ML20196F764

From kanterella
Jump to navigation Jump to search
Notification of 990707 Meeting with Util in Arlington,Tx to Discuss Results of Recent Maint self-assessment
ML20196F764
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/23/1999
From: Brockman K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9906290298
Download: ML20196F764 (5)


Text

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _

. . I s se% UNITED STATES

.p t NUCLEAR REGULATORY COMMISSION

$ ,E REGloN IV

$,,4 l *[ .

611 RYAN PLAZA DRIVE, suite 400 ARLtNGToN, TEXAS 76011-8064 JUN 231999 NOTICE OF LICENSEE MEETING Name of Licensee: Nebraska Public Power District Name of Facility: Cooper Nuclear Station Docket: 50-298 Date and Time July 7,1999 of Meeting: 1 - 3 p.m. (CDT)

Location of Meeting: Region IV office Training Conference Room Arlington, Texas Purpose of Meeting: Management meeting to discuss the results of the recent maintenance self-assessment NRC Attendees: E. Merschoff, Regional Administrator K. Brockman, Director, Division of Reactor Projects (DRP)

A. Howell, Director, Division of Reactor Safety C. Marschall, Chief, Project Branch C, DRP D. Loveless, Senior Project Engineer, Project Branch C, DRP Licensee Attendees: M. Peckham, Plant Manager C. Gaines, Maintenance Manager S. Minahan, Work Control Manager G. Cesare, Nuclear Licensing and Safety Manager NOTE:

(1) This meeting is open to attendance by members of the general public.

(2) NRC personnel, not listed above, that desire to attend this meeting should notify Charles Mafschall at 817/860-8185 by COB on July 2.

~

Approved By: ,.

en E. Brbok(gn45irector Division of Resctor Projects 9906290298 990623 PDR ADOCK 05000298 P PDR

y n

Nebraska Public Power District g I

l cc:

G.' R. Horn, Senior Vice President r: of Energy Supply Nebraska Public Power District 141415th Street Columbus, Nebraska 68601 John R. McPhail, General Counsel j Nebraska Public Power District P.O.~ Box 499 Columbus, Nebraska 68602-0499 J. H. Swailes, Vice President of Nuclear Energy Nebraska Public Power District P.O. Box 98 - I Brownville, Nebraska 68321 l B. L. Houston, Nuclear Licensing I and Safety Manager

~ Nebraska Public Power District  ;

P.O. Box 98 I Brownville, Nebraska 68321 i Dr. William D. Leech

' MidAmerican Energy i 907 Walnut Street j P.O. Box 657 i Des Moines, Iowa 50303-0657 '

Mr. Ron Stoddard Lincoln Electric System 1040 O Street -

P.O. Box 80869 Lincoln, Nebraska 68501-0869 Michael J. Linder, Director Nebraska Department of Environmental Quality P.O. Box 98922 Lincoln, Nebraska 68509-8922

' Chairman Nemaha County Board of Commissioners Nemaha County Courthouse l 1824 N Street Auburn, Nebraska 68305

Nebraska Public Power District Cheryl Rogers, Program Manager Public Health Assurance

,, Consumer Service Section -

Nebraska Health and Human Services 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509-5007 R. A. Kucera, Department Director of Intergovernmental Cooperation Department of Natural Resources P.O. Box 176 Jefferson City, Missouri 65102 Jerry Uhlmann, Director State Emergency Management Agency P.O. Box 116 -

Jefferson City, Missouri 65101 Diane Burton

' Heartland Operation to Protect the Environment

- 1903 North Street Auburn, Nebraska 66305.

Kansas Radiation Control Program Director j s I

.- e Nebraska Public Power District J.N 2 31999 bec:

DMB (IE 45)

OEDO RIV Coordinator (16E15)

ORA File RIV File E-Mail To

() NRC Attendees PMNS Mtg Announcoment Coordinator PAB DEDR FJM A/D/NRR BWS- Acting, ADT/NRR BAB2 Acting ADP/NRR LJB . L. Burkhart, Project Manager, NRR OEMAIL D/OE MHM M. Miller, Senior Resident inspector CAH C. A. Hackney, RSLO GFS G. F. Sanborn, EO BWH B. Henderson, PAO JAC1,CJG RA Secretaries LAT, DLF, LJB1 DRP Division CLG, LMB,NLH _ DRS Division -

CMS, WSW, NSL DNMS Division 1 PDP D. Papa LPL P.Longdo 1

DOCUMENT NAME: R:\._CNS\CN7-7MN.DRP k

' To recolve copy of document, Indicate in box: 'C" = Copy without enclosures *E" = Copy with enclosures *N" = No copy RIV:C:DRP/C PAO M RSLO / D:DRP CSMarschall;dfCJV\ BWHendersI)n CAHackney KEBrockman # '

6/'Of/99 6/ 0 /99 6/D /99 6/Th/99 OFFICIAL RECORD COPY '

.-.e 1

Nebraska Public Power District M 231999 bec:

dbhdadsdehua OEDO RIV Coordinator (16E15)

', ORA File RIV File E-Mail To

() NRC Attendees PMNS Mtg Announcement Coordinator PAB DEDR FJM A/D/NRR BW3 Acting, ADT/NRR BAB2 Acting ADP/NRR LJB L. Burkhart, Project Manager, NRR OEMAIL D/OE MHM M. Miller, Senior Resident inspector CAH C. A. Hackney, RSLO GFS G. F, Sanborn, EO

-BWH B. Henderson, PAO JAC1,CJG- RA Secretaries LAT, DLF, LJB1 DRP Division CLG, LMB, NLH DRS Division CMS, WSW, NSL DNMS Division j PDP D. Papa l

.LPL P.Longdo

. l I

\ i D

h

' DOCUMENT NAME: R:\ CNS\CN7-7MN.DRP To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copv RIV:C:DRP/C PAO Nr\ RSLO / D:DRP l )

CSMarschall;dfCM BWHenderson CAHackney KEBrockman #

6/ff/99 - 6/ O /99 6/D /99 6/f;/99 OFFICIAL RECORD COPY ' i 4

i j