Summary of 760623 Meeting W/Util in San Francisco,Ca Re Plant Seismic Design Reevaluation.List of Attendees Encl
ML20212L190
Person / Time
Site: 05000000, Diablo Canyon
Issue date: 07/06/1976
From: Allison D
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20150F500 List: ... further results
References
FOIA-86-391 NUDOCS 8608250243
Download: ML20212L190 (3)


Text

(

(

JUL 06 B16 i

Docket flos: 50-275 and 50-323 Applicant: Pacific Gas and Electric Company (PGSE)

Facility: Diablo Canyon Nuclear Power Station, Units 1 and 2 (Diablo Canyon)

SUMMARY

OF MEETING HELD OM JUNE 23, 1976 TO DISCIISS DIABLO CANYON SEISMIC DESIGN REEVALUATI0'!

I I

We met with the applicant on June 23, 1976 in San Francisco, California to discuss the seismic design reevaluation of Diablo Canyon.

I A list of attendees is provided in the Enclosure.

At a previous neeting on June 10, 1976, the applicant's consultant, Dr. John A. Blume, had described his work, which would fom the bases for a recomendation concerning design response spectra. However, at the previous meeting Dr. Blume had not yet provided a specific recomendation.

At this meeting (June 23,1976) Dr. Blume discussed ground response spectra for Diablo Canyon which he was prepared to describe to the gp Advisory Comittee on Reactor Safeguards (ACRS) subcomittee on June 25, 1976. Dr. Blume had based his recomendation on 8 rock site records of nearby earthquakes. He had taken the records, reduced the k

high frequency portions of the spectra associated with then according JD to the methods of Scanlan and Yamahara, and then perfomed statistical operations on the spectra to arrive at the recommended values. Since the records had been for smaller earthquakes than the nagnitude 7.5 earthquake that was being considered here, he had raised the low frequency portion of the spectra to confom to the shape of the Regulatory Guide 1.60 spectrum.

l The applicant intended to document the spectra, along with a description l

of their derivation, in an FSAR amendment. We told the applicant that I

we would need to review the FSAR amendment before we could reach a staff l

conclusion concerning the spectra.

l OriginalSigned By

/'

8608230243 860801 Dennis P. Allisog ECHbSN91 D. P. Allison, Pmject M ager PDR Light Water Reactors Br nch No.1 Division of Pro.fect Mananenrnt

.o.

/LLM J

DA cc:

Service List 7/r/76 7/

76 h

uc.m.. mocu.m

,g g

~

8-57 A -57

(

(~

MEETING

SUMMARY

DISTRIBUTION Docket Fil K. Kniel LWR-1 File J. Knight NRC PDR G. Knighton Local PDR W. Kreger TIC G. Lainas

~

ACRS (16)

R. Maccary IE V. Moore OELD J. Muller R. Ballard T. Novak V. Benaroya 0 Parr R. Boyd S. Pawlicki D. Bunch W. Rsgan E. Hylton D. Ross E. Case Z. Rosztoczy P. Check B. Rusche R. Clark I. Sihweil J. Collins D. Skovholt P. Collins H. Smith (1)

R. Denise M. Spangler H. Denton T. Speis R. DeYoung J. Stepp M. Ernst J. Stolz W. Gammill R. Tedesco

gggy, R. Heineman S. Varga l

C. Heltemes D. Vassallo R. Houston R. Vollmer L. Hulman F. Williams T. Ippolito B. Youngblood Saul Levine Project Manager P. Y. Chen Participants K. Kapur R. Hofmann bec:

J. Devine, USGS F. McKeown, USGS H. Wagner, USGS N. Newmark i

..~ _ _

(*

i s

t ENCLOSURE List of Attendees PG&E F. McJutz R. Bettinger H. Lindblad G. Linfestei A. Shennan PG1E Consultants J. Blume R. Gallagher NRC Staff D. Allison R. DeYoung i

R. Hofmann W

I s..*

U$.

NRC Consultant i

- s I