ML20207Q719

From kanterella
Jump to navigation Jump to search
Partial Response to FOIA Request for Documents of H Schierling from Sept 1981 - Dec 1983 Re Plant.Encl App Q Documents & Documents Listed in App P Available in PDR
ML20207Q719
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/26/1987
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Holmes G
MHB TECHNICAL ASSOCIATES
Shared Package
ML20204G536 List:
References
FOIA-86-151, FOIA-86-197 NUDOCS 8703050094
Download: ML20207Q719 (4)


Text

,

) U.S. NUCLEAR REGULATORY COMMISSION oc soia rioutst s.vvetrass 4 / *'ag .

F01 A-86-151/197 EtseoNst net 7

s* Y l RESPONSE TO FREEDOM OF l '**' I X l "^'

INFORMATION ACT (FOlA) REQUEST '"g e g g DOCatt NUM6tR;St Wappka6W REQUESTER Mr. Gregory A. Holmes PART 1.-RECORDS RELEASED OR NOT LOCATED (See checked bonest No agency records subrect to the request have been located.

No addstenal agency records subject to the request have been located.

    • "'"''"6 ' ' ' " * ' ' " * * ' ' " * *"*d '" ^***"d', P , ,,,,,,,,oy ,,,,,bi,,or public inspection and copytng in the NRC Public Document Room, X ^1717 H Street, N.W.,Washmgton, DC . '

)( Agency records subrect to the request that are identded in Appendis O are being made avaiiabie for pubiae inspecten and copying in the NRC Puolic Document Room,1717 H Street, N.W., Washmgton, DC, in a folder under this FOIA number and requester nyne.

The nonpropretary version of the proposaHz) that you agreed to accept in a telephone corwersation with a enember of my staff is now becg made avalable for public inspecten and coymg at the NRC Pubhc Document Room,1717 H Street, N W , Washington, DC. in a folder under this FOIA number and requester name.

Enclosed is mforrnaten on how you may obtam access to and the charges for copying records placed in the NRC Publ c Document Room,1717 H Street, N W., Washington, DC.

Agency records subject to the request are enclosed. Ary arpikable c%rge for copies of the records provided and payment procedures are noted the comrnents secten.

Recorda subt ect to the request have been referred to another Federst agencytest for revew and direct response to you.

In view of NRC's response to the request, no further accon is being taken on appeal letter dated PART ll.A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certain informaten in the requested records is being w thheio from public disclosure pursuant to the FOlA esemptons described in and for the reasons stated in Part it, sec-tens 8. C. and D. Any released portens of tne documents for which only part of the record is being withhold are being made avadable for public inspection and copying a the NRC Pubhc Document Room,1717 H Street, N.W., Washington, DC, in a folder under this FOlA number and requester name.

Comments Enclosed are five printouts which list Commission Letters, Board Notifications, Commission Transcripts and Letters to the Licensee. The items in Mr. Schierling's chron files are highlighted in yellow. There is a possibility that some of the listed records are duplicates of those previously furnished in response to your r; quest.

8703050094 870226 PDR FOIA HOLMES86-151 PDR

/l ,

s OR, 0 0F s

s NRC FORM 464 erant n Gasi w i

I\

w  :-

Re: F01A-86-151 APPENDIX P

1. 9/24/82 Memo from Dircks to Chairman Palladino et al.,

Subject:

Diablo Canyon Design Verification Program. (28 pages)

ANO: 8210130056

2. 9/29/82 Memo from Eisenhut to Chairman Palladino et al.,

Subject:

Information Items Regarding the Design Verification Program for Diablo Canyon, Unit 1, (Board Notification No.82-100).

(3 pages) AN0: 8211010059 3, 10/13/82 Memo from Dircks to Commissioners (SECY-82-414),

Subject:

Diablo Canycn Design Verification Program - Phase II Recommendations. (61 pages) AN0: 8210290214 l

l l

l l

I l

l l

1 Re: F01A-86-151 APPENDIX Q

1. 3/23/82 Ltr from Fleischaker to Shewman,

Subject:

Diablo Canyon.

(20 pages)

2. 4/22/82 Memo from McKinley to Jones,

Subject:

Diablo Canyon Seismic Reevaluation. (3 pages)

3. 4/23/82 Ltr from Fraley to Fleischaker,

Subject:

Diablo Canyon.

(2pages)

4. 5/19/82 Ltr from Panetta to Director, Office of Congressional Liaison,NRC,

Subject:

Diablo Canyon. (3 pages)

5. 8/4/82 Memo from Crews to Miraglia,

Subject:

Diablo Canyon Modifications. (3 pages)

6. 10/1/82 Memo fro:n Engelken to Eisenhut,

Subject:

Adjunct Program for the Evaluation of Diablo Canyon Construction Quality Assurance. (3pages)

7. 10/1/82 Memo from Crews to Kerrigan,

Subject:

Diablo Canyon Modifications. (3 pages)

8. 12/22/82 Memo from Crews to Knighton,

Subject:

Diablo Canyon Modifications. (6 pages) t 9. 1/14/83 Memo from Crews to Knighton,

Subject:

Diablo Canyon Modifications. (5 pages)

) 10. 2/24/83 Status Report - Requiring briefing and Monthly Status l

Report on the Diablo Canyon Reverification Program.

t (3 pages) 11, 4/27/83 Memo from Crews to Eisenhut,

Subject:

Recommendation for Diablo Canyon Board Notification. (2 pages)

12. 5/12/83 Memo from Crews to Eisenhut,

Subject:

Recommendation for Diablo Canyon Board Notification. (6 pages)

13. 5/19/83 Ltr from Bishop to Crane,

Subject:

Special Inspection.

(29pages)

14. 7/8/83 Notice of Significant Licensee Meeting. (3 pages)
15. 7/19/83 Memo from Bishop to Knighton,

Subject:

Recomendation for Diablo Canyon Board Notification. (1 page)

16. 8/8/83 Memo from Fraley to Dircks,

Subject:

Commissioner Gilinsky's request for ACRS comments on the use of the TAU effect. (2 pages)

c ~, y ,.. , . ,

  • - e 'el o .'. . , . N, . ,.

, t..

}

c s  ? ,  ;

ry

, Rei F01A-86-151 m '

APPENDIX Q P

(Continued) ,_

17, 10/83 Memo from Martin to Denton,

Subject:

PG&E, Diablo Canyon, '

Unit 1, Reinstatement of License. (9pages) '

/= <

, r

18. 10/14/83 - Memo from Bishop to Miller,

Subject:

Review subject ,to 10 CFR170,11, Fees-DiabloCanyonUnits1&2.;,(5pages) 3

19. 10/20/83 Memo from Bishop to Schierling, Subjeht: The Commission's y , .

Request, for Information on the Extent of Sampling'#.; Regire,d V's - '

Inspection Program with Respect to Construction Acti'/ities.

(1 page) ,/

20. 11/1/83- Ltr Monthly PGporc for the Month September 1083. ,

(13 pages) '

a  :

21. 12/8/83 Memo f rom MeXinley to ACRS Members, Subjectr Diablo ,

Canyon Status Report, December 1983. (.?pages) ,

- s

22. 12/8/83 Memo from Bishop to Eisenhut,

Subject:

Recommendation-f',r- ,

Diablo Canycn Board Notification. (2pages) ,- r,. -

23. 12/20/83 Memo from Bishop to Eisenhut,

Subject:

Review and -

Acceptance of Diablo Canyon Operations QA Program. (l'page) k

/

t

?

/

8 l j

  • l

+

1 e.

)

~ ,

, i o

9

(

/

- = - - . . - - _ . . _-,.-_-.,,-,.,,----,_....-,,.,-..,-.,.g*

,-,g-