MONTHYEARML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H6451989-08-0404 August 1989 Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR ML20248D1431989-07-27027 July 1989 Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants ML20247B7541989-07-19019 July 1989 Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete ML20247E6721989-07-17017 July 1989 Proposes Closeout of Plant Correspondence Control Ticket Re Environ Conservation Organization Request for Notification Whenever License Amend Requests Result in Impairment of Plant Operability.Intervenor Will Be Placed on Svc List ML20246K5991989-07-12012 July 1989 Notification of 890725 Meeting W/Util in Birmingham,Al to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Meeting Agenda Encl ML20246L6801989-07-10010 July 1989 Notification of Significant Licensee Meeting 89-101 W/Util on 890718 in King of Prussia,Pa to Discuss Util Engineering Reorganization ML20247A9561989-07-0606 July 1989 Notification of 890717 Meeting W/Lead Plant Utils in Rockville,Md to Discuss Implementation of Revised STS ML20246H3771989-05-12012 May 1989 ALAB-913.* Advises That Time Provided within Which Commission May Act to Review Aslab Decision ALAB-913 Expired.Commission Declined Review.Decision Became Final on 890501.W/Certificate of Svc.Served on 890512 ML20246P9601989-05-10010 May 1989 Discusses 890413 Meeting W/Rosemount & Industry Re Malfunctions of Rosemount Transmitters.List of Attendess, Agenda,Nrc Info Notice 89-042 & Viewgraphs Encl ML20245E9781989-04-17017 April 1989 Forwards Regulatory History AC83-2 Re Licensee Action During Natl Security emergency,10CFR50 (54FR7178) ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20244E2681989-04-12012 April 1989 Summary of Operating Reactors Events Meeting 89-015 on 890412.Discussion of Events,List of Attendees & Three Significant Items Identified for Input Into NRC Performance Indicator Program & Summary of Reactor Scrams Also Encl ML20244A5571989-04-10010 April 1989 Notification of 890502 Meeting W/Util in Rockville,Md to Discuss Nonlinear Piping Analysis to Remove Snubbers & Pipe Supports ML20244A5461989-04-10010 April 1989 Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Using Leak Before Break Methodology on Lines Connected to RCS ML20247B7351989-03-24024 March 1989 Notification of 890503 Meeting W/B&W,Inel & Util in Rockville,Md to Discuss Licensing Submittals for Plants ML20236A9721989-03-0707 March 1989 Forwards Feb 1989 Status Rept Re Current Review Milestones for Each Std Plant Project ML20235S6271989-02-28028 February 1989 Notification of 890307 Meeting W/Bwr Owners Group in Rockville,Md to Discuss Items of Current Interest.Agenda Encl ML20246N3171989-02-23023 February 1989 Notification of 890313 Meeting w/C-E in Rockville,Md to Discuss Results of Salem Project & Licensing of Future C-E Projects ML20245E9441989-01-31031 January 1989 Forwards Proposed plant-specific Backfit for Improved Auxiliary Feedwater Sys Reliability Analyses for Required Improvement in Secondary DHR Capability at Plant ML20196C2701988-12-0202 December 1988 Notification of 881207 Meeting W/Util in Rockville,Md to Discuss Dcrdr Submittal of 880825 ML20196B6081988-11-29029 November 1988 Forwards Status Rept for Nov 1988 Re Std Plant Design Technical Reviews ML20206M9231988-11-23023 November 1988 Lists Questions Raised by Board Study of Licensee Environ Repts on Facilities,For Responses & Comments.Served on 881125 ML20195J0141988-11-22022 November 1988 Notification of 881214 Meeting W/Util in Rockville,Md to Discuss Licensing Actions at Plants ML20206J6441988-11-16016 November 1988 Requests Responses to Listed Questions Re Proceeding, Including Explanation of Environ Consequences Caused by Movement of Centrifuges from State of Oh to State of Tn. Served on 881117 ML20206E6361988-11-14014 November 1988 Forwards Fr Notice Re Applications for Amends to Licenses DPR-51,NPF-6 & NPF-38,authorizing Addition of Sys Energy Resources,Inc as Licensee & Requests Comments on Antitrust Issues ML20206J5741988-11-10010 November 1988 Forwards H Thompson as Balance of NRC Response to State of Tn Re Enrichment of Naturally Occurring Radionuclides in Proposed Facilities,Per NRC ML20206J5571988-11-0909 November 1988 Forwards NRC Review & Evaluation of Facilities Security Plans Discussing Equipment & Procedures Used by Applicant to Meet Requirements in 10CFR95.W/o Encl ML20195G2581988-11-0808 November 1988 Partially Deleted Memo Re Commissioner Carr 880113-15 Visit to Plant,Meeting W/State of Mo Officials & Visit to Mallinckrodt,Inc ML20205T6491988-11-0707 November 1988 Ack Receipt of to Chairman Zech Re Alchemie Applications to Operate Facility for Separation of Stable Isotopes at Oak Ridge,Tn & Construct Similar Facility at Oliver Springs,Tn ML20205T5821988-11-0707 November 1988 Notification of 881115 Meeting W/Devonrue & Util in Rockville,Md to Discuss Proposed Std Alternate AC Design to Meet Station Blackout Rule ML20205R6731988-11-0404 November 1988 Forwards NRC Testimony of Jj Swift Addressing ASLB Inquiries of 881018 & Two Attachments.Related Correspondence ML20205N3691988-10-28028 October 1988 Advises That ASLB Tentatively Calling for Telcon on 881109 W/Parties & State of Tn to Discuss Need for Further Prehearing Conference & Other Scheduling Matters,Per 881026 Request.Served on 881031 ML20206B2481988-10-27027 October 1988 Notice of Significant Licensee Meeting 88-174 on 881118 in King of Prussia,Pa to Discuss Configuration Mgt ML20195B6131988-10-26026 October 1988 Forwards Status Rept on Std Plant Design Technical Reviews ML20205K3321988-10-26026 October 1988 Forwards SER Re Const Mod & Licensing of & Application for CP for Facilities.Nrc Review of Safeguards/Security Plans for Two Proposed Facilities Sent to Board & Applicant.Telcon to Discuss Scheduling Matters Requested.W/O Encls ML20155H3621988-10-18018 October 1988 Requests Addl Info Re NRC Environ Assessments Submitted on 880914 for Uncontested Proceedings,To Complete Review of Adequacy of NEPA Assessments.Served on 881018 ML20204G0741988-10-17017 October 1988 Forwards Mh Mobley from State of Tn to NRC Not Received Until 881014.NRC Will Address Matters in Ltr in SER ML20204J5841988-10-12012 October 1988 Forwards AEOD/E807, Pump Damage Due to Low Flow Cavitation, in Response to Item 5 of Actions Directed by EDO to Respond to Diagnostic Evaluation Team Rept.Nrr Issued Bulletin 88-004 Addressing Low Flow Problem ML20205L2281988-10-12012 October 1988 Forwards AEOD/e807, Pump Damage Due to Low Flow Cavitation, in Response to Action Item 5 Assigned by EDO in 880406 Memo Re Diagnostic Evaluation Team Rept for Plant. NRR Issued Bulletin 88-004 Addressing Recirculation Problem ML20155C6941988-10-0505 October 1988 Advises That Review Briefing for Listed Plants Scheduled for 881013.Viewgraphs Encl ML20205Q4941988-10-0303 October 1988 Discusses Concerns Raised by State of Tn Re Abundance of Naturally Occurring Radioactivity in Alchemie Processing. Enrichment of Naturally Occurring Radioisotopes Will Not Pose Significant Health Hazard ML20206E0861988-09-28028 September 1988 Requests Verbal Concurrence W/Publishing Notice of Receipt of Petition for Rulemaking PRM-50-50,per 880926 Telcon W/ C Young.Related Info Encl 1990-02-26
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H6451989-08-0404 August 1989 Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR ML20248D1431989-07-27027 July 1989 Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants ML20247B7541989-07-19019 July 1989 Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete ML20247E6721989-07-17017 July 1989 Proposes Closeout of Plant Correspondence Control Ticket Re Environ Conservation Organization Request for Notification Whenever License Amend Requests Result in Impairment of Plant Operability.Intervenor Will Be Placed on Svc List ML20246K5991989-07-12012 July 1989 Notification of 890725 Meeting W/Util in Birmingham,Al to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Meeting Agenda Encl ML20246L6801989-07-10010 July 1989 Notification of Significant Licensee Meeting 89-101 W/Util on 890718 in King of Prussia,Pa to Discuss Util Engineering Reorganization ML20247A9561989-07-0606 July 1989 Notification of 890717 Meeting W/Lead Plant Utils in Rockville,Md to Discuss Implementation of Revised STS ML20246D8841989-06-19019 June 1989 Staff Requirements Memo Re 890601 Briefing on Operating Reactors & Fuel Facilities in Rockville,Md.Commission Expressed Disappointment in Long Term Operating Performance of Turkey Point Nuclear Power Plant ML20246H3771989-05-12012 May 1989 ALAB-913.* Advises That Time Provided within Which Commission May Act to Review Aslab Decision ALAB-913 Expired.Commission Declined Review.Decision Became Final on 890501.W/Certificate of Svc.Served on 890512 ML20246P9601989-05-10010 May 1989 Discusses 890413 Meeting W/Rosemount & Industry Re Malfunctions of Rosemount Transmitters.List of Attendess, Agenda,Nrc Info Notice 89-042 & Viewgraphs Encl NUREG-1353, Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-13531989-05-0202 May 1989 Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-1353 ML20245E9781989-04-17017 April 1989 Forwards Regulatory History AC83-2 Re Licensee Action During Natl Security emergency,10CFR50 (54FR7178) ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20244E2681989-04-12012 April 1989 Summary of Operating Reactors Events Meeting 89-015 on 890412.Discussion of Events,List of Attendees & Three Significant Items Identified for Input Into NRC Performance Indicator Program & Summary of Reactor Scrams Also Encl ML20244A5571989-04-10010 April 1989 Notification of 890502 Meeting W/Util in Rockville,Md to Discuss Nonlinear Piping Analysis to Remove Snubbers & Pipe Supports ML20244A5461989-04-10010 April 1989 Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Using Leak Before Break Methodology on Lines Connected to RCS ML20247B7351989-03-24024 March 1989 Notification of 890503 Meeting W/B&W,Inel & Util in Rockville,Md to Discuss Licensing Submittals for Plants ML20236A9721989-03-0707 March 1989 Forwards Feb 1989 Status Rept Re Current Review Milestones for Each Std Plant Project ML20235S6271989-02-28028 February 1989 Notification of 890307 Meeting W/Bwr Owners Group in Rockville,Md to Discuss Items of Current Interest.Agenda Encl ML20246N3171989-02-23023 February 1989 Notification of 890313 Meeting w/C-E in Rockville,Md to Discuss Results of Salem Project & Licensing of Future C-E Projects NUREG/CR-5176, Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants1989-02-14014 February 1989 Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants ML20245E9441989-01-31031 January 1989 Forwards Proposed plant-specific Backfit for Improved Auxiliary Feedwater Sys Reliability Analyses for Required Improvement in Secondary DHR Capability at Plant ML20196C2701988-12-0202 December 1988 Notification of 881207 Meeting W/Util in Rockville,Md to Discuss Dcrdr Submittal of 880825 ML20196B6081988-11-29029 November 1988 Forwards Status Rept for Nov 1988 Re Std Plant Design Technical Reviews ML20206M9231988-11-23023 November 1988 Lists Questions Raised by Board Study of Licensee Environ Repts on Facilities,For Responses & Comments.Served on 881125 ML20195J0141988-11-22022 November 1988 Notification of 881214 Meeting W/Util in Rockville,Md to Discuss Licensing Actions at Plants ML20206J6441988-11-16016 November 1988 Requests Responses to Listed Questions Re Proceeding, Including Explanation of Environ Consequences Caused by Movement of Centrifuges from State of Oh to State of Tn. Served on 881117 ML20206E6361988-11-14014 November 1988 Forwards Fr Notice Re Applications for Amends to Licenses DPR-51,NPF-6 & NPF-38,authorizing Addition of Sys Energy Resources,Inc as Licensee & Requests Comments on Antitrust Issues ML20206J5741988-11-10010 November 1988 Forwards H Thompson as Balance of NRC Response to State of Tn Re Enrichment of Naturally Occurring Radionuclides in Proposed Facilities,Per NRC ML20206J5571988-11-0909 November 1988 Forwards NRC Review & Evaluation of Facilities Security Plans Discussing Equipment & Procedures Used by Applicant to Meet Requirements in 10CFR95.W/o Encl ML20195G2581988-11-0808 November 1988 Partially Deleted Memo Re Commissioner Carr 880113-15 Visit to Plant,Meeting W/State of Mo Officials & Visit to Mallinckrodt,Inc ML20205T5821988-11-0707 November 1988 Notification of 881115 Meeting W/Devonrue & Util in Rockville,Md to Discuss Proposed Std Alternate AC Design to Meet Station Blackout Rule ML20205T6491988-11-0707 November 1988 Ack Receipt of to Chairman Zech Re Alchemie Applications to Operate Facility for Separation of Stable Isotopes at Oak Ridge,Tn & Construct Similar Facility at Oliver Springs,Tn ML20205R6731988-11-0404 November 1988 Forwards NRC Testimony of Jj Swift Addressing ASLB Inquiries of 881018 & Two Attachments.Related Correspondence ML20205N3691988-10-28028 October 1988 Advises That ASLB Tentatively Calling for Telcon on 881109 W/Parties & State of Tn to Discuss Need for Further Prehearing Conference & Other Scheduling Matters,Per 881026 Request.Served on 881031 ML20206B2481988-10-27027 October 1988 Notice of Significant Licensee Meeting 88-174 on 881118 in King of Prussia,Pa to Discuss Configuration Mgt ML20205K3321988-10-26026 October 1988 Forwards SER Re Const Mod & Licensing of & Application for CP for Facilities.Nrc Review of Safeguards/Security Plans for Two Proposed Facilities Sent to Board & Applicant.Telcon to Discuss Scheduling Matters Requested.W/O Encls ML20195B6131988-10-26026 October 1988 Forwards Status Rept on Std Plant Design Technical Reviews ML20155H3621988-10-18018 October 1988 Requests Addl Info Re NRC Environ Assessments Submitted on 880914 for Uncontested Proceedings,To Complete Review of Adequacy of NEPA Assessments.Served on 881018 ML20204G0741988-10-17017 October 1988 Forwards Mh Mobley from State of Tn to NRC Not Received Until 881014.NRC Will Address Matters in Ltr in SER ML20205L2281988-10-12012 October 1988 Forwards AEOD/e807, Pump Damage Due to Low Flow Cavitation, in Response to Action Item 5 Assigned by EDO in 880406 Memo Re Diagnostic Evaluation Team Rept for Plant. NRR Issued Bulletin 88-004 Addressing Recirculation Problem ML20204J5841988-10-12012 October 1988 Forwards AEOD/E807, Pump Damage Due to Low Flow Cavitation, in Response to Item 5 of Actions Directed by EDO to Respond to Diagnostic Evaluation Team Rept.Nrr Issued Bulletin 88-004 Addressing Low Flow Problem 1990-02-26
[Table view] |
Text
OP700hAL FDstas $40. 40 Eetesal.e f UNITED STATES COV'ERNMENT Memorandum ;
To : Eber R. Price, Assistant Director DATE: APR 2 1963 Edson G. Case, Assistant Director
, for Facilities Licensing FROM : Division of Licensing and Regulation i P. A. Morris, As,otstant Director for Reactors UTu. bui._
sunJEcT: Division of Compliance i PACIFIC GAS & ELECTRIC COMPANY - BODECA BAY DOCKET No. 50-205 l
Attached is a report by our field inspector of a visit to j the site of the Pacific Gas and Electric Company's proposed j Bodega Bay Atomic Park, Sonoma County, California, on 1 March 19, 1963 i Although the Comtission has not yet authorized construction of this facility, PGkE's plans to construct a nuclear facility at this location have been vigorously opposed by relatively small but well organized and extremely vocal groups of local 3 l citizenry aid conservationists. This opposition has in recent {
weeks manifested itself in repeated charges that unauthorized 1 construction activities were taking place at the site. Protests have been made via the press, radio, television and even in a l letter to Secretary Odall, which was referred to the Director
)
of the Division of Licensing and Regulation for reply. In view of this, it seemed appropriate to visit the site to determine firsthand the nature and extent of the construction 1 activities. Results of our inspectors' visit indicate that all construction activities to date have been well within the letter and intent of 10 CFR 50.10(b).
l
Attachment:
Rpt by R. H. Engelken dtd 3/26/63 Distribution: M i J. R. Sears, Region I gt %
G. A. Blanc, Region II H. D. Thornburg, Region III S
// f,,- '
J, W. Flora, Region IV ,
L -U -
R. H. Engelken, Region V AP Q ,1963 m 4) j
,a yUnkacq '
w bC .
e to vous&Tyy"or
"* 3 l % ~a 4i T M 8709180464 851217? '
PDR FDIeb q.
FIRESTO85-665 PDR .
&_a__ - -___:_=__t____= __ _
- - - - . I-
j
(
C. S. ATOMIC KNERGY COMMISSION R6GION.V DIVISION OF COMPLIANCE I
l By: R. H. Engelken, Reactor Inspector March 26, 1963 I (Supervisory) l Reglun V, Division of Compliance ]
' l
Title:
PACIFIC GAS & ELECTRIC - LODSGA SAf AIDMIC PARK - UNIT NUMBER 1.
DOCKET NO. 50-203
SUMMARY
The site of the Pacific Gas and Electric Company's proposed Bodega Bay Atomic Park, Sonoma Co:nty, California, was visited on March 19, 1963. .
The physical location and characteristics of the site, insofar as could l
{
be determined by visual inspection, appeared to be as described in Section V of the Preliminary Hazards Summary Reporte Except for the erection of a meteorological tower, all on-site construction activities have been limited to excavation, grading and filling the tidelands adjacent to Bodega Harbor. With the exception of the foundation and guy line anchor posts for the meteorological tower, no concrete has been poured on or in the vicinity of the sits.
i All on-site construction activities which have taken place to date '
appear to be in accord sith the intent and letter of Section 50.10(b) i of 10 CFR Part 50.
DETAILS
- 1. Scope of Visit The site of the Pacific Gas and Electric Compemy's proposed Bodega '
Bay Atomic Park, Sonoma County, California, was visited by R. H. Engelken and G. S. Spencer, Region V, Division of Compliance on March 19, 1963 The principal purpose of the visit was to determine the nature and extent of construction activities at the site. It had been alleged or
) inferred by opponents of the proposed plant in newspaper articles, l~ television and radio interviews and in letters to the Commission that l' the construction activities which w e currently in progress were in l violation of local and federal regulations.
(continued)
)g
i
(
, )
Scope of Visit (continued)
The visit included an extensive tour of_the entire 225 acre site, much of the adjacent property owned by the University of California and a temporary access road which parallels the route of the permanent site access read which is currently in the early stages of construction. ,
Mr. Charles Joslin, Resident Engineer for Pacific Gas and Electric Company, accompanied the inspectors during the tour.
II. Results of Visit A. General An extensive tour of the site and adjacent areas indicated that j the physical location and characteristics of the site are substantially as described in the Preliminary Hazards Summary Report.
It was observed that a house was located closer to the site than the It mile distance referred to in paragraph 4.d.,Section V of the Preliminary Hazards Summary Heport. Mr. Joslin explained that house had 3 never been a dwelling but was an uninhabited " prop" specially constructed I for use in filming the motion picture "The Birds", produced by Alfred i
Hitchcock.
A herd of cows was observed to be grazing on the site. Mr. Joslin explained that the former owner of the property which comprises part of !
the site had leased the pasture lands on the Head to local farmers for '
grazing purposes. Mr. Joslin said that he thoughtthat the lease had been included as a condition of the sales contract with the former owner. He said that he believed that the lease would expire sometime before the end j of the year.
Several large open tanks were observed to be installed near the cliffs on the western side of the Head in the vicinity of the proposed location for the discharge of coolant water. Joslin stated that these tr.nks had been used for mixing and storing aniline dyn used to study the diffusion characteristics of the ocean in the vicinity of the discharge tunnel outfall. Diffusion tests were not in progress during the visit, but Joslin said that a large number of tests had been conducted over a two-week period just prior to the visit. Joslin was not familiar with the results of the tests.
(continued) e 1
1 O,
1..
t
.m _ _ _ __ . _ _
w
( l
( l
. l Results of Visit (continued)
B. Construction Activities Construction activity in progress during the visit consisted of excavation, the Head.
grading and filling of the tidelands on the eastern side of ;
Earth being excavated from the proposed reactor building site was being used to fill the tidelands east of the reactor and to i grade the approaches of the plant access road. Joslin stated that j approximately 40 men were engaged in this activity. 1 1
A 250-foot meteorological tower has been erected on the location I shown in Figure II-2. (Site Plan) of the Preliminary Hazards Summary Report.
Except for the foundation and guy line anchor posts associated with this tower, no concrete has been poured on the site. Joslin stated that it {
l will completed.
are be several months before the current excavation and grading activities j I
installed.Instrumentation for the meteorological tower' has not yet been A small wooden instrument shack to house the instruments has been erected near the base of the tower.
l l
i 1
e4
r !h' d c. a '
W l$ ,. , 1 hi
-Ap' . .- ,
it. G '
r, I
i l
~
~TROMs DATE OF DOCUMENT DATE RECE!YED NO.s e
Complier,te ,
4 /7 // ' ' I /' '
' #10
, gg, LTR.
MEMOS i REPORTS OTHERs 4
i TOs ORIG.s CCs - OTHI2u !
i
%,.rtte 5 ACTION NECEs& ART
] CONCURRENCE ] DATE ANSWERED: .
NO ACTION NECESSARY C COMMENT BTs '
CLASSIF.s POST Orf1CE TILE CODES I
' .11 REO. NO:
\
- D28CRIPTIOWs (Must De Uaata..iand) REFERRED TO DATE RECEIVED BT DATE i
4 scif kr We t. X1ect.rie Cors;may-Sadara l 1sq %cnnt zo. Sc.?0$ CM* $' 'I'*) h/P l
Pease A /,
. EmCLOSuREsa rti by 4 ne wn.: n.n ata 7/g/43 Mem L /, !
9:.206 6 /,
I \
' 1 i
l I
REMARE8s
- l 1
i I