std Order for DOE Work: Safety Evaluation of Core-Melt Accidents:Operating Reactor Reviews for Indian Point & Zion, Providing Addl Funding to Complete Work in Oct 1983 ML20128M7391983-09-12012 September 1983 Forwards Draft Vols I-III of BMI-2104 Re Ongoing Source Term Reassessment Study.W/O Encls ML20127M7991983-09-0202 September 1983 Forwards Std Order for DOE Work: Safety Evaluation of Core-Melt Accidents:Operating Reactor Reviews for Indian Point & Zion, Providing Funds for Work During Oct 1983 ML20127E7131983-08-25025 August 1983 Forwards Unexecuted Std Order for DOE Work,Authorizing Transfer of Funds from FIN A-3346, Containment Sys Case Reviews to FIN A-3711, Safety Evaluation of Core-Melt Accidents:GESSAR-FDA,Limerick & Fnp ML20127A8241983-08-0404 August 1983 Forwards Std Order for DOE Work: Safety Evaluation of Core- Melt Accidents;Operating Reactor Reviews for Indian Point & Zion ML20244C3751983-07-0606 July 1983 Requests Info on Presence of Plant & Animal Species Listed or Proposed as Threatened or Endangered,In Vicinity of Site as Shown on Encl Maps ML20101C7441983-04-13013 April 1983 Forwards Std Order for DOE Work: Safety Evaluation of Core- Melt Accidents:CESSAR-FDA,Westinghouse Std Plant-FDA, for Issuance to BNL ML20244C1641983-03-30030 March 1983 Confirms 830328 Telcon Re Postponement of 830330 Meeting on Questions for Util to 830414 in Bethesda,Md.New Date for Submittal of Final Questions to Div of Licensing Is 830419 ML20155C0101983-02-11011 February 1983 Forwards Std Form 83,supporting Statement Covering Info Collection Requirement Re Licensee Analyses of Significant Hazards Issues in Amend Requests & SECY-83-16 & SECY-83-16A. Approval Requested by 830213.W/o Secy Papers ML20127A4471983-01-24024 January 1983 Forwards Std Order for DOE Work: Safety Evaluation of Core Melt Accidents:Indian Point-OR & Zion-OR, Providing Addl Funding for FY83 ML20127A4361983-01-24024 January 1983 Forwards Std Order for DOE Work: Safety Evaluation of Core- Melt Accidents:Gessar - Fda,Limerick - Ol,Fnp - Ml ML20101C7221983-01-0404 January 1983 Requests Proposal from BNL to Provide Technical Assistance Through FY85 for Safety Evaluation of Core-Melt Accidents: CESSAR-FDS,Westinghouse Std Plant - Fda. Statement of Work Encl ML20127M2961982-12-30030 December 1982 Forwards Std Order for DOE Work: Safety Evaluation of Core-Melt Accidents:Indian Point Operating Reactor & Zion Operating Reactor, Accepting BNL 821203 Proposal & Providing Funds to Begin Work ML20127E4571982-12-30030 December 1982 Forwards Unexecuted Std Order for DOE Work for Safety Evaluation of Core Melt Accidents:GESSAR-FDA,Limerick-OL & FNP-ML ML20064L2421982-04-0808 April 1982 Forwards Std Order for DOE Work: Evaluation of TMI-1 Steam Generator Corrosion ML20049K0661982-03-25025 March 1982 Forwards Portions of Hearing Transcripts in Which FEMA Witnesses Testified,In Response to .W/O Encl ML20244B5911981-09-0303 September 1981 Extends Appreciation for Participation & Assistance in Hearing.Knowledgeable Presentation at Hearing & Invaluable Guidance Before & During Hearing Contributed to Effective NRC Staff Presentation ML20244B5791981-09-0303 September 1981 Extends Appreciation for Participation & Assistance in Hearing.Knowledgeable Presentation at Hearing & Invaluable Guidance Before & During Hearing Contributed to Effective NRC Staff Presentation ML20244B5751981-09-0303 September 1981 Commends Hg Greene Participation in NRC Hearing,Which Contributed to Development of Sound & Complete Record on Complex Issue in Proceeding.Appearance Was Articulate & Presented in Forthright & Knowledgeable Fashion ML20054D4151981-05-0808 May 1981 Forwards Std Order for DOE Work: Development of Methodology for Evaluating Equipment Survivability in Environ of Burning Hydrogen for Sequoyah & Mcguire ML20083L3681981-01-21021 January 1981 Forwards Short & long-term OL & CP Review Schedules,In Response to 801216 Meeting W/Usgs.List of OL Plant Reviews for Which NRC Tentatively Plans to Seek USGS Assistance Is Provided IR 05000272/19800221980-11-25025 November 1980 Forwards Section 236 to Atomic Energy Act of 1954,including Amend Re Sabotage of Nuclear Facilities,Codified as 42USC2284,per 801120 Telcon.Ie Investigation Rept 50-272/80-22 Available 1989-03-23 Category:OUTGOING CORRESPONDENCE MONTHYEARML20012A0231990-02-27027 February 1990
[Table view]Informs of Organizational Changes within Div of Reactor Projects,Project Directorate III/2.Change Reassigned Project Managers to Listed Facilities ML20055C3921990-02-26026 February 1990 Approves Util 900214 Request for Use of B&W Steam Generator Plugs W/Alloy 690 as Alternative to Alloy 600.Alternate Matl Is nickel-base Alloy (ASME Designation SB-166) ML20006E1511990-02-12012 February 1990 Advises That 891201 Rev 57 to QA Topical Rept CE-1-A Consistent W/Provisions of 10CFR50.App B & Acceptable ML20006D6751990-02-0909 February 1990 Partial Response to FOIA Request for Documents.App Q Documents Encl.App Q & Documents Available in Pdr.App R Documents Totally Withheld (Ref FOIA Exemption 5) ML20006B2011990-01-24024 January 1990 Advises That 891027 Response to Generic Ltr 88-20 Re Individual Plant Exam Approach,Methodology & Schedule Acceptable ML20005H0991990-01-16016 January 1990 Informs of Temporary Rotational Assignment of Eg Adensam to Regional Ofc from 900108-0220.Author Will Be Acting Project Director During Adensam Absence ML20006A9731990-01-16016 January 1990 Provides Info Re Generic Fundamentals Exam Section of Operator Licensing Exam on 900207 & Advises That Results of Exam Should Be Available within 3 Wks Following Completion of Exam ML20005H2171990-01-10010 January 1990 Provides Info Re Generic Fundamentals Exam Section of Operator Licensing Written Exams to Be Administered in Feb 1990.List of Lodging in Immediate Area Listed in Encl 1 & Preliminary Instructions for Taking Exams Listed in Encl 2 ML20005F1701990-01-0909 January 1990 Forwards Safety Evaluation Concluding That Use of Mobil Greases for Limitorque Actuators as Substitute for Currently Used Exxon Greases Acceptable,In Response to NRC Diagnostic Evaluation Team Aug 1986 Insp Findings ML20005F2721990-01-0909 January 1990 Reviews 60-day Response to Generic Ltr 88-20 Re Individual Plant Exams.Individual Plant Exam Approach,Methodology & Schedule Acceptable.Util Should Submit Results on More Expeditious Schedule than 3-yr Time Period to Avoid Delays ML20006D7051990-01-0505 January 1990 Forwards Revised NRC Forms 396 & 398,personal Qualifications Statement & Certification of Medical Exam by Licensee, Respectively ML20006D7221990-01-0505 January 1990 Forwards Revised NRC Forms 396 & 398 Re Personal Qualifications Statement - Licensee & Certification of Medical Exam by Facility Licensee,Respectively.Applications for Licenses Should Be Submitted on Encl Forms by 900201 ML20006D9031990-01-0505 January 1990 Forwards Revised NRC Forms 398 & 396 Re Personal Qualifications statement-licensee & Certification of Medical Exam by Facility Licensee,Respectively.Applications for Licenses Should Be Submitted on Revised Forms by 900201 ML20005F3721990-01-0404 January 1990 Agrees That Refs to H.A.F.A Rept 1009-88 Need Not Be Deleted Since Merely Identifying Rept Discloses No Confidential Info,Per 891219 Request & Affidavit to Withhold Info Contained in Insp Repts 50-255/89-26 & 50-346/89-21 ML20005G2281990-01-0404 January 1990 Confirms 891211 Telcon Re Mgt Meetings Scheduled for 900130 & 31 in Huntersville,Nc & York,Sc,Respectively,To Review Results of SALP Program for Facilities ML20006B5231990-01-0303 January 1990 Discusses RB Clough Vs NRC & SA Hiett Vs Pse&G Challenging Random Drug Testing Plans,Per NRC Fitness for Duty Rule 10CFR26.Recipient Will Be Kept Apprised of Developments in Cases ML20005D8381989-12-20020 December 1989 Advises That Documentation for Simulation Facility Certification Per 10CFR55.45(b)(2) Complete,Based on Review of 891007 Submittal.Simulator Will Be Used for Administering Operating Tests ML20005G3621989-12-18018 December 1989 Forwards Revised NRC Forms 396 & 398 Re Certification of Medical Exam by Facility Licensee & Personal Qualification statement-licensee,respectively,reflecting Changes of Operator Licensing Process ML20011D7091989-12-18018 December 1989 Forwards NRC 41st Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants for Jul-Sept 1989. on 890622,Seabrook Manually Shut Down During Low Power Test. ASLB Ordered License Issued for Seabrook on 891109 ML19332G4061989-12-11011 December 1989 Confirms 891220 Meeting W/Util in Downers Grove,Il to Discuss Items of Mutual Interest Re Operation of Util Facilities ML19351A3701989-10-0505 October 1989 Forwards Insp Repts 50-062/89-03 & 50-396/89-01 on 890918-21.No Violations or Deviations Noted.Unresolved Items Identified in Rept Will Be Pursued During Future Insps IA-89-409, Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6)1989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) ML20247R3361989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) ML20248G9731989-09-20020 September 1989 Forwards Unexecuted Amend 13 to Indemnity Agreement B-69, Reflecting Increase in Primary Layer of Nuclear Energy Liability Insurance Provided by ANI & Maelu ML20248F0321989-09-14014 September 1989 Forwards Rept of AOs at Licensed Facilities for First Calendar Quarter 1989.Plug Failure Resulted in Steam Generator Tube Leak at North Anna Unit 1 & Steam Generator Ruptured at McGuire Unit 1.W/o Encl ML20247L2401989-09-13013 September 1989 Responds to Re K Barnes Concerns Regarding Safety at Plants.Advises That to Date,Releases from Plants Remain Well within Accepted Stds ML20247G2781989-09-13013 September 1989 Partial Response to FOIA Request for Records.Apps F & G Records Available in Pdr.App H Records Partially Withheld & App I Record Completely Withheld (Ref FOIA Exemption 5) ML20247H6411989-09-12012 September 1989 Advises That 890816 Revisions to ATWS Mitigation Sys Acceptable W/Requirements of 10CFR50.62(c)(1) ML20247K2231989-09-11011 September 1989 Forwards Amends 123 & 41 to Licenses DPR-61 & NPF-49, Respectively & Safety Evaluation.Amends Change Tech Specs 4.10.1.D.1.h & 4.4.5.4.a.8 to Allow Insp of Steam Generator Tubes by Insertion of Ultrasonic Test Probe ML20247E3371989-09-0707 September 1989 Forwards Amends 122,34,143 & 40 to Licenses DPR-61,DPR-21, DPR-65 & NPF-49,respectively & Safety Evaluation.Amends Change Tech Spec Sections 6.10.2.m & 6.10.3 Re Records Retention for Radiological Effluent Monitoring & ODCM ML20246Q0121989-08-31031 August 1989 Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted IR 05000029/19890141989-08-31031 August 1989 Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted ML19351A2441989-08-29029 August 1989 Forwards Settlement Agreements Identified as Containing Language That May Restrict Right of Individuals to Bring Safety Concerns to NRC Attention & Settlement Agreements Containing Questionable Provisions.W/O Encls ML20246K8571989-08-25025 August 1989 Discusses NRC Actions in Reponse to Constituent Concerns Re Excessive Overtime Worked by Employees of Plants ML20246B6591989-08-18018 August 1989 Forwards 40th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants from Apr-June 1989. Lilco Shareholders Voted to Accept Terms That Provide for Sale of Plant to State of Ny ML20246C7101989-08-18018 August 1989 Forwards Order,Effective Immediately,Modifying CPs CPEP-1 & CPEP-2 to Require Notification of Commission Before Taking Possession of Any Classified Equipment & to Show Cause Why CPs Should Not Be Revoked ML20246C8161989-08-16016 August 1989 Partial Response to FOIA Request for Documents.App D & E Documents Available in Pdr.App E Documents Encl ML20246C3941989-08-15015 August 1989 Forwards Safeguards Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14.No Violations Noted ML20246C8211989-08-11011 August 1989 Confirms 890808 Telcon Re Util Participation in NRC Regulatory Impact Survey on 891023 in Berlin,Ct.Schedule & General Discussion Groups Shown in Encl ML20248D6921989-08-0404 August 1989 Advises That Rev 6b to Generating Stations Emergency Plan Transmitted by Util 890710 Form Acceptable & Does Not Decrease Effectiveness of Plan ML20248C0561989-08-0303 August 1989 Forwards Sser Accepting 880601,0909 & 890602 Changes to ATWS Mitigation Sys Actuation Circuitry for Plants.Nrc Requested to Be Notified Upon Completion of Human Factors Review ML20245H5331989-08-0202 August 1989 Advises That 890519 Changes to QA Program Described in CPC-2A Acceptable.Issues Addressed Listed ML20247P9581989-08-0101 August 1989 Partial Response to FOIA Request.App a Records Available in Pdr.App B Records Encl & Available in PDR ML20247H6891989-07-25025 July 1989 Requests Proposed Design Change to Containment Hydrogen Monitoring Sys,W/Schedule for Implementing Change or Justification for Existing Configuration ML20247F0481989-07-25025 July 1989 Partial Response to FOIA Request for Records.App L Record Available in Pdr.App M Records Partially Withheld Ref (FOIA Exemption 7).App N Record Provided to Requestor But Not Made Publicly Available at This Time ML20246P0181989-07-17017 July 1989 Forwards Request for Addl Info Re 890620 Filing for Reorganization in Us Bankruptcy Court.Nrc Will Initiate Proceeding for Suspension or Revocation of CPs Should Licensee Fail to Respond by 890815 ML20246A2951989-06-29029 June 1989 Forwards Request for Addl Info Re NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs ML20246L2211989-06-26026 June 1989 Forwards Amends 118,33,142 & 36 to Licenses DPR-61,DPR-21, DPR-65 & NPF-49,respectively & Safety Evaluation.Amends Revise Tech Specs by Removing Tech Spec Figures 6.2-1 & 6.2-2 Re Organizations Functional Requirements ML20245J3301989-06-22022 June 1989 Provides Background Info on Regulatory Analysis Supplementing NRC Proposed Backfit,Per 890413 Request.Util Expected to Provide Schedule for Implementation of Required Improvements ML20245B4271989-06-21021 June 1989 Final Response to FOIA Request.App U Records Encl & Available in Pdr.App V Record Withheld (Ref FOIA Exemption 5) 1990-02-09 |
Text
. _ _ _ _ _ - _
6 Docket No. 50-205 SEP ? J 1964 Mr. Thomas B. Nolan Director Geological Survey Department of the Interior Washington, D. C.
Dear Mr. Colan:
Transmitted nerewith for your use is a copy of Amendment No. 9, dated September 16, 1964, to the facility licensa application from Pacific Gas and Electric Company for the proposed nuclear reactor at Bodogn Bay, California.
Sincerely yours, Original signed by:
Roger S. Boyd Roger S. Boyd, Chief Research In Power Reactor Safety Branch Division of Reactor Licensing
Enclosure:
As stated above Dis tribu tion EosaeY
$9 DoA-20**
Muppl.
DRL Reading R&PRSB Reading i
Originator: NDMason bec: C. Eason H. Steele i
E. G. Case
...g DR
~