ML20207Q732
| ML20207Q732 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 04/21/1983 |
| From: | Shiffer J PACIFIC GAS & ELECTRIC CO. |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML20204G536 | List: |
| References | |
| FOIA-86-151, FOIA-86-197 NUDOCS 8703050198 | |
| Download: ML20207Q732 (1) | |
Text
j q-yf e J PACIFIC GAS AND E LE C T R,I C COMPAN' E:.?j LOGWlE l-],
s.
77 BE ALE STREET SAN FRANCISCO, CALIFOnNIA 94106- (415) 7814211 Twx 910372 6587 G
F, saws o,,sgmn g.
h.,
e...,ue i c.,
vet t..
t.~1 c.i n.sc~s NvCit.a pC*ta CENE 7cq April 21, 1983
.Mr. John B. Martin, Regional Administrator U.S. Nuclear Regulatory Ccr.nission, Region V 1450 Maria Lane, Suite 210 rialnut Creek, CA 94506-5368 P.e: Docket No. 50-275, OL-DH1-76 Diablo Canyon Unit 1 RCP Cold Ceg Piping Event
Dear Mr. "artin:
This confims a telephone call of 3:30 p.m. on April 20, 1983 between J. D. Tcusend of pGandE and T. Bishop of NRC Region V.
This notification was mde pursuant to Technical Specification 6.9.1.12.c for Unit 1.
During the reinstallation of the radiant insulation on the discharge piping of reactor coolant pump number thme, workers discovered grinder and rotary file gouges.in four areas on the piping surface; near the reactor coolant pump casing weldrent.
An investigation is currently underway to detemine the probable cause followed by approved corrective action.
The investigation will attenpt to detennine if the damge was the result of industrial sabotage.
In the event that the gouges are attributed to sabotage, notification will be mde pursuant to 10 CFR Part 73.71 as discussed with Mr. McQueen of NRC Region V.
Corrective action is being detemined and will be included in the
~ Licensee Event Report which will follow by May 3,1983.
Since ly, JDS:vk N0YE G C' cc:
Service List 8703050198 870226 f PDR FOIA HOLMES86-151 PDR R L '7