ML20234D690
Text
_
I g i
Piles
)
- t 3'g se' Edson_ G. Case, Assistant Director Division of Reactor Licensing l
NEWlMRK CONSULTING ENGINEERING SERVICES, CONTRACT AT(h9-5)-2667 1
1 i
l The services outlined in Dr. Newmark's letter of October 5,196h to the Cornission have been performed
']
in connection with the. Regulatory Staff's safety -
evaluation of the Bode 6a Bay and Malibu reactors.
With respect to the trip to Bethesda on September 16 for the meeting on September 17, it should be noted' that the, statement of expenses indicates that this meeting involved travel from Washington to New York.
However, sinceethe work under the sub ject contract did not require this part of the trip, I presume that Dr. Newmark has claimed reimbursement from Washington to New York in lieu of Washington to
- Urbana, cc: Administrative Officer,. REG Division of Contra ets r
OFTICE >
....h.h.
SURNAME >
.k 2.;bh,...
10/_/6h oArE >
IMrtu AEC.8 th (Her. 941)
,......,,,,,,,,,,,,,ics 1Hs7as-a 8709220166 851217 PDR FOIA FIRESTOBS-665 PDR
-