ML20212L938

From kanterella
Jump to navigation Jump to search
Notifies of ACRS Diablo Canyon Subcommittee 780524-25 Meeting in Washington,Dc to Discuss Seismic Design Basis & Seismic Design,Including Tsunamis,Asymmetric Loads,Sys for Safe Shutdown & Probability Studies.Agenda Forthcoming
ML20212L938
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 04/10/1978
From: Allison D
Office of Nuclear Reactor Regulation
To:
NRC
Shared Package
ML20150F500 List: ... further results
References
FOIA-86-391 NUDOCS 8608250309
Download: ML20212L938 (1)


Text

n

(

l o.oR 101978 9

)(1 NOTE TO: ATTACHED LIST FROM:

D. Allison Project Manager, Light Water Reactors Branch No.1, DPM

SUBJECT:

DIABLO CANYON ACRS SUBCOMMITTEE The Diablo Canyon Subcomittee meeting is currently scheduled for May 24 and May 25, 1978 in Washington.,

The main subjects will be the seismic design basis and the seismic design, including such related items as tsunamis, asymetric loads, systems for safe shutdown and probability studies. The ACRS may also want to discuss some non-seismic issues.

I will let you know as soon as a specific agenda is developed.

Original Signed By Dennis P. Allison D. P. Allison, Project Manager Light Water Reactors Branch No.1 Division of Project Management.

f Distribution:

pocketFiles LWR #1 Files I

i i

8608350309 860001 i

PDR FOIA l

HOUCH36-391 PDR I

_M DPM: LWR #1 DPM: LWR #1 II DAllison:t;b JSto b 4/10/78 M f/10/7 O

-l wac roax ne c,.u> nucu ouo

  • u.

- -.m..'.,,

.n -

u g Q.g.gf j

h-IOS ins