ML20234D574

From kanterella
Jump to navigation Jump to search
Informs That USGS Conducting Field Study of & Facility & Consultants Retained by AEC to Evaluate PG&E Application. Procedures Re Licensing of Power Reactors Described,Per Response to .W/O Encl
ML20234D574
Person / Time
Site: 05000000, Bodega Bay
Issue date: 07/16/1963
From: Price E
US ATOMIC ENERGY COMMISSION (AEC)
To: Smith E
AFFILIATION NOT ASSIGNED
Shared Package
ML20234A767 List: ... further results
References
FOIA-85-665 NUDOCS 8709220132
Download: ML20234D574 (2)


Text

_

l I

DLRsCTS l

Docket Ho. 50 205 DUL 161963 wt

+

1 Miss Ernestino I. Caith l

7 1524 Fai.e Caks court i

Santa Rosa, California

(

i

Dear 21:

a nith:

This replies to your letter of Usy 26,1963 eddressed to Chaiman i

Ecaborg cud enclocing a copy of your letter to the Secrotary of 3

1 the Interior in thich you c=prossed concern with respect to the i

proposed construction of a nuclesr potter reactor at Eodega Head,

i California particularly regarding the prc=icity of the proposed

_1i cite to the San Andreas Fault.

-j At the Cc:::miscion's request, h U. S. Geological Darrey has been conducting a thorcugh field study of the geology of Bodega Head eineo early Eny. In cddition, c= pert consultants have been retained j

to assist the AEC Regulatory Staff in evaluating Pacific Cas &

1 Elcetric Compav's application with respect to the seic:alogy of 4.r the area and structural decign of the proposed plant. Final action en the Pacific Cas & Electric Company application will not be taken until h report by the U. S. Ocological Survey has been received

-.y cnd evaluated. Further, a constructica pcmit sin not be issued

?"

nnieso the Ccc=1ccion, fonouirg a public hoaring cnd a decisien d

by the Atosio Safety and Licencing Esard cnd consideration of a n factors bearing upon safety is convinced that the facility can be constructed and operated at the proposed location without undue rick to the health end cafoty of the publio.

Faclocod is a pa:phlet sd2ich describes % procodures relating to the licensing of pwar reactora by the Atcato Energy Cec =icsion.

l j

The public vin be given thirty days notice of the date of the public hearing to be held at Santa Rosa in this catter through a l

notice published in the Fodcral Ecgister. In addition, a public announconont win be issued.

We feel confident that these procedures end their provision for l

public hearing uin enable on intorested per:cus to acquaint thensolves with the details of Pacific Gas & Electric Cc:png's s

2 emer >

....... 22.

l l

$URNAME>

om>

l Forrn Al'C-318 (Rev. H3)

e. s. seves=*e=, ee.ams omer 16427st-s 8709220132 851217 PDR FDIA FIRESTOBS-665 PDR-

r O.

\\

t mas Ernestine I. a:tth DiDL i 6 W53

~

proposal and trill cesure thorough consideration of all.8 ;.ccts of tha proposed plant bearing upon the question of whether it can be.

constructed and operated at the proposed alte withont inadus riisk to the health and safety of the public.

Sincerely yours,

.4 DrfdEl 5; ped f Der L trice

- l Iber 2. Price J.

Assistant Director Division of Lleensing "j

and Regulation l

Enclosures

.2.f+j haphict

-'W Distribution:

i Fomal 1

1 Supplemental Public Document Room (2)

G. Hadlock, 000-

..:..T.

4 C. T. Edwards

~

{

' =.. p;n

]

~

  • 1 i z., '.,

7:by

,
G

~

\\

~

l l

av

~

e I

, 4,

.- - 3.

f

+'V g _

,y<

l

}-

', ' 2 ' '.

/

if F

DL D.LR.M d ce omer >

Cm dun,>.s

.sa

_. em...

m ea

_m.......

._.__m,_,_m.__-.m-a----.

- - - - - - - - - -