EPID:L-2019-LLA-0184, Proposed License Amendment Request to Revise the Oconee Nuclear Station Current Licensing Basis for High Energy Line Breaks Outside of the Containment Building (Approved, Closed) |
|
MONTHYEARML19242C7282019-08-28028 August 2019 Attachments 5 - 12: Thermal-Hydraulic Models for High Energy Line Break Transient Analysis, Duke Energy/Framatome Affidavits, Regulatory Requirements, Definitions, Time Critical Operator Actions and Feasibility Assessment for New Proposed T Project stage: Request ML19240A9252019-08-28028 August 2019 Proposed License Amendment Request to Revise the Oconee Nuclear Station Current Licensing Basis for High Energy Line Breaks Outside of the Containment Building Project stage: Request ML19242C7002019-08-28028 August 2019 Attachment 3: Updated Final Safety Analysis Report Retyped Changes Project stage: Request ML19301C8892019-10-30030 October 2019 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML19331A5202019-12-12012 December 2019 Summary of Meeting with Duke Energy Carolinas, LLC to Discuss Submitted License Amendment Request for Oconee Nuclear Station, Units 1, 2, and 3 Regarding High Energy Line Break Licensing Basis Project stage: Meeting ML20036E3902020-02-11011 February 2020 Regulatory Audit in Support of Review of License Amendment Request to Revise the Licensing Basis for High Energy Line Breaks Outside of the Containment Building Project stage: Approval ML20125A3612020-05-0606 May 2020 SUNSI Request for Additional Information Revision of Licensing Bases for High Energy Line Breaks Outside of the Containment Building (EPID L-2019-LLA-0184) (Redacted) Project stage: RAI ML20209A4082020-07-29029 July 2020 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance RA-20-0267, Proposed License Amendment Request to Revise Oconee Nuclear Station Current Licensing Basis for High Energy Line Breaks Outside of Containment Building - Responses to Request for Additional Information2020-09-17017 September 2020 Proposed License Amendment Request to Revise Oconee Nuclear Station Current Licensing Basis for High Energy Line Breaks Outside of Containment Building - Responses to Request for Additional Information Project stage: Response to RAI ML20266G2192020-11-0303 November 2020 Regulatory Audit Report Regarding License Amendment Request to Revise the Licensing Basis for High Energy Line Breaks Outside of the Containment Building Project stage: Other ML21006A0982021-03-15015 March 2021 Issuance of Amendment Nos. 421, 423, and 422 Revision of Licensing Basis for High Energy Line Breaks Outside of Containment (EPID L-2019-LLA-0184) (Public Version) Project stage: Approval 2020-02-11
[Table View] |
|
---|
Category:Letter
MONTHYEARML24255A3322024-10-16016 October 2024 SLRA - Revised SE Letter ML24297A6172024-10-11011 October 2024 PCA Letter to NRC Oconee Hurricane Helene ML24269A0912024-10-0909 October 2024 Request for Withholding Information from Public Disclosure IR 05000269/20243012024-09-23023 September 2024 NRC Operator License Examination Report 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML24145A1782024-08-26026 August 2024 Issuance of Amendment Nos. 430, 432, and 431, to TS 5.5.2, Containment Leakage Rate Testing Program for a one-time Extension of the Type a Leak Rate Test Frequency IR 05000269/20240052024-08-26026 August 2024 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) ML24220A1092024-08-0808 August 2024 – Operator Licensing Examination Approval 05000269/2024301, 05000270/2024301, and 05000287/2024301 05000287/LER-2024-001, Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation2024-08-0202 August 2024 Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation IR 05000269/20240102024-08-0101 August 2024 Focused Engineering Inspection - Age-Related Degradation Report 05000269/2024010 and 05000270/2024010 and 05000287/2024010 IR 05000269/20240022024-07-25025 July 2024 Integrated Inspection Report 05000269/2024002 and 05000270/2024002 and 05000287/2024002 ML24192A1312024-07-15015 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML24183A2352024-06-29029 June 2024 Update 3 to Interim Report Regarding a Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24179A1102024-06-27027 June 2024 Submittal of Updated Final Safety Analysis Report Revision 30, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000269/20240012024-05-0303 May 2024 Integrated Inspection Report 05000269/2024001, 05000270/2024001 and 05000287/2024001 IR 05000269/20244022024-04-24024 April 2024 Security Baseline Inspection Report 05000269/2024402 and 05000270/2024402 and 05000287/2024402 ML24108A0792024-04-16016 April 2024 EN 57079 Paragon Energy Solutions Email Forwarding Part 21 Interim Report Re Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 IR 05000269/20244012024-03-28028 March 2024 – Security Baseline Inspection Report 05000269-2024401 and 05000270-2024401 and 05000287-2024401 ML24088A3052024-03-25025 March 2024 Fws to NRC, Agreement with Nlaa Determination for Tricolored Bat for Oconee Lr IR 05000269/20230062024-02-28028 February 2024 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 - (NRC Inspection Report 05000269/2023006, 05000270/2023006, and 05000287/2023006) ML24045A3062024-02-16016 February 2024 Ltr. to Michell Hicks, Principal Chief Eastern Band of Cherokee Re Oconee Nuclear Station Units 1,2, and 3 Section 106 ML24045A2962024-02-16016 February 2024 Ltr. to David Hill Principal Chief Muscogee Creek Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2972024-02-16016 February 2024 Ltr. to Dexter Sharp Chief Piedmont American Indian Assoc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3012024-02-16016 February 2024 Ltr. to Harold Hatcher Chief the Waccamaw Indian People Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3052024-02-16016 February 2024 Ltr. to Louis Chavis Chief Beaver Creek Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3042024-02-16016 February 2024 Ltr. to Lisa M. Collins Chief the Wassamasaw Tribe of Varnertown Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3022024-02-16016 February 2024 Ltr. to Joe Bunch United Keetoowah Band of Cherokee Indians in Ok Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3032024-02-16016 February 2024 Ltr. to John Creel Chief Edisto Natchez-Kusso Tribe of Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24030A0052024-02-16016 February 2024 Ltr. to Brian Harris, Chief, Catawba Indian Nation; Re., Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2952024-02-16016 February 2024 Ltr. to Chuck Hoskin, Jr, Principal Chief Cherokee Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2942024-02-16016 February 2024 Ltr. to Carolyn Chavis Bolton Chief Pee Dee Indian Nation of Upper Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2992024-02-16016 February 2024 Ltr. to Eric Pratt Chief the Santee Indian Organization Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3082024-02-16016 February 2024 Ltr. to Ralph Oxendine Chief Sumter Tribe of Cheraw Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3072024-02-16016 February 2024 Ltr. to Pete Parr Chief Pee Dee Indian Tribe Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24011A1482024-02-13013 February 2024 Letter to Steven M. Snider-Oconee Nuclear Sta, Unites 1,2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants ML24011A1532024-02-13013 February 2024 Letter to Tracy Watson EPA-Oconee Nuclear Sta, Unites 1, 2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants IR 05000269/20230042024-02-13013 February 2024 Integrated Inspection Report 05000269/2023004, 05000270/2023004, and 05000287/2023004; and Inspection Report 07200040/2023001 ML24019A1442024-02-13013 February 2024 Letter to Reid Nelson, Executive Director, Achp; Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24030A5212024-02-13013 February 2024 Letter to Elizabeth Johnson, Director, SHPO; Re Oconee Nuclear Stations Units 1, 2, and 3 Section 106 ML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staffs Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion ML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 2024-09-23
[Table view] |
Text
July 29, 2020 Mr. J. Ed Burchfield, Jr.
Site Vice President Oconee Nuclear Station Duke Energy Carolinas, LLC 7800 Rochester Highway Seneca, SC 29672-0752
SUBJECT:
OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (EPID NO. L-2019-LLA-0184)
Dear Mr. Burchfield:
By letter dated June 15, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20168A980), Duke Energy Carolinas, LLC (the licensee) submitted an affidavit dated June 3, 2020, executed by Steve Snider, Vice President of Nuclear Engineering, Duke Energy Carolinas, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390 for Oconee Nuclear Station, Units 1, 2, and 3:
Enclosure 3 of the Oconee responses (correspondence no. RA-20-0170 [letter dated June 15, 2020]) to the Requests for Additional Information (RAI) issued by the Office of Nuclear Reactor Regulation.
The Duke Energy affidavit dated June 3, 2020, stated in Attachment 1 of letter dated June 15, 2020, that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
- 4. Pursuant to the provisions of paragraph (b) (4) of 10 CFR 2.390, the following is furnished for consideration by the NRC in determining whether the information sought to be withheld from public disclosure should be withheld.
(i) The information sought to be withheld from public disclosure is owned by Duke Energy and has been held in confidence by Duke Energy and its consultants.
(ii) The information is of a type that would customarily be held in confidence by Duke Energy. Information is held in confidence if it falls in one or more of the following categories.
(a) The information requested to be withheld reveals distinguishing aspects of a process (or component, structure, tool, method, etc.) whose use by a vendor or consultant, without a license from Duke Energy, would constitute a competitive economic advantage to that vendor or consultant.
J. E. Burchfield, Jr. (b) The information requested to be withheld consist of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), and the application of the data secures a competitive economic advantage for example by requiring the vendor or consultant to perform test measurements, and process and analyze the measured test data.
(c) Use by a competitor of the information requested to be withheld would reduce the competitor's expenditure of resources, or improve its competitive position, in the design, manufacture, shipment, installation assurance of quality or licensing of a similar product.
(d) The information requested to be withheld reveals cost or price information, production capacities, budget levels or commercial strategies of Duke Energy or its customers or suppliers.
(e) The information requested to be withheld reveals aspects of the Duke Energy funded (either wholly or as part of a consortium) development plans or programs of commercial value to Duke Energy.
(f) The information requested to be withheld consists of patentable ideas.
The information in this submittal is held in confidence for the reasons set forth in paragraphs 4(ii)(a) and 4(ii)(c), above. Rationale for this declaration is the use of this information by Duke Energy provides a competitive advantage to Duke Energy over vendors and consultants, its public disclosure would diminish the information's marketability, and its use by a vendor or consultant would reduce their expenses to duplicate similar information. The information consists of analysis methodology details that provides a competitive advantage to Duke Energy.
(iii) The information was transmitted to the NRG in confidence and under the provisions of 10 GFR 2.390, it is to be received in confidence by the NRG.
(iv) The information sought to be protected is not available in public to the best of our knowledge and belief.
(v) The proprietary information sought to be withheld in the RAI response is that which is marked by brackets in the responses to the RAls in Enclosure 3. These are responses to the RAls for the Oconee License Amendment request which proposes to update the Updated Final Safety Analysis Report (UFSAR) regarding the High Energy Line Break (HELB) licensing basis. This information is consistent with marked proprietary information in the NRG-approved Duke Energy methodology reports DPC-NE-3000-PA, DPC-NE-3003-PA, and DPC-NE-3005- PA. This information enables Duke Energy to:
J. E. Burchfield, Jr. (a) Support license amendment requests for its Oconee reactors.
(b) Perform transient and accident analysis calculations for Oconee.
(vi) The proprietary information sought to be withheld from public disclosure has substantial commercial value to Duke Energy.
(a) Duke Energy uses this information to reduce vendor and consultant expenses associated with supporting the operation and licensing of nuclear power plants.
(b) Duke Energy can sell the information to nuclear utilities, vendors, and consultants for the purpose of supporting the operation and licensing of nuclear power plants.
(c) The subject information could only be duplicated by competitors at similar expense to that incurred by Duke Energy.
- 5. Public disclosure of this information is likely to cause harm to Duke Energy because it would allow competitors in the nuclear industry to benefit from the results of a significant development program without requiring a commensurate expense or allowing Duke Energy to recoup a portion of its expenditures or benefit from the sale of the information.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the submittal in accordance with the requirements of 10 CFR 2.390 and, based on the statements in the affidavit, has determined that the submitted information sought to be withheld (i.e., Attachment 4) contains proprietary commercial information and should be withheld from public disclosure. Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, the NRC may send copies of this information to its consultants. The NRC will ensure that its consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, the licensee should promptly notify the NRC. The NRC may revisit this determination in the future if, for example, the scope of a Freedom of Information Act request includes this information. The NRC will notify the licensee in advance of any public disclosure if the NRC makes such a determination.
J. E. Burchfield, Jr. If you have any questions regarding this matter, please contact me at (301) 415-3867 or Michael.Mahoney@nrc.gov.
Sincerely,
/RA/
Michael Mahoney, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287 cc: Mr. Steve Snider Vice President, Nuclear Engineering Duke Energy Carolinas 7800 Rochester Highway Seneca, SC 29672-0752 Additional Distribution via Listserv
ML20209A408 *Via e-mail OFFICE NRR/DORL/LPL2-2/PM* NRR/DORL/LPL2-1/LA* NRR/DSS/SNSB/BC*
NAME MMahoney KGoldstein SKrepel DATE 07/28/2020 07/28/2020 07/23/2020 OFFICE NRR/DORL/LPL2-1/BC* NRR/DORL/LPL2-2/PM*
NAME MMarkley MMahoney DATE 07/29/2020 07/29/2020